Attachment_A_Proposal_Summary_Slide_Template.pptx

PPTX presentation 128 KB Posted

Attached to
Sources for Ultraviolet Nuclear Spectroscopy of Thorium (SUNSPOT)
Opportunity number
HR001125S0008
Issued by

About this file

This is a PowerPoint template attachment for summarizing proposals under the DARPA SUNSPOT program (HR001125S0008). The template consists of three slides requiring proposers to detail their technical approach, performance metrics, and resource justification. Specifically, proposers must outline their concept's strengths and weaknesses, provide calculated values for two key performance metrics (output power >1mW and linewidth <30 Hz), and reference the proposal sections containing supporting evidence and rationale.

The template also requires a breakdown of requested resources, including labor FTEs for both prime and subcontractors, equipment and materials costs, and other costs. The program focuses on developing coherent vacuum ultraviolet radiation sources for thorium nuclear isomeric transition spectroscopy, administered through DARPA's Research and Technology Development program (CFDA 12.910). While detailed technical calculations are expected, DARPA acknowledges the high-risk nature of proposed approaches and seeks order-of-magnitude estimates and proof-of-concept data to justify technical feasibility.

Attachment A - new template, PM customized

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HR001125S0008 SUNSPOT

Full Proposal Title Organization Name(s); Technical POC Name(s)

Concept Strengths of the proposed approach Weaknesses of the proposed approach Approach

Performance metrics of the proposed approach

MetricPhase 1
Output Power
(Program metric: > 1 mW)Calculated value

Proposal pages/section which provides rational and sufficient evidence

Linewidth
(Program metric: < 30 Hz)Calculated value

Proposal pages/section which provides rational and sufficient evidence

Instructions: The proposal should provide detailed technical rationale delineating why the proposed approach may achieve the program goals and metrics. For each metric, please provide the calculated value and the section of the proposal that provides justification. Please note, DARPA understands the approaches are most likely very high risk, and is simply looking for summaries of analyses, order-of-magnitude estimates, and/or proof-of-concept experimental data that can justify the proposed approach.

Justification of Requested Resources

CategoryProposedRational
Labor (Prime)Proposed number of FTEs

Include subcontractors and consultants Labor (Subcontractors) Proposed number of FTEs Include consultants

Equipment and Materials (Prime and Subcontractors)
Other Costs (Prime and Subcontractors)

Instructions: The proposal should provide rationale on why the proposed resources are required to achieve the proposed goals and metrics. This is focused on requested resources, not total cost.

image1.png image2.png

File details come from the government source that posted it. Updated .