SOW-PWS Template 05 March 2021 version Page 1
Statement of Work (SOW)
Disassembly, Inspect, Analyze and Test, Decontamination, and Packaging of Components for LM2500 Single Shank Turbine (SST) Gas Generator Assemblies (GGA)
1.0 INTRODUCTION
1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of
Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the United States Navy’s (USN) ships, submarines, military watercraft and unmanned vehicles. This requirement is for NSWCPD Code 424, which is responsible for gas turbines which are used for propulsion and power generation.
1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S.
Government whether actual, inherent, or implied
1.0.3 Government/Contractor Relationship
1.0.3.1 The services to be delivered under this Contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the
Contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.
1.0.3.2 The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.
1.0.3.3 Contractor personnel under this Contract shall not engage in any of the inherently
Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.
1.0.4 Employee Relationship:
1.0.4.1 The services to be performed under this Contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the
Contractor's personnel will act and exercise personal judgment and discretion on behalf of the
Contractor.
1.0.4.2 Rules, regulations, directives, and requirements that are issued by the USN and
NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation.
This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.
SOW-PWS Template 05 March 2021 version Page 2
1.0.4.3 Inapplicability of Employee Benefits: This Contract does not create an employer-employee relationship. Accordingly, entitlements and benefits applicable to such relationships do not apply.
1.0.4.4 It is the Contractor's, as well as the Government's, responsibility to monitor Contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.
1.0.4.4.1 The Contractor shall notify the Contracting Officer in writing via letter or email within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the Contractor's estimated date when, absent a response, cost, schedule or performance will be impacted.
1.0.4.4.2 The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:
(i) Confirm the conduct is in violation and when necessary direct the mode of further performance,
(ii) Countermand any communication regarded as a violation,
(iii) Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or
(iv) In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor.
1.1 BACKGROUND
This statement of work is for the teardown, inspection, cleaning, evaluation and packaging of
USN radiologically controlled (RADCON) gas turbine assets. Due to operation in radiologically contaminated areas, specialized depot overhaul induction procedures are necessary to process potentially radiological contaminated LM2500 Marine Gas Turbine (MGT) Single Shank
Turbine (SST) Gas Generator assembly (GGA). Processing and handling of these assets requires additional licenses and special handling instructions as well as segregation of material and supporting equipment and a segregated teardown and inspection facility capable of processing potentially contaminated parts. Parts verified clear of contamination following inspections are then reintroduced into an authorized depot overhaul location. Parts verified contaminated shall continue to be handled in accordance with the contractor’s radiological controls procedures.
1.2 SCOPE OF WORK
The contractor shall provide engineering and technical services necessary to receive incoming
RADCON LM2500 SST GGAs in sealed shipping containers, open, inspect and disassemble the engine, survey and document the condition of all LM2500 SST GGA MGT components
SOW-PWS Template 05 March 2021 version Page 3 indicating their level of radiological contamination. Additionally, the contractor shall disposition parts according to their level of radiological contamination as either above or below the permissible limits as defined in the American National Standard Institute Standard (ANSI)
13.12 and Nuclear Regulatory Commission (NRC) Regulatory Guide 1.86 (less than 1000 dpm / 100 cm2 loose / removable contaminants and less than 6000 dpm / 100 cm2 total).
Parts that are identified above the acceptable limits should be cleaned per acceptable facility cleaning procedures with levels being recorded and tracked at every step.
The contractor shall possess, or guarantee possession within 60 days of contract award, all required state licenses or NRC licenses with their respective state to handle and clean radiologically contaminated hardware of the type identified in this contract. The contractor shall have ninety (90) days from contract award to induct the subject RADCON gas turbine asset. The contractor shall furnish a copy of their NRC/State license to the USN prior to beginning deliveries of USN RADCON assets. The contractor shall notify the USN if any changes that are made to the license and shall furnish a copy of the updated license prior to delivery of any USN
RADCON asset.
The contractor must have or be able to procure/construct or be in position of the requisite area, special tooling, and infrastructure necessary to receive, fully disassembly, survey, and package the LM2500 SST GGA and all sub-assemblies and components resultant from disassembly. All facilities and support equipment shall be located within the continental United States. All handling of radiologically contaminated hardware shall take place at the contractor’s facility, in a separate and controlled environment (subsequently referred to as the control area) in order to prevent the potential transfer of radiological contaminants to other areas.
