Attachment A - List of Panels Workstations Preaction and Dry pipe.pdf
PDF 152 KB Posted
- Solicitation number
- 75N99025R00003
About this file
This document is an equipment inventory list for fire system and suppression devices across multiple buildings, detailing 18 fire alarm network nodes and several fire suppression systems. The equipment is predominantly manufactured by Johnson Controls/SimplexGrinnell, with models including 4100es, 4100u, and TSW, located in various rooms and buildings such as security offices, loading docks, mechanical rooms, and data centers.
The inventory categorizes equipment into five service categories: Peripheral Initiating Devices, Peripheral Notification Devices, Panel Components, Batteries, and Preventive Maintenance/Testing, with most items covered under Task #1. Additional fire suppression systems include Sapphire Suppression System (Ansul Autopulse), Pre-Action Suppression Systems from manufacturers like Grinnell, Reliable, and Viking, and Dry Pipe Systems from Tyco, covering locations in Buildings 101, 102, 104, 105, 106, 110, and Hood Suppression systems in Building 101 Cafeteria. The document uses checkmarks to indicate which items are covered under the service contract and uses "NA" to denote not applicable items.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Peripherial Initiating Devices Troubleshooting and Parts
COVERED UNDER TASK
#1 (smoke heads, heat detectors, flow switches, tamper switches, pull stations, IAMs, etc.)
Peripherial Notification Devices
Troubleshooting and Parts
COVERED UNDER
TASK #1
(horn, strobes, speakers, etc.)
Panel Components Troubleshooting and Parts
COVERED UNDER TASK
#1
(Power supplies, circuit boards, relays, modules, etc.)
Batteries
COVERED
UNDER
TASK #1
Preventive Maintenance, Testing and Inspections
COVERED UNDER
TASK #1
Fire Suppression Systems
COVERED UNDER
TASK #2
(suppresion piping, suppression heads, suppression valves, compressors)
Equipment ID Manufacturer Model Location (
Node 1 Johnson Controls/ SimplexGrinnell 4100es A & B Mod, Security Office
B114 NA
Node 2 Johnson Controls/ SimplexGrinnell 4100es C Mod, 1st Floor Elevator 3&4
Lobby
NA
Node 3 Johnson Controls/ SimplexGrinnell 4100es D Mod, 1st Floor Elevator
5&6 Lobby NA
Node 4 Johnson Controls/ SimplexGrinnell 4100es E Loading Dock Room E101 NA
Node 5 Johnson Controls/ SimplexGrinnell 4100es F Penthouse Electrical Room NA
Node 6 Johnson Controls/ SimplexGrinnell 4100es Building 102, Loading Dock
Mechanical Room S116Z NA
Node 7 Johnson Controls/ SimplexGrinnell 4100es Building 104, Loading Dock
Mechanical Room W108X NA
Node 8 Johnson Controls/ SimplexGrinnell 4100es Building 105, Room P124 NA
Node 9 Johnson Controls/ SimplexGrinnell 4100es Building 106, Room I102 NA
Node 10 Johnson Controls/ SimplexGrinnell 4100es Building 107, 10711 NA
Node 11 Johnson Controls/ SimplexGrinnell 4100es Building 108, Room 103 NA
Node 12 Johnson Controls/ SimplexGrinnell 4100es VCC Building 105,Security Office
P106B NA
Node 13 Johnson Controls/ SimplexGrinnell 4100u VCC B Mod, Security Office B114 NA
Node 14 Future Use Future Use Future Use NA
Node 15 Johnson Controls/ SimplexGrinnell TSW B Mod, Security Office B114 NA
Node 16 Johnson Controls/ SimplexGrinnell 4100u Building 109, Lobby NA
Node 17 Johnson Controls/ SimplexGrinnell 4100es Building 110, Print/Copy
Room NA
Node 18 Johnson Controls/ SimplexGrinnell TSW Building 105, Security Office
P106B NA
Sapphire Suppression System
Ansul Autopulse IQ-301 Bldg 104 Data Center
Pre-Action Suppression System
Grinnell 2" Grinnell F-517/TFP DV-5
Double Interlock Bldg 104 Mechanical Room NA NA NA
Pre-Action Suppression System
Reliable 2" Reliable DDX Double
Interlock Bldg 101/MRI/Mechanical Rm NA
Pre-Action Suppression System
Viking 2.5” Viking MOD. F-1 Deluge Valve Double Interlock Bldg 101/MRI/Mechanical Rm NA
Pre-Action Suppression System
Reliable 2" Reliable DDX Double
Interlock Bldg 110/Life Cycle Room NA NA
Dry Pipe System Tyco 2.5” Tyco DPV-1 Single Interlock Bldg 101/A Dock NA NA
Dry Pipe System Tyco 2.5” Tyco DPV-1 Single Interlock Bldg 101/C Dock NA NA
- Indicates these items are covered under the service contract.
- Indicates not covered under service contract.
NA- Not Applicable
Dry Pipe System Tyco 3” Tyco DPV-1 Single Interlock Bldg 101/E Dock NA NA Dry Pipe System Tyco 3” Tyco DPV-1 Single Interlock Bldg 102/103 Dock NA NA
Dry Pipe System Tyco 2.5” Tyco DPV-1 Single Interlock Bldg 105 Dock NA NA
Hood Suppression Ansul Bldg 101 Cafeteria NA NA Hood Suppression Ansul Bldg 101 Cafeteria NA NA
Sheet1
File details come from the government source that posted it. Updated .