Attachment A - Performance Work Statment_QWASP.pdf

PDF 500 KB Posted

Attached to
Janitorial Service & Solid Waste Removal w/ Grounds Policing, Winding Stair Recreation Site Oklahoma Ranger District, Ouachita National Forest
Solicitation number
12444224R0012
Issued by

About this file

This document is a Performance Work Statement for a federal contract to provide janitorial service, solid waste removal, and grounds policing at the Winding Stair Recreation Site on the Oklahoma Ranger District of the Ouachita National Forest.

The contractor shall furnish all personnel, equipment, supplies, and transportation necessary to perform these services from the date of award through May 31, 2025, with three one-year option periods. The contract is set aside for small businesses under NAICS code 561720. Quotes are due by June 17, 2024. The government will award an Indefinite Delivery Indefinite Quantity contract. Key contractor responsibilities include maintaining clean and sanitary restrooms, removing solid waste, and policing the grounds to keep them free of litter and debris. The government will conduct 100% inspections and random sampling to ensure the contractor meets the performance standards outlined in the Performance Requirements Summary.

View the file

Other files

File Type Posted
Attachment E - Vicinity Map.pdf PDF
Attachment C - Performance Relevancy.pdf PDF
Attachment F - Wage Determination.pdf PDF
Sol_12444224R0012.pdf PDF
Attachment B - Evaluation Factors.docx DOCX document
Attachment D - Schedule of Items.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Janitorial Service and Solid Waste Removal with Grounds Policing

Winding Stair Recreation Site Oklahoma Ranger District

Part 1

General Information

1. GENERAL: This is a non-personal services contract to provide janitorial service and solid waste removal with grounds policing at the following recreation sites on the Mena/Oden Ranger Districts:

Recreation Site Nearest City County Winding Stair Heavener, Oklahoma LeFlore County

The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform janitorial service and solid waste removal with grounds policing at facilities as defined in this Performance Work Statement. The contractor shall perform to the standards in this contract.

1.2 Scope: The Contractor shall provide janitorial services and waste removal with grounds policing services, as per the specifications, drawings, exhibits, and schedules at the Winding Stair Recreation Site, Oklahoma Ranger District, within the Ouachita National Forest. Note:

Transportation of solid waste shall be transported in a state approved vehicle that prevents litter or garbage from scattering in transit. Solid waste must only be disposed of in as state approved site.

1.3 Period of Performance: The period for this contract will be from date of award through May 31, 2025. Note: This solicitation contains an option clause to extend the awarded contract for up to three (3) additional year period. The three -year option period is as follows:

Option Year 1: May 30, 2025, through May 31, 2026 Option Year 2: June 01, 2026, through May 31, 2027 Option Year 3: June 01, 2027, through May 31, 2028

1.4 General Information

1.4.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this Performance Work Statement

(PWS). The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. The contractor will be required to submit a Quality Control Plan in writing within 30 days after contract award. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system prior to implementation.

1.4.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.4.3 Recognized Holidays: Contractor will perform janitorial work according to schedule guidelines including Holidays.

1.4.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 7:00 a.m. to 4:00 pm, according to scheduled provided, including Federal holidays, unless directed otherwise due to facility closure by local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.4.5 Place of Performance: The work to be performed under this contract will be performed at the Winding Stair Recreation Site.

1.4.6 Type of Contract: The government will award an Indefinite Delivery Indefinite Quantity (IDIQ) Contract to provide all management, labor, transportation, supplies, materials and equipment to perform janitorial services and solid waste removal services with grounds policing at the Winding Stair Recreation Site, as specified in this contract.

1.4.7 Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use.

1.4.8 Key Control (If applicable). The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan.

Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.4.9. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.4.10. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.4.11 Lock Combinations (If applicable). The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.4.12 Special Qualifications: Contractor is responsible for ensuring that vehicle being used for solid waste removal meets Oklahoma State Law requirements for transporting solid waste. Solid waste must be disposed of in a State approved sanitary landfill or incinerator.