The contractor shall receive RADCON LM2500 SST GGAs in sealed shipping containers from the USN. All material within the container shall be considered under radiological controls. Any
RADCON engine(s) shall be stored in a separate area from any other engines in accordance with the contractor’s RADCON program. Opening of the containers and all subsequent work shall be performed within the control area.
The contractor shall be responsible for disposal of any radiologically contaminated byproducts resultant from executing this Statement of Work. The contractor shall collect all contaminated
USN parts, after cleaning attempts have failed, and store in a container suitable for shipment in accordance with applicable state regulations.
The contractor shall perform the incoming inspection, engine disassembly, survey, cleaning, evaluation and packaging of all LM2500 SST GGAs in accordance with the requirements section of this Statement of Work.
2.0 APPLICABLE DOCUMENTS
2.1 Chapters 4.4 through Chapters 6.26 and Chapter 7.0 of Technical Manual S9234-AB-
MMD-020
SOW-PWS Template 05 March 2021 version Page 4
2.2 General Gas Turbine Bulletin (GGTB) Nr. 23, Revision 4; Procedures for Marine Gas
Turbine Replacement Authorization and Shipment, dated 19 June 2011
Government will provide these docs during solicitation. Documents shall be provided to contractors that are confirmed as bona fide US Department of Defense (DOD) contractors familiar with the procedures to handle technical data package materials that may include limited distribution information.
2.3 ANSI 13.12 - Surface and Volume Radioactivity Standards for Clearance
2.4 NRC Regulator Guide 1.86 – Termination of Operating Licenses for Nuclear Reactors
Contractor can find this info at https://www.nrc.gov/docs/ML0037/ML003740243.pdf
The Contractor shall reference and utilize the latest version available when performing tasks within this SOW.
3.0. REQUIREMENTS
The contractor shall have ninety (90) days from contract award to acquire all tooling and/or equipment required to perform the tasks set forth in this Statement of Work (SOW). All tooling shall be considered under radiological controls once introduced into the control area. At a minimum the following special tools and/or equipment are required to disassemble the LM2500
SST GGA.
A list of special tools and/or equipment required to disassemble the LM2500 Gas Generator
Assembly can be found in chapter 2 of the Industrial Repair Manual for General Electric LM2500
Series Gas Generators and Gas Turbines GEK 99418 for Marine and Industrial Gas Turbines.
These tools are referenced below in table 1.
Tooling Nomenclature P/N
CRF ST AND EARS 1C5615-ST AND 1C5711 1C5615
TMF ST AND EARS 1C5617 W/ST AND 1C5711 1C5617
TMF ST AND EARS 1C5617 W/ST AND 1C5712 1C5711
CRF ST AND EARS 1C5615-ST AND 1C5711 1C5711
STAND EARS 1C6854-STAND 1C5711 1C5711
DSY TABLETOP HOLDER 1C5867
IGB TOOL SET 1C5868
FIXTURE 1C5874
SLING RMV 2ND ST G NOZ ASY 1C5964
CASE HANDLING SLING 1C5976
AFT GG LIFT FXTR PULLER 1C5992
PULLER-RMV 2ND STG SHRDS 1C6771
FRONT GG LIFT FXTR 1C6803
JACKSCREW SET 1C6804
SOW-PWS Template 05 March 2021 version Page 5
TGB STAND 1C6841
TOOLSET TGB HORZ 1C6842
TMF LIFT FIXTURE 1C6847G02
VERTICAL MAINT. STAND AND PILOT 1C6853
