Attachment A-Schedule.pdf

PDF 88 KB Posted

Attached to
F018--JC & JB Bio-Retention Pond Restoration and Stewardship (VA-20-00045949)
Solicitation number
36C25520Q0312_1
Issued by

About this file

This document contains an attachment schedule and description of bio-retention ponds and areas requiring restoration and stewardship services at two VA locations. The schedule lists over 50 ponds and other areas at the John Cochran and Jefferson Barracks facilities totaling over 150,000 square feet. Services include restoration of ponds and drainage features, installation of riprap, planting of beds, and annual stewardship visits. The federal contract opportunity seeks a qualified contractor to provide all labor, equipment, supervision and waste disposal for restoration of the listed ponds and areas, as well as ongoing annual stewardship visits. The solicitation was issued by the VA Heartland Network 15 Contracting Office in Leavenworth, KS for the Department of Veterans Affairs Veterans Health Administration VISN 15. The response deadline is not provided.

View the file

Other files

File Type Posted
Attachment C- Maps.pdf PDF
Attachment B- Field Report.pdf PDF
Attachment D- Wage Determination 1997-0149.pdf PDF
36C25520Q0312.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A – Schedule or Price and Delivery

Jefferson Barracks

Permit No.

Name of Area

Description Approx.

Square Feet

Restoration Cost

# of Visits / Year

Per / Visit Cost

Stewardship / Year Cost

P-0004047-05 Energy Plant Pond 1 8,739 8 Pond 2 7,727 8 Drain 1 170 4 Drain 2 170 4 Riprap Channel 3,780 4

P-0004047-06 Clinic Bldg.

(Bldg. 55)

Pond 1 16,395 8 Pond 2 7,525 8 Pond 3 555 8 Pond 4 2,350 8 Pond 5 5,144 8 Planting Beds 2,379 8 Light Wells 630 6

18MSD-00328 Engineering Warehouse (Bldg. 57)

Green Roof 25,295 6

P-29881-00 Impact Parking Pond 1 6,152 4 Drain 1 300 4 Drain 2 210 4 Riprap Channel 2,420 4

P-0004047-11 Bldg. 25 Pond 1 1,373 8 Riprap Channel 700 4

P-0004047-12 Tenant Bldg.

(Bldg. 56)

Pond 1 7,277 8 Pond 2 14,970 8 Green Roof 5,266 6

Entrance 525 8 Planting Beds

& Planters 1,800 8

Jefferson Barracks – Areas to be added

Square Feet

Restoratio n Cost

# of Visits / Year

Per / Visit Cost

Stewardship / Year Cost

18MSD-00192 Rehab Bldg.

(Bldg. 54)

Pond 1 1,906 8 Pond 2 1,024 8

Pond 3 882 8 Pond 4 229 8 Pond 5 226 8 Pond 6 226 8 Pond 7 305 8 Pond 8 384 8 Pond 9 227 8 Pond 10 226 8 Pond 11 463 8 Pond 12 330 8 Pond 13 226 8 Pond 14 226 8 Pond 15 465 8 Pond 16 359 8 Pond 17 226 8 Pond 18 226 8 Pond 19 215 8 Pond 20 1,730 8 Pond 21 241 8 Pond 22 1,126 8 Pond 23 969 8 Planting Beds 1,500 8

P-0004047-06 Clinic Bldg.

(Bldg. 55)

Retaining Wall 2,500 8

18MSD-00328 Eng.

Warehouse Pond 1 TBD 8

Pond 2 TBD 8

Part 1 (Bldg.

57) Pond 3 TBD 8

Pond 4 TBD 8 Pond 5 TBD 8 Pond 6 TBD 8 Pond 7 TBD 8 Pond 8 TBD 8 Pond 9 TBD 8 Pond 10 TBD 8 Pond 11 TBD 8 Pond 12 TBD 8 Pond 13 TBD 8 Pond 14 TBD 8 Pond 15 TBD 8 Pond 16 TBD 8 Pond 17 TBD 8

19MSD-00268 Eng.

Warehouse- Part 2 (Bldg.

57)

Pond 1 TBD 8

Pond 2 TBD 8 Pond 3 TBD 8 Pond 4 TBD 8 Pond 5 TBD 8 Pond 6 TBD 8 Planting Beds TBD 8

19SD-00334 South Campus Parking

Pond 1 TBD 8

Pond 2 TBD 8 Pond 3 TBD 8 Pond 4 TBD 8 Pond 5 TBD 8 Pond 6 TBD 8

John Cochran

Square Feet

Restoratio n Cost

# of Visits / Year

Per / Visit Cost

Stewardship / Year Cost

18MSD-00245 Sextro Lot Pond A 780 8 Pond B1 312 8 Pond B2 400 8 Pond B3 360 8 Pond B4 360 8 Pond C1 440 8 Pond C2 480 8

P-0029-883-00 Old Cab Lot Pond 1 2,08