1.4.13 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer (CO), Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.4.14 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies;

coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.4.15 Key Personnel: The following personnel are considered key personnel by the government:

Mason Kelley, Recreation Technician – Contracting Officer Representative (COR), Oklahoma Ranger District. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer.

The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 7:30 a.m. to 4:00 p.m., Monday thru Friday except when the government facility is closed for administrative reasons. Qualifications for all key personnel are listed below:

1.4.16 Appearance of Contractor Employees: Contractor personnel shall present a neat appearance and be easily recognized by the public. This may be accomplished by wearing clothing bearing the name of the company or by wearing an appropriate badge containing the company name and employee name. Additionally, employees shall always remain fully dressed while performing work activities.

1.4.17 Invoicing Instructions: Invoice once per month, within 14 days after the end of each month through IPP. In addition, submit a copy via email to Mason Kelley at mason.kelley@usda.gov mailto:mason.kelley@usda.gov

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CAMPING EQUIPMENT. Privately owned items found on a campsite such as tents, camping trailers, vehicles, motorcycles, bicycles, boats, lawn chairs, coolers, firewood, extensions cords, toys, fishing gear, etc.

2.1.2. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.3. CONTRACTING OFFICER (CO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.4. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S.

Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.5. DEBRIS. Stumps, rocks, street sweepings, grass clippings and trimmings, tree trimmings and sticks longer than 18 inches or 1 inch or greater in diameter. It shall also include dead animals and animal waste (regardless of size).

2.1.6. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.7. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

2.1.8. INCINERATOR. A furnace or a container for incinerating waste material, burn to ash.

2.1.9. JANITORIAL SERVICE. A service in which one performs tasks to keep the premises and offices, or buildings, clean and make minor repairs.

2.1.10. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.11. GARBAGE/TRASH. Food waste, unwanted or useless material, something in a crumbled or broken condition, debris from pruning or processing plant material. Paper, plastic and rubber by-products.

2.1.12. GENERAL USE AREA. An area which is commonly used by the public as a whole within a defined set of lines or boundary.

2.1.13. GROUNDS POLICING. To make clean or put in order an area used for a particular purpose, the recreation area.

2.1.14. INVOICE PROCESSING PLATFORM (IPP). Accounting system utilized by the U.S.

Department of Agriculture, U.S. Forest Service where contractors submit invoices for payment processing.

2.1.15. INTEGRATED ACQUISITION SYSTEM (IAS). Acquisition system utilized by the U.S.

Department of Agriculture, U.S. Forest Service in budget planning and implementation.

2.1.16. MOWING. Mowing is defined as the cutting of grass, weeds, vines, or other vegetation, to a specific height, with reel and rotary lawn mowers or gang mowers.

2.1.17. MOWING CYCLE. A mowing cycle is defined as the performance of all mowing and trimming within all of the specified recreation area.

2.1.18. OCCUPIED CAMPSITE. A campsite having camping equipment placed upon it.

2.1.19. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.20. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.21. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.22. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.23. QUALITY CONTROL PLAN. An organized written document prepared by the contractor specifying how he intends to achieve quality control.

2.1.24. SANITARY LANDFILL. A system of trash and garbage disposal in which waste is buried between layers of earth for health purposes

2.1.25. SOLID WASTE. Refuse from places of human and animal habitation as in garbage, rubbish, and excrement.

2.1.26. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.27. SWEET SMELLING TOILET. Pit/Vault toilet facility, often referred to as an “SST”, non-waterborne restroom facility.

2.1.28. WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.29. WORK WEEK. Monday through Friday, unless specified otherwise.

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: Not Applicable

3.2 Facilities: Not Applicable

3.3 Utilities: Not Applicable

3.4 Equipment: Not Applicable

3.5 Materials: Not Applicable

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all labor, supervision, transportation, equipment, toilet paper, trash bags and cleaning supplies and materials required to perform work under this contract. Toilet paper will be a minimum of soft, two-ply toilet paper and size to fit toilet paper dispensers. All trash bags and liners must have a thickness of 3.0 mil or greater.