STAND EARS 1C6854-STAND 1C5711 1C6854
LIFT FXTR TGB HORZ 1C6855
LIFT FXTR TGB HORZ 1C6872
SLING RMV TGB 1C6874
FIXTURE & TORQUE TUBES (WRENCHES) 1C6897
CASE TABLE FIXTURES-RMV 1C6902
HYDRAULIC REMOVAL OF PINS 1C6942G07
COUPLING NUT TOOLING SET 1C6950
RMV#5 NUT & OIL TUBE UNTORQUE 1C6952
WRENCH SPANNER-OIL TUBE HPT ROTOR 1C6952
OIL TUBE PULLER 1C6953
TOOL-HUB TIE INSTALLATION 1C8134
#3 NUT RTNR RMVTOOL 2C6001
#3 NUT RTNR RMVTOOL 2C6001
#3 INR RACE PULLER 2C6003
#3 INR RACE PULLER 2C6003
PULLER-REAR ROTATING AIR/OIL SL 2C6009
REAR LIFTING EYE 2C6023G02
REAR LIFTING EYE 2C6023G02
TRANSPORT TRUCK 2C6024
TRANSPORT TRUCK 2C6024
DSY FXTR 2C6029
AIRDUCT WRENCH 2C6030
SPOOLS LIFT FXTR 2C6031
FXTR SUPPORT-STGS 1-2 HPC DISKS 2C6037
TOOL SET 2C6042-RMV OUTER #4 BB RACE 2C6042
PULLER-FWD AIR & OIL SEALS 2C6044
PULLER-#4 RB PULLER 2C6045
PULLER-BB RACES, RB RACES, FWD OIL SL 2C6047
SPNR WR-RMV #4 NUT 2C6047
PULLER-SPLIT NUT COLLAR, REAR AIR/SL 2C6048
PULLER ADPTER-ROTATING AIR SEALS 2C6049
TOOL SET-UNTORQUE SPLIT NUT 2C6050
VERTICAL HPT STAND 2C6061
WRENCH SPANNER-PRESSURE TUBE HPT 2C6092
#3 BRG PULLER 2C6139
LIFT EYE AFT 2C6141
GUIDE 2C6187
VANE HOLDEING FIXTURES SET 2C6171
SOW-PWS Template 05 March 2021 version Page 6
WRENCH -NUT SEAL 2C6173
#6 BRG PULLER 2C6183
CRADLE FOR ANTI TORQUE WRENCH TUBE 2C6187
WRENCH-PRESSURE TUBE HPT 2C6189
PULLER FWD & AFT ROTATING SEALS 2C6190
WRENCH, NUT-HPT ROTOR 2C6192
FXTR, LIFT-HPT ROTOR SHAFT & DISK 2C6195
LIFT EYE-HPT FWD 2C6197
LINER DSY TOOLING FOR WELD SHOP 2C6201G03
COMB/LNR PULLER 2C6203
SCREW RODS-RMV SPLIT NUT 2C6206
TRUCK, TRANSPORT 2C6264
REMOVAL HYD RAM 2C6299
REMOVAL HYD RAM 2C6299
#4 BB INST L/RMV TOOL 2C6356G02
HOLDING FXTR-HPC 2C6549
DAMPER SL V PULLER 2C6563
FXTR INST L/RMV-C/R FWD SPLINE ADPTR 2C6588
TOOL, TWISTING-C/R BLD RTNRS STG 2 2C6598
TOOL, TWISTING-C/R BLD RTNR STG 1 2C6601
TOOL UNBEND-C/R BLD RTNR STG 2 2C6604
TOOL SET, HOLDING-HPC ROTOR BOLTS 2C6620
PULLER-RMV AIR TUBES 2C6623
FXTR, LIFT-SLING & HOIST STG1&2 HPT 2C6678
TOOLS, RMV-HPC STG 2 BLD RTNR 2C6968
ARBOR PRESS PEMA 026819
HYDRAULIC SETUP FOR BLACK MULTIPLIER AH2043 AHX-T550 010
HYDRAULIC PUMP AH-P39
LARGE BLACK HYD WRENCH AHX1550
DOCK SIDE DOLLY E91993 PEMA 017258
4EA HEAVY CABLES E96648-4400-60 PEMA 018071
TORQUE MULTIPLIER 10-1 N/A
TORQUE MULTIPLIER 10-1 N/A
SUPPORT LADDER FOR VERTICAL ENGINE N/A
HYDRAULIC ENGINE STSAND FOR DSY N/A
LARGE WRENCH N/A
ACETYLENE TANK AND KIT/REGULATOR N/A
Table 1: List of Gas Generator Assembly (GGA) Tooling for Disassembly and Inspection
The following defines the minimum disassembly, inspection, cleaning and surveying effort of
USN LM2500 SST GGA MGTs. The contractor shall complete a full teardown, inspection and survey of all MGT components to the lowest depot-repairable/replaceable level as defined in
SOW-PWS Template 05 March 2021 version Page 7 applicable documents 2.1 through 2.3 of the Statement of Work. The entire gas generator must be disassembled. A report of all contractor progress, status and management milestones for each
SST GGA shall be provided IAW CDRL A001 on a monthly basis from time of contract award until the asset is returned to the USN. At a minimum the report must include the requirements of this section of the SOW.
