Attachment A-Placemat for PDB with OTA Process Overview.pdf

PDF 298 KB Posted

Attached to
Reverse Industry Day – Capabilities and Experience with Alternate Design and Delivery Methodologies (ADDM) for USACE Europe District
Solicitation number
W912GB27Z1C74
Issued by

About this file

This document is an infographic outlining the end-to-end process for Progressive Design-Build (PDB) projects using Other Transactions (OT) authority under 10 U.S.C. § 2808a for Military Construction (MILCON) projects.

The process consists of three primary phases: Pre-Agreement (Planning, Solicitation, and Award), Agreement Phase 1 (Design and Preconstruction Services), and Agreement Phase 2 (Final Design and Construction). The pre-agreement phase includes eight steps: Project Requirements definition, Request for Qualifications (RFQ) issuance, Statement of Qualifications (SOQs) submission, down-selection of qualified firms, pitch presentations, qualifications-based selection (QBS), negotiation of Phase 1 OT services, and award of the Phase 1 OT Agreement. Agreement Phase 1 encompasses nine activities spanning from kickoff and alignment through decision gateway approval, utilizing MILCON design funds and operating under an open-book cost estimate model with an off-ramp decision point for government protection. Agreement Phase 2, utilizing MILCON construction funds, involves final design/construction documents development, long-lead item procurement, construction execution in work packages, and project closeout, with design and construction overlapping to optimize delivery. The methodology emphasizes early alignment between government and industry, open-book collaboration for cost transparency, iterative problem-solving, flexible execution, and multiple off-ramp protection points for the government at key milestones. Phase 1 transitions to firm-fixed pricing upon authorization of Phase 2 construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROGRESSIVE DESIGN-BUILD (PDB) WITH OT

End-to-End Process for MILCON Projects

Right Authority.

Right Collaboration.

Right Outcome.

OT STATUTORY

AUTHORITY:

10 U.S.C. § 2808a, Facility Construction or Repair:

Transactions Other Than Contracts and

Grants

AGREEMENT PHASE 1 – DESIGN & PRECONSTRUCTION SERVICES (OT Agreement using MILCON Design Funds)

EARLY ALIGNMENT

Aligns Government & Industry Goals Early

OPEN BOOK COLLABORATION

Transparency in estimating drives informed decisions

ITERATIVE & FLEXIBLE

Evolves Strategy & Solves Challenges Early

OFF RAMP PROTECTION

Exit points protect Government at key milestones

OVERLAPPED EXECUTION

Design and Construction Optimized

BETTER OUTCOMES

Deliver facilities with more cost and schedule confidence

AGREEMENT PHASE 2 – FINAL DESIGN & CONSTRUCTION (OT Agreement using MILCON Construction Funds)

KICKOFF & ALIGNMENT SCHEMATIC DESIGN BUDGET LOCK DESIGN DEVELOPMENT DECISION GATEWAY TO

PHASE 2

PRECONSTRUCTION

READINESS

Outcome: Government Authorizes Phase 2 Construction when Cost, Scope, Schedule and Risk are Acceptable

Risk Informed Project Alignment Meeting

• Goals & Objectives

• Risk Workshop

• Success Metrics

• Communication Plan

Concept Solutions

• Further Alternates

• Innovation Opportunities

• Risk Reduction

Schematic Design Development

• Develop Design

Concepts

• Evaluate Systems

• Confirm Approach

Budget Estimate Submission

• Level 3 Cost Estimate

• Cost Confidence Package

• Scope/Schedule Validation

Advance Design (Technical Development)

• Tailored Design

• Engineer Analysis

• Constructability Reviews

Integrated Schedule Development

• Long Lead Item

Identification

• Resource Planning

Execution-Ready Integrated Solution

• Coordinate Estimate

• Constructability

• Risk Mitigation

Government Decision

• Scope Confirmed

• Cost Validated

• Risk Accepted

• Negotiate Phase 2:

Construction

Pre-Construction Work

• BCOES

• Permitting

• Early Submittals

• Site Readiness

Open Book Estimate / Price Schedule Open Book Estimate / Price Schedule

Switch to Firm-Fixed Price

1. Project Requirements

• Mission Need

• Performance Objectives

• Industry Outreach /

Market Intelligence

• SCO OTA Approval

AUTHORIZE PHASE

2 CONSTRUCTION

FINAL DESIGN / CONSTRUCTION DOCUMENTS

(OVERLAPPING)

CONSTRUCTION (OVERLAPPING w/ DESIGN) REDZONE / BENEFICIAL OCCUPANCY TURNOVER /

CONSTRUCTION

COMPLETE

LONG LEAD / EARLY

WORK

• Early Site

Acquisition

• Site Access

• Site Preparation

• Early Package

• Execute Construction in Work Packages

• Foundations / Structure

• Building / Systems

• Interior / Exterior

• Site Utilities

• Continuous Quality & Safety Reviews

• Punchlist

• Red Zone Commissioning

• Joint Occupancy (if needed)

• Beneficial Occupancy

• Base Certification

• Turnover / Construction Complete

• Close Out

• Mission Complete!

• Complete Construction Documents

• Permitting & Submittals

• Ongoing Design Development

• Submittals & Coordination

• Continued BCOES Reviews

• Receive MILCON Construction Funding

• Issue Modification to Agreement

• Obligate Funding

• Decision Milestones

• Green Light Long Lead Item Procurement Construction Continues

2. Request for Qualifications

(RFQ)

3. Statement of Qualifications

(SOQs)

• Industry Submits SOQs •Government Evaluation

4. Down-Select •Government

Selects Best Qualified Offers

• Invite Firms to Pitch Presentations

5. Pitch Presentations

6. Qualifications Based Selection

(QBS)

• Government Selects

Best Qualified Offeror

7. Negotiate OT (Phase 1) Services

• Scope of Ph 1 Design/ Preconstruction Services

• Performance Metrics

8. Award OT (Phase 1)

Agreement •Award Other

Transaction Agreement

GOVERNANCE

& OVERSIGHT

• Tailored Oversight

• Periodic Reporting

•Cost, Schedule, Performance Reviews

• Risk Management

Why PDB with

OT?

PRE-AGREEMENT: PLANNING, SOLICITATION, & AWARD

OFF RAMP

DECISION POINT

OFF RAMP

DECISION POINT

• Finalize Requirements Package

• Industry Day / Notice

• Publish Solicitation

• Offeror Presentations / Meetings / Interviews

• Q&A

• Site Visit, if applicable

Slide 1