4.2. Materials: The Contractor shall furnish all materials, supplies, and equipment necessary to meet the requirements under this PWS.

4.3. Equipment: The Contractor shall furnish all equipment used to perform work under this specification, all must be in good operating and mechanical condition and shall comply with safety requirements and equipment owner manual instructions.

4.3.1. All contract employees must wear proper personal protection equipment (PPE) while performing work tasks.

PART 5

SPECIFIC TASKS

5. SPECIFIC TASKS:

5.1. Basic Services. The contractor shall provide janitorial services and solid waste removal services with grounds policing at the following recreation sites:

JANITORIAL SERVICE AND GROUNDS POLICING

Schedule for Janitorial Service, all facilities listed shall be maintained:

Recreation Site Facility Schedule for Janitorial Services Winding Stair 3 – SST’s/Vault Toilets with one riser in each toilet

January-March, Every Wednesday April-May, Monday and Friday Each Week June-August, Every Wednesday September-October, Monday and Friday Each Week November-December, Every Wednesday

Janitorial services shall be performed between the hours of 7:00 a.m. to 4:00 p.m. only.

Dates of Service will be date of award to May 31, 2025, on the days designated above.

5.2. Task Heading; Janitorial Service – Janitorial service at the designated facilities shall be conducted in the least disruptive manner to forest visitors. Postpone cleaning actions if necessary when units are in use. Notify COR or Inspector of any malfunction or vandalism found.

5.2.1. Open doors and close facility with signs during cleaning operations. Facilities shall be cleaned between the hours of 7:00 a.m. and 4:00 p.m.

5.2.2. Windows shall be cleaned, outside of riser (toilet) shall be scrubbed clean and sanitized, the inside of the riser shall be cleaned to the bottom of the riser. Riser seat will be cleaned and sanitized. Remove all fecal matter and stains. Clean all associated exposed surfaces with the appropriate cleaning agent or disinfectant. Wipe down and dry all exposed surfaces. Deodorizer shall be applied after each cleaning. DO NOT DISPOSE ANY CLEANING ITEMS IN

VAULT.

5.2.3. Wash, wipe down and dry, all walls, doors, ceilings and handrails with appropriate cleaning agent and disinfectant. DO NOT DISPOSE ANY CLEANING ITEMS IN VAULT.

5.2.4. All chrome surfaces shall be cleaned and free from stains and smears.

5.2.5. Clean all trash cans with the appropriate cleaning agent and disinfectant. Remove trash liner and replace, wipe down all exposed surfaces.

5.2.6. Sweep and mop floors. Clean with appropriate cleaning agent or disinfectant. Remove excess water with squeegee or other effective method. POWERWASHING OF FACILITY IS

NOT AUTHORIZED.

5.2.7. Toilet paper dispensers shall be cleaned and inspected daily for function; refill as needed.

5.2.8. Toilet paper will be replaced with clean and dry toilet paper.

5.2. 9. Remove spider webs, insect carcasses, insect nests, wasp nests and dirt dauber nests from interior and exterior of the facility.

5.2.10. Sweep and clean concrete walkways to, from, and around buildings. Remove trash and bugs as necessary.

SOLID WASTE REMOVAL and GROUNDS POLICING

Recreation Site Facility Schedule for Janitorial Services

Winding Stair 2 – Two Bin Trash Units January-March, Every Wednesday April-May, Monday and Friday Each Week June-August, Every Wednesday September-October, Monday and Friday Each Week November-December, Every Wednesday

Solid waste removal and ground policing shall be performed between the hours of 7:00 a.m. to 4:00 p.m. only. Dates of Service will be from date of award to May 31, 2025, on the days designated above.