3.1. RADCON Procedures:
3.1.1. Pre-disassembly Inspection
3.1.1.1 Visually inspect the contents of each LM2500 container and match all items to the
General Gas Turbine Bulletin 23 (GGTB23) checklist in accordance with paragraph 2.4 of the
Statement of Work. Report any missing items to the contract technical POC.
3.1.1.2 Conduct a radiological inspection of the interior of the engine shipping container and the engine exterior to quantify radiological contamination levels in accordance with paragraph 2.3 and 2.4 of the Statement of Work. Document the survey results for the shipping container and all engine exterior areas. Document the background readings of radiological contamination.
Contractor shall report findings in accordance with CDRL A002.
3.1.2 Disassembly Inspection
3.1.2.1 Completely disassembly the engine in accordance with the Statement of Work. Reference chapters 4.4 through chapters 6.26 of the technical manual S9234-AB-MMD-020 for disassembly instructions.
3.1.2.2 Verify all engine internal components are present. Report any missing items by part number and quantity to the USN.
NOTE: Parts criteria inspections and disposition condition evaluation will be conducted at the
Depot following the final release of parts from RADCON, parts criteria inspections and disposition condition evaluation is not part of this SOW.
3.1.2.3 Conduct a radiological inspection of all engine components from paragraph 3.1.2.1 in accordance with paragraph 2.3 and 2.4 of the Statement of Work. At a minimum LM2500
SST GGA sub-components to be analyzed are; Compressor Airfoils, Compressor
Casings, Compressor Rotor, Combustor components, SST Stage 1 and Stage 2 Nozzles, SST Stage 1 and Stage 2 Blades, and Fuel Nozzles.
Sub-Components Assembly
Nomenclature P/N
Sub-Components Assembly
Nomenclature P/N
Combustion Chamber Linear
Assembly
9101M29G57
Single Shank Turbine (SST)
High Pressure Turbine (HPT)
Stage 1 Blades
L31424G04
9101M29G59 L31424G29
9101M29G60 L31424G30
9101M29G63 L31424G28
L31424G31
L31033G01
L31033G07 L25645G03
SOW-PWS Template 05 March 2021 version Page 8
Single Shank Turbine (SST)
High Pressure Turbine (HPT)
Stage 1 Nozzles
L31033G02
Single Shank Turbine (SST)
High Pressure Turbine
(HPT)Stage 2 Blades
L25645G14
L31033G08 L25645G06
L25645G05
Single Shank Turbine (SST) High Pressure Turbine (HPT)
Stage 2 Nozzles
L25690G03 L25645G15
L25690G05
L31395G13
Fuel Nozzles
9016M58P06
L25690G04 9016M58P27
L25690G06
L38373G06
L31395G14
L38373G05
L38373G06
Table 2: List of Gas Generator Assembly (GGA) Major Sub-Components for RADCON
Inspection
3.1.2.4 Document the measured level of radiological contamination for each part in paragraph
3.1.2.2 of the Statement of Work. Identify by part number and serial number where applicable. Document radiological background readings. Minor piece parts and components of the same part number can be combined into lots for ease of reporting.
Contractor shall report findings in accordance with CDRL A003.
3.1.3 Disassembly RADCON
3.1.3.1 Compare the results from 3.1.2.2 to levels identified in paragraphs 2.3 and 2.4 of the
Statement of Work (less than 1000 dpm / 100 cm2 loose / removable contaminants and less than 6000 dpm / 100 cm2 total).
3.1.3.2 All items that exceed these limits shall be considered "radiologically contaminated" and subject to RADCON procedures (decontamination).
3.1.3.3 For all remaining items “below the limits”, verify that all uncontaminated parts have been; (1) radiologically surveyed, (2) survey data has been recorded, (3) that the measured contamination levels for every part fall below the requirements contained in this Statement of Work. Minor piece parts and components of the same part number can be combined into lots for ease of reporting. These parts can be identified as clear of radiological contamination and shall be collected and packaged in accordance with MIL-
STD-2073 for return to the USN.
3.1.3.4 Perform RADCON decontamination procedures as applicable to NRC/State license and approved by the USN. Clean the contaminated parts in accordance with Chapter 7.0 in technical manual S9234-AB-MMD-020.
