Attachment A SON.pdf
PDF 327 KB Posted
- Attached to
- 435 CTS MAAS TRAILERS
- Solicitation number
- F3N0424081A001
About this file
This document is a Statement of Need (SON) from the 435th Construction and Training Squadron to the 700 Contracting Squadron at Ramstein Air Base, Germany. The SON requires the acquisition of four (4) new Mobile Aircraft Arresting System (MAAS) trailers, including shipping and freight. The MAAS trailers must meet specific requirements, such as including BAK-12 Energy Absorber Unit mounting hardware, Stanley hydraulic power units, bi-directional anchoring hardware, and other accessories. The vendor must be authorized and First Article Tested approved by the Service Engineering Support Activity. Deliveries are required during normal business hours, Monday through Friday, excluding German and American holidays. The related federal contract opportunity is Solicitation Number F3N0424081A001, issued by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa, for the acquisition of the four MAAS trailers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MAAS Trailer Figure Sheet.pdf | ||
| Combo_SynopsisSolicitation_MAAS Trailers.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DDEPARTMENT OF THE AIR FORCE
435TH AIR GROUND OPERATIONS WING (USAFE)
435TH AIR EXPEDITIONARY WING (AFAFRICA)
RAMSTEIN AIR BASE GERMANY
STATEMENT OF NEED
FROM: 435 CTS Construction and Training Squadron, Ramstein Air Base, Germany
TO: 700 Contracting Squadron, Ramstein Air Base, Germany
SUBJECT: Mobile Aircraft Arresting System Trailers for Aircraft Arresting Systems
1. General description:
The 435th Construction and Training Squadron requires the acquisition of 4 Mobile Aircraft Arresting Systems (MAAS's) including shipping and freight. The request includes 4 MAAS trailers. These are necessary for the supplement of our degrading trailers in order to continue our operations and enable fighter aircraft sorties in EUCOM and AFAFRICA.
2. Minimum specific requirements:
MAAS Trailer Part # 9D01164-905 Each trailer shall be new and shall include BAK-12 Energy Absorber Unit (EAU) mounting hardware, Stanley hydraulic power units, bi-directional anchoring hardware and installation and removal tools, rubber filled tires and manual pendant rewind kit.
3. First Article Testing:
Vendor must be authorized, and FAT approved by the Service Engineering Support Activity (ESA) in accordance with AFI 20-106, which is the Aircraft Arresting System (AAS) engineer at Warner Robins Air Logistics Complex (WR-ALC).
4. Hours of operation:
4.1. All deliveries shall be performed during, normal work hours between 08:00 and 15:00 hours, Monday through Friday. No deliveries will be required on German or American Holidays.
4.2. All deliveries shall be performed as coordinated with the designated POC.