5.3. Task Heading; Solid Waste Removal and Grounds Policing – Solid waste removal and grounds policing at the Winding Stair Recreation Site, shall be conducted in the least disruptive manner to forest visitors.

5.3.1. Grounds Policing: Prior to removal of solid waste, police the grounds by walking all general use areas and picking up trash, bottles, cans, glass, and obvious litter within the general use area of the recreation site.

5.3.2. Police picnic units and keep them free of litter including bottle caps and cigarette butts (Do not perform litter pick up in units that are occupied).

5.3.3 Large debris items, such as discarded tires, and dead animals are to be reported to the COR to make arrangements for removal.

5.3.4. Solid Waste Removal: Perform solid waste removal of all bins and cans, determine if bin is mostly full.

5.3.5. Open back door of trash bin and tilt liner holder out to remove trash liner.

5.3.6. Remove all loose waste from inside interior of trash bin, and around outside of bin.

5.3.7. Replace removed trash liners with new ones. (Never leave a bin or can empty with no trash liner)

5.3.8. Pick up all waste which spills during removal process.

5.3.9. Clean and wipe down all trash bins, inside and out, with disinfectant cleaner.

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS) Not applicable.

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7 Attachment/Technical Exhibit List:

g. Attachment 1/Technical Exhibit 1 – Performance Requirements Summary

TECHNICAL EXHIBIT 1

Performance Requirements Summary

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

Standard Performance Threshold

Method of Surveillance

5.2 Janitorial Services

All surfaces shall be clean and free of loose dirt, stains, and smears. Trash shall be emptied, and toilet paper refilled. Inside and outside of buildings shall be free of spider webs, insect nests, and debris. Sidewalks shall be free of dirt and debris.

Zero defects

100 Percent Inspection

5.3.1 Grounds Policing

Grounds are free of litter, garbage, and trash.

No more than one customer complaint per report.

Random Sampling and Validated Customer Complaint received by

COR

5.3.2 Solid Waste Removal

All trash bins emptied with new liners installed.

Area around bins are free of garbage and trash.

Complaint received by

US Department of Agriculture (USDA)

Quality Assurance Surveillance Plan

Contents Project Name Solicitation / Contract Number Section 1: Introduction

1.1 Purpose

1.2 QASP Relation to the Contract

1.2.1 QASP Revisions

1.2.2 Surveillance of Performance Progression

1.3 QASP Relation to the Quality Control Plan (QCP)

Section 2: Performance Description

2.1 Performance Standards and Acceptable Quality Levels (AQLs)

2.1.1 Allowable Deviation

2.1.2 Substantially Complete

2.2 Non-Performance

2.2.1 Documentation

2.2.2 Remedial Actions

Section 3: Contractor and Government Responsibilities

3.1 Contractor Responsibility

3.2 Government Responsibility

3.2.1 Contracting Officer (CO)

3.2.2 Contracting Officer Representative (COR)

3.2.3 Customers

Section 4: Surveillance Methods to Perform Quality Assurance

4.1 Surveillance Methods

4.2 Analysis and Results

Appendix A: Example Performance Requirement Summaries Appendix B: Example Discrepancy Report Appendix C: Customer Feedback Record Appendix D: Example Guide / Inspection List Appendix E: Example Quality Assurance Monitoring Appendix F: Example Customer Complaint Investigation Appendix G: Example Surveillance Activity Checklist

Project Name Oklahoma Ranger District, Janitorial, Trash Removal and Grounds Maintenance, Sweet Smelling Toilets (SST) Winding Stair Recreation Site

Solicitation / Contract Number Solicitation Number:

Section 1: Introduction This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled provide janitorial, trash removal and grounds maintenance services on the Oklahoma Ranger District. This plan sets forth the procedures and guidelines that the USDA, Ouachita National Forest, Oklahoma Ranger District will use in ensuring the required performance standards or services levels are achieved by the contractor.