3.1.4 2nd RADCON Readings
3.1.4.1 Parts that had been considered “radiologically contaminated” in paragraph 3.1.3.1 of the
Statement of Work and received RADCON decontamination procedures in paragraph
SOW-PWS Template 05 March 2021 version Page 9
3.1.3.4 of the Statement of Work shall receive a second radiological inspection of all components in accordance with paragraph 2.3 and 2.4 of the Statement of Work.
3.1.4.2 Document the measured level of radiological contamination for each part in paragraph
3.1.4.1 of the Statement of Work. Identify by part number and serial number where applicable. Document and record all new readings and compare with previous radiological readings from paragraph 3.1.2.4 of the Statement of Work. Document radiological background readings. Minor piece parts and components of the same part number can be combined into lots for ease of reporting. Contractor shall report findings in accordance with CDRL A004.
3.1.4.3 All items that exceed these limits in paragraph 2.3 and 2.4 of the Statement of Work shall be considered "radiologically contaminated" packaged, labeled, and disposed of in accordance with the applicable conditions set forth in the contractor’s state license.
3.1.4.4 For all items re-inspected in paragraph 3.1.4.1 Statement of Work that fall “below the limits”, verify that all uncontaminated parts have been; (1) radiologically surveyed, (2) survey data has been recorded, (3) that the measured contamination levels for every part fall below the requirements contained in this Statement of Work. Minor piece parts and components of the same part number can be combined into lots for ease of reporting.
These parts can be identified as clear of radiological contamination and shall be collected and packaged in accordance with commercial practices for return to the USN.
3.1.4.5 The contractor shall collect all contaminated USN parts as identified in 3.1.4.3 of the
Statement of Work as “radiologically contaminated” package in a sealed/safe container suitable for shipment in accordance with applicable state regulations. All containers shall be marked appropriately for shipment in accordance with NRC licensing. Contractor is responsible for disposing the “radiologically contaminated” units in accordance with the contractor’s state license.
3.2 Release of parts from the control area
All parts identified in paragraphs 3.1.3.3, 3.1.4.4, and 3.1.4.5 of the Statement of Work shall be officially released in writing by the USN with shipping instruction.
3.2.1 No parts shall be removed from the control area without the written approval of the USN.
In addition, any removal of parts from the control area shall be performed in accordance with the applicable conditions set forth in the contractor’s agreement state license. Should a conflict arise between the agreement state license and the requirements outlined in this Statement of Work, the contractor shall notify the C/424 Technical Point of Contact (TPOC) in writing requesting guidance prior to release. The C/424 TPOC shall provide a written response to the contractor within thirty (30) days.
3.2.2 The Contractor shall package, seal & preserve all hardware in accordance with best commercial practices and in accordance with ANSI 13.12 & NRC Regulator Guide 1.86. It is the
Contractor’s responsibility to ensure that all applicable codes and standards are followed. The
SOW-PWS Template 05 March 2021 version Page 10
Contractor shall prepare a Packaging Plan for the LM2500 SST GGA parts. The Packaging Plan shall be delivered to and approved by the Government prior to delivery of the LM2500 SST
GGA parts. The packaging plan shall detail the precautions the Contractor plans to use to protect and preserve the GTGs against corrosion, deterioration and physical damage during shipment and handling. The Packaging Plan shall be prepared and submitted IAW CDRL A005 of this
RFP.
3.3 RADCON Disassembly and Inspection Report (RADCON DIR)
The RADCON Disassembly and Inspection Report (RADCON DIR) is the radiological conditional analysis of parts, assemblies or components to document the conditions of parts not meeting the contamination levels of paragraphs 2.3 and 2.4 of the Statement of Work. The analysis of incoming LM2500 SST GGA shall result in a RADCON DIR for all parts identified by part number and, where applicable, serial number.
The contractor shall compile a RADCON DIR in the contractor’s format. This report shall be submitted to Naval Surface Warfare Center, Philadelphia (NSWC-PL) within thirty (30) calendar days of completion of the disassembly, inspection and survey in accordance with CDRL A002, A003, and A004. This report at a minimum shall contain:
3.3.1 Incoming visual inspection identifying physical damage.
3.3.2 Illustration and digital photographs of damage found.
3.3.3 LM2500 SST GGA serial number and all subassembly part numbers and serial numbers where applicable.
3.3.4 All parts or components missing.
3.3.5 RADCON findings summary for each LM2500 SST GGA component.
3.3.6 Conditions found (based upon visual assessