This document is a Performance Work Statement (PWS) for a federal contract opportunity to clean the flow straighteners and honeycomb structures inside the Large Cavitation Channel facility in Memphis, TN. The key objectives are for the contractor to thoroughly clean the flow straighteners and honeycomb using water or cleaning solutions, and to remove all dirt, debris, and detritus from the facility. The contractor must have an established fall protection program and confined space safety program, and possess any required certifications for erecting scaffolding. The government will provide access to water and a fire hose connection, while the contractor must provide their own equipment and crew. The work must be completed by September 30, 2025. The related federal contract opportunity is a pre-solicitation sources sought notice, which is not a formal solicitation but rather market research to identify qualified contractors, including small businesses, to potentially perform this work under a future firm-fixed price contract.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
FLOW STRAIGHTENERS/HONEYCOMB CLEANOUT IN THE LARGE CAVITATION
CHANNEL MEMPHIS, TN
1.0 DESCRIPTION OF SERVICES/INTRODUCTION: Contractor will clean detritus and other dirt and debris from two (2) sections of 25’x25’ vertical sections of flow straighteners inside the Large
Cavitation Channel. These sections are next to each other separated by a 24” air gap and must be accessed from both sides for cleaning. One side (the upstream side) is filled with 4”x4” square tubes.
The other side (the downstream side) is divided into a grid of 5’x5’ squares with each grid square filled with approximately fifty thousand (50,000) 1/4” hexagonal tubes. There are approximately one million of these small tubes on the downstream side. All detritus, dirt, and debris cleaned from the honeycomb must be removed from the facility by the contractor. Any cleaning solutions used must be non-toxic and otherwise safe for draining into the municipal sewer system. See reference document “Flow and
Honeycomb Diagram” and “Honeycomb and Flow Straighteners Photos.”
Contractor will be working in a confined space. All appropriate safety measures including having the space certified as safe everyday must be taken and will be the responsibility of the contractor.
2.0 BACKGROUND: The Flow Straighteners and honeycomb smooth out the flow of 1.4 million gallons of water in the channel as it circulates at speeds up to 35 knots. They straighten and flatten turbulent water to ensure laminar flow during model testing. They also act as a large filter for debris that may be present in the water. They are cleaned every few years. In the past, contractors have needed scaffolding to access the higher portions of the Flow Straighteners/honeycomb. The space requires fall protection and appropriate PPE.
3.0 OBJECTIVE:
3.1 The contractor shall thoroughly clean the Flow Straighteners/honeycomb using water or other cleaning solutions or a combination of both.
3.2 The contractor shall accomplish this using their own tools, equipment, and crew. The LCC will provide high pressure water with a fire hose connection.
3.3 The contractor shall remove all dirt, debris, and detritus cleaned from the Flow
Straighteners/honeycomb and dispose of it at their expense. Any dirt that is captured in runoff water and non-toxic cleaning solutions can be drained into the municipal sewer system.
4.0 SPECIAL QUALIFICATIONS:
4.1 The contractor shall have an established fall protection program and a confined space awareness and safety program. If erecting scaffolding, the contractor will possess the appropriate certifications and licenses to do so.
5.0 APPLICABLE DOCUMENTS
5.1 Flow and Honeycomb Diagram (.docx)
5.2 Honeycomb and Flow Straighteners Photos (.docx)
6.0 PERIOD OF PERFORMANCE
6.1 Contractor shall complete all work before September 30, 2025
7.0 GOVERNMENT FURNISHED EQUIPMENT/PROPERTY/INFORMATION
7.1 The government shall provide access to water and a fire hose type connection. The contractor shall provide their own fire hose and connectors if applicable.
8.0 DELIVERABLES
8.1 NOT APPLICABLE
9.0 SECURITY REQUIREMENTS:
All contractor personnel must be approved for DoD installation access by the physical security officer.
Contractor personnel must obtain the required identification badges and follow security and safety regulations while aboard any Government installation. Contractor personnel shall comply with all local base/installation security procedures required to gain access to US Government facilities. All contractor equipment, personnel and vehicles are subject to inspection and search by US government security officials
(or designated representatives) upon entry to any government owned and/or operated installations and facilities. The Government reserves the right to visit and inspect, the Contractor’s assets used in support of this requirement.
The Government shall provide the necessary paperwork identified below which shall be completed by all contractor personnel requiring base access.
Document
Type
No./Version Title
PED
Request
CARDEROCKDIV
Form 5239/9 (07-10)
Authorization Request for Operation of Non-DoD Portable
Electronic Devices (PEDs) at Naval Surface Warefare Center -
Carderock Division (NSWCCD)
Visit
Request
SECNAV 5512/1
(MAY 2021)
DEPARTMENT OF THE NAVY LOCAL POPULATION ID
CARD/BASE ACCESS PASS REGISTRATION
To initiate the site access process (for both personnel and vehicles), the Contractor will contact their
NSWCCD Memphis POC. The NSWCCD Memphis POC will provide further instructions/information
(procedures, forms, etc.).
The Government shall provide a minimum of two (2) personnel for security, escort, and support at all times. If necessary, the Government can supply additional personnel, however if more than four (4) personnel are required the contractor shall provide the Government at least 48 hours’ notice.
The standard workweek is Monday through Friday from 0730 to 1600. If the contractor requires work on a day or time not included on the schedule, the Government will make every attempt to accommodate the contractor request, but cannot guarantee that the request will be accommodated.
Contractor personnel must confine themselves to the work sites specified in their contract. Visiting other areas is prohibited. Identification issued by the Visitor Center must be displayed at all times. Access to
NSWCCD Memphis buildings will not be allowed without proper identification.
Pursuant to federal regulations, all personnel and vehicles on NSWCCD Memphis property are subject to search by authorized personnel at any time. No Contractor personnel shall be allowed to operate a privately owned vehicle on station other than for ingress and egress. All private vehicles shall be parked in the designated areas. Posted speed limits and traffic restrictions must be observed at all times.
Alcoholic beverages, weapons, cameras, sound recorders, proscribed drugs and explosives are prohibited on NSWCCD Memphis property. The bearing and use of lighted cigarettes, e-cigarettes, cigars, pipes, or any tobacco product is not permitted except in designated areas.
Use of Government property without prior written approval of the Contracting Officer is prohibited.
Accidents or problems of a security/safety nature must be reported to the NSWCCD Memphis Personnel and Safety Offices immediately.