1.1 Purpose

The purpose of the QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards identified in the PWS. This QASP is designed to define roles and responsibilities, identify the performance objectives, define the methodologies used to monitor and evaluate the contractor’s performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results.

1.2 QASP Relation to the Contract

1.2.1 QASP Revisions

The Contracting Officer Representative (COR) may make revisions or changes to the QASP procedures and surveillance methods or increase or decrease the degree of surveillance methods at any time during the contract performance period. Changes to the Metric must be incorporated into the PWS, Performance Requirement Summary (PRS) and QASP by a bilateral modification to contract that is issued by the Contracting Officer (CO). A copy of the QASP is provided to the contractor to enable the contractor to enhance its Quality Control (QC) program to perform in accordance with its Quality Control Plan (QCP).

1.2.2 Surveillance of Performance Progression

As the performance period progresses, the levels of surveillance may be altered for service areas where performance is either consistently excellent or unsatisfactory. If consistently good performance, then the amount of surveillance may be reduced. If observations reveal consistent deficiencies, increased surveillance may be implemented.

1.3 QASP Relation to the Quality Control Plan (QCP)

The QCP is a required element of contract and the Contractor shall adhere to its established quality control processes and procedures in managing and performing work as described in the contract. While the QCP represents the way in which the Contractor will ensure its quality and timeliness of services, as defined in the PWS, the QASP represents the way in which the Government personnel specified in Section 3: Contractor and Government Responsibilities, Paragraph 3.2, Government Responsibilities will evaluate the contractor’s performance. The contractor’s QC program and the residual organization’s QASP should be complementary programs that ensure successful contractor performance.

Section 2: Performance Description Performance of the contractor will be monitored through the surveillance methods described in Section 4: Surveillance Methods to Perform Quality Assurance to assess the Contractor’s performance against PWS requirements.

2.1 Performance Standards and Acceptable Quality Levels (AQLs) For selected activities in the PWS, the PRS provides a performance standard and an AQL. A performance standard is the expected level of contractor performance. An AQL defines the level of performance that is satisfactory. Depending on the service evaluated and the evaluation method selected, performance standards and AQLs may be stated as a number of occurrences or as a percentage. Performance standards and AQLs for random sampling and 100 percent inspection are generally stated as percentages. For periodic inspections, performance standards may be stated as either percentages or as absolute numbers.

The contract requires the Contractor to perform all work as specified. Any inaccuracies or omissions in services or products are referred to as “defects” on the part of the Contractor. The Contractor shall be responsible for all identified defects and may be required to perform the work at no cost to the government. The AQLs take into account that in some instances an allowable level of deficiencies (deviations) is possible while overall performance continues to meet the government’s desired level of service.

2.1.1 Allowable Deviation

The AQLs define the level or number of performance deficiencies the Contractor is permitted to reach under this contract. AQLs take into account the difference between an occasional defect and a gross number of defects. AQLs can be expressed as a percentage of or as an absolute number (e.g., three per month). There may be instances where 100 percent compliance is required, and no deviation is acceptable (e.g., where safety is involved).

2.1.2 Substantially Complete

In some cases, service outputs are evaluated using subjective values (e.g., excellent, satisfactory, unsatisfactory). The criteria for acceptable performance and for defects must be defined for these service outputs. The concept of “substantially complete” should be the basis for inspections based on subjective scales. Work is considered “substantially complete” where there has been no significant departure from the terms of the contract and no omission of essential work. In addition, the Contractor has performed the work required to the best of its ability and the only variance consists of minor omissions or deficiencies.

2.2 Non-Performance

Non-performance occurs when the contractor’s performance does not meet the AQL for a given requirement.

Requirements may contain multiple performance elements, and therefore, deficiencies may occur in one or more aspects of performance (e.g., timeliness, accuracy, completeness, etc.) or subject areas of effort.

