ATTACHMENT A_Example Job Safety Risk Assessment.docx

DOCX document 30 KB Posted

Attached to
J059--AITC Electrical Maintenance Services (VA-20-00049479)
Solicitation number
36C10X20Q0132
Issued by

About this file

This document contains details for a federal contract solicitation for electrical maintenance services. The contractor will provide program management, general electrical system maintenance including repairs and material inventory management, and be available for emergency repair services on a 24/7 basis. Services involve maintaining electrical systems in computer rooms, office spaces, generators, UPS equipment, electrical panels and other systems for the Department of Veterans Affairs facility located in Texas. It is critical these systems remain operational as any downtime could cost millions of dollars per day and significantly impact services for Veterans. The contractor must have licensed electricians experienced in mission critical systems who can respond as needed for emergency repairs outside of normal business hours.

View the file

Other files

File Type Posted
36C10X20Q0132 0001.docx DOCX document
36C10X20Q0132 0001_1.pdf PDF
ATTACHMENT C_PAST PEFORMANCE REFERENCES.pdf PDF
36C10X20Q0132_2.docx DOCX document
ATTACHMENT B _Wage Determination.pdf PDF
ATTACHMENT D_PAST PERFORMANCE QUESTIONAIRRE.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RISK ASSESSMENT WORKSHEET

1.TASK DESCRIPTION

Computer Room 134 Power Upgrade, Phase 3 Whip Removal

2. DATE (DD/MM/YYYY)

06/13/2020

Five
steps
of
Risk
Management:
(1)

(4) Identify the Implement hazards controls (2) (5) Assess the hazards Supervise and evaluate

(3)
Develop controls &

(Step numbers not make decisions equal to numbered items on form)

4. SUBTASK/SUBSTEP OF MISSION/TASK

5. HAZARD

6. INITIAL RISK LEVEL

7. CONTROL

8. HOW TO IMPLEMENT/ WHO WILL IMPLEMENT

9. RESIDUAL RISK LEVEL

Risk Management
Failure to communicate/implement control measures

L AITC onsite staff will verify implementation and effectiveness of control measures and modify as necessary How: Pre-Job safety brief.

Who: AITC PM

L

Pre- Mishap/Accident Planning
Inadequate response to mishap/injured personnel

L

Ensure multiple forms of communication are available. Primary, contingency emergency procedures are put in place.
How: Pre-Job safety brief and continuous spot checks.

Who: AITC PM

L

General Maintenance Operations
Operational Hazards

L

Ensure personnel are using proper lifting techniques, lifting equipment and PPE
How: Oversight while work is taking place.

Who: AITC PM

L

Risk Management
COVID-19 Concerns
L
Ensure Six foot stand off rule is briefed and adhered to.
How: Pre-Job safety brief

Who: AITC PM

L

Additional entries for items 5 through 9 are provided on page 2.

10. OVERALL RESIDUAL RISK LEVEL (All controls implemented):
EXTREMELY HIGHHIGHMEDIUMLOW

image1.jpeg

File details come from the government source that posted it. Updated .