When surveillance indicates that the contractor's service output is not in compliance with the contract requirements, the Contracting Officer’s Representative (COR) must determine whether the Contractor or the Government caused the deficiency. If the cause of the defect rests with the Government, corrective action must be taken through Government channels. If the cause of the defect is due to action or inaction by the contractor, the contractor is responsible for correction of the problem at no additional expense to the Government.

2.2.1 Documentation

Documentation of work non-performed or unacceptable work is essential for tracking Contractor performance. The COR will document deficient work by compiling facts describing the inspection methods and results and to substantiate nonconformance with the contract. A sample documentation reporting form is provided in Appendix B: Discrepancy Report and Appendix D: Inspection Report. The documentation, with any recommendations, will be forwarded to the CO. In the case of the Contractor, the COR will decide whether to elevate the problem to the CO for corrective action.

2.2.2 Remedial Actions

The Federal Acquisition Regulation allows for penalties in the event that the Contractor fails to perform the required services. Penalties are defined as those actions taken under the direction of the CO against the contractor within the general provisions of the contract for nonconformance to the PWS and PRS.

Section 3: Contractor and Government Responsibilities

3.1 Contractor Responsibility

The Contractor is responsible for delivering products or services in accordance with the contract. Implementing its QCP, which describes the Contractor’s methods for ensuring all products and services under the contract meet established performance standards and AQLs. Maintaining, and providing for audit, quality control records and reports and all records associated with the investigation and complaint resolutions. Appointing a single quality control point-of-contact to act as a central recipient of communication from the COR or CO.

3.2 Government Responsibility

3.2.1 Contracting Officer (CO)

The CO is responsible for administering and monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by COR and the contractor’s performance. The CO may delegate various day-to-day contract administration duties to a Administering ACO (ACO) and/or the COR for performance management and administrative actions such as invoice approval and issuance of Contract Discrepancy Reports may be, and normally are, delegated by the CO to the COR. The CO shall approve any revisions to the QASP processes or standards.

3.2.2 Contracting Officer Representative (COR)

The COR, is designated in writing, by the CO. The COR will ensure that the QA function is properly executed, plays a key role in contract administration and performs the contract surveillance and monitoring. Some key contract administration duties include, but are not limited to, performs surveillance as required by this QASP; make recommendations to the CO for issuance of Contract Discrepancy Reports or letters of commendation and acceptance or rejection of completed work and for administrative actions based on unsatisfactory or non-performed work, and revisions or changes to the QASP;

and assists the CO in identifying necessary contract modifications and preparing reports of Contractor performance and cost.

The COR may use the form(s) included in the Appendices to perform the inspection or other forms as approved by the CO. The Contractor overall guidance is also provided by FAR clause [Insert Inspection & Acceptance Clause Number] in Section [Insert Number] of the contract.

3.2.3 Customers

Customers or organizations/offices that the Contractor provided support may be requested to assist the COR in conducting QA to provide information relating to the Contractor’s performance through Customer Feedback.

Information gained from the Customer Feedback may be used in conjunction with other methods of observation to rate the performance of the Contractor.

Section 4: Surveillance Methods to Perform Quality Assurance

4.1 Surveillance Methods

The surveillance methods used in the QA process are the Government’s tools to monitor the Contractor’s products and services. The best means of determining whether the Contractor has met all contract requirements is to inspect the Contractor’s service products and analyze the results. Further, documented inspection results are an effective tool in contract administration that can confirm the successful achievement of all performance requirements or highlight areas where defects exist and improvements are necessary.

Due to the small size of the campground area and limited number of facilities located in the campground, there will be 100% surveillance of the contract services. All SST’s and Trash Containers will be inspected randomly during the month while contract services are being performed at the campground. Inspection will be performed by a District Forest Service employee, familiar with the contract specifications and requirements, on the recreation site facilities listed, as part of the scope of work, to ensure compliance with contract requirements.

Cleanliness of the recreation facilities will be evaluated based on the contract requirements.

On the day selected, an on-site inspection and evaluation will be performed no earlier than 10:00 am and no later 4:00 pm on scheduled service days at each site chosen for the inspection of services.

4.1.1 Random Sampling

On the day selected by random selection, the campground facilities and grounds will be 100 percent inspected ensure conditions meet the requirements of the contract specifications.

4.2 Analysis and Results

When the inspections and Customer Feedback validations have been completed, the COR will perform an analysis of the Contractor’s performance. The purpose of the analysis is to ensure Government is receiving high-quality products and services from the Contractor. The COR will review the results, rate the Contractor’s compliance with the performance standards and AQLs, and characterize the Contractor’s overall performance. Analysis of all types of contract monitoring will result in one of the following outcomes:

4.2.1 Outstanding Performance

Outstanding performance is the result of the Contractor substantially exceeding the performance standards with significant achievements and no significant deficiencies. The Government may reduce its level of surveillance when the COR determines that the Contractor provides sustained performance that significantly exceeds the requirements with no significant deficiencies.

toilet paper refilled. Inside and outside of buildings shall be free of spider webs, insect

Complaint received by

[THIS PAGE IS FOR INFORMATIONAL PURPOSES]

The Contacting Officer must include as attachments or exhibits the appropriate performance requirement summary, forms, checklists, etc. in the QASP that will be used during surveillance / monitoring for the applicable contract.

Appendix A: Performance Requirement Summary

Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

toilet paper refilled. Inside and outside of buildings shall be free of spider webs, insect

Complaint received by

Appendix B: Discrepancy Report

DISCREPANCY REPORT 1. DISCREPENCY REPORT NO.

2. TO: (Contractor / Project Manager Name) 3. FROM: (Name of COR)

CONTRACT NUMBER: DATE:

PREPARED ORAL NOTIFICATION RETURNED BY CONTRACTOR ACTION COMPLETE

4. DISCREPENCY OR PROBLEM (Describe in Detail. Include PWS references. Attach Continuation Sheet if Necessary)

5. SIGNATURE OF COR

6. TO: (Name of COR) 7. FROM: (Contractor / Project Manager)

8. CONTRACTOR RESPONSE AS TO CAUSE, EFFECT, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE (Attach Continuation Sheet if necessary. Cite applicable Contractor QC program procedures or new QC procedures)

9. SIGNATURE OF CONTRACTOR REPRESENTIVE 10. DATE

11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, or rejection. Attach Coordination Sheet if necessary)

12. GOVERNMENT ACTIONS (Cure notice, show cause, other)

CLOSE OUT

KTR NOTIFIED

NAME AND TITLE SIGNATURE DATE

Appendix C: Customer Feedback Record

CUSTOMER FEEDBACK RECORD

DATE AND TIME OF COMPLAINT CONTRACT NUMBER/ OR PROJECT:

SOURCE OF COMPLAINT

ORGANIZATION

INDIVIDUAL

NATURE OF COMPLAINT

PWS REFERENCE

VALIDATION

DATE AND TIME CONTRACTOR INFORMED OF COMPLAINT NAME OF CONTRACTOR REPRESENTATIVE INFORMED OF COMPLAINT

ACTION TAKEN BY CONTRACTOR (Responsible officer):

RECEIVED AND VALIDATED BY

Determination: Complaint Valid Complaint Invalid

Appendix D: Inspection List

CONTRACT NUMBER: ___________________________________

SERVICE FUNCTION:

PWS SECTION:

1 Method of Surveillance:

2 Lot Size:

3 Sample Size:

4 Performance Requirement: Performance is Excellent (E) when ___________or fewer defects are discovered per month. Performance is Satisfactory (S) when ________ or fewer defects are discovered per month. Performance is Unsatisfactory (U) when _______ or more defects are discovered per month.

5 Sampling Procedure: Instructions on how to select the sample must be clear and complete

6 Inspection Procedure: The procedure must be detailed enough to allow a yes/no objective decision as to the acceptability of performance by anyone making the inspection. Explain when evaluation is to occur and what is acceptable/unacceptable

Performance: Excellent (E), Satisfactory (S), Unsatisfactory (U), Not Applicable (N/A)

PRS Requirements Timeliness Quality of Work Notes

Overall Rating Of Inspection (E, S, U or N/A)

COR/Inspector Comments:

Contractor Signature: ___ Date: __

COR Signature: ____________________Date: _________________

Appendix E: Quality Assurance Monitoring

CONTRACT NUMBER: ______________________________________

SERVICE or STANDARD:

SURVEY PERIOD:

SURVEILLANCE METHOD (Check the applicable item):

Random Sampling 100% Inspection Periodic Inspection Customer Complaint

LEVEL OF SURVEILLANCE (Check the applicable item):

Monthly Quarterly As needed

PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %

ANALYSIS OF RESULTS:

Observed Service Provider Performance Measurement Rate: ______%

Service Provider’s Performance (Check the applicable item):

Meets Standards

Does Not Meet Standards

Narrative of Performance During Survey Period:

Prepared By: _______________________________ Date: ______________

Appendix F: Example Customer Complaint Investigation The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.

CONTRACT NUMBER: _________________________

SERVICE or STANDARD:

SURVEY PERIOD: ___________________

DATE COMPLAINT RECEIVED: ____________

SOURCE OF COMPLAINT: _________________________________________ (Name) _______________________________________________________________ (Organization) ___________________ (Phone No.) _________________________________ (Email Address)

NATURE OF COMPLAINT:

RESULTS OF COMPLAINT INVESTIGATION:

DATE SERVICE PROVIDER INFORMED OF COMPLAINT: _____________

CORRECTIVE ACTION TAKEN BY SERVICE PROVIDER:

Received and Validated By: __________________________________________ Prepared By: _____________________________ Date: _________________

Appendix G: Example Surveillance Activity Checklist The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.

Performance Requirement

Performance Standard

Method of Measurement

Performance Metrics

Method of Surveillance

Date Accomplished

Compliance (Exceed, Met, Partial Met)

Attachment A - Performance Work Statment
Attachment A - Performance Work Statment
TECHNICAL EXHIBIT 1
QASP Winding Stair Campground - SST
Project Name
Solicitation / Contract Number
Section 1: Introduction
1.1 Purpose
1.2 QASP Relation to the Contract
1.2.1 QASP Revisions
1.2.2 Surveillance of Performance Progression
1.3 QASP Relation to the Quality Control Plan (QCP)
Section 2: Performance Description
2
2.1 Performance Standards and Acceptable Quality Levels (AQLs)
2.1.1 Allowable Deviation
2.1.2 Substantially Complete
2.2 Non-Performance
2.2.1 Documentation
Documentation of work non-performed or unacceptable work is essential for tracking Contractor performance. The
COR will document deficient work by compiling facts describing the inspection methods and results and to substantiate
nonconformance with the contract. A sample documentation reporting form is provided in Appendix B: Discrepancy
Report and Appendix D: Inspection Report. The documentation, with any recommendations, will be forwarded to the
CO. In the case of the Contractor, the COR will decide whether to elevate the problem to the CO for corrective action.
2.2.2 Remedial Actions
Section 3: Contractor and Government Responsibilities
3
3.1 Contractor Responsibility
3.2 Government Responsibility
3.2.1 Contracting Officer (CO)
3.2.2 Contracting Officer Representative (COR)
3.2.3 Customers
Section 4: Surveillance Methods to Perform Quality Assurance
4
4.1 Surveillance Methods
4.2 Analysis and Results
Appendix A: Performance Requirement Summary
Appendix B: Discrepancy Report
Appendix C: Customer Feedback Record
Appendix D: Inspection List
Appendix E: Quality Assurance Monitoring
Appendix F: Example Customer Complaint Investigation
Appendix G: Example Surveillance Activity Checklist

File details come from the government source that posted it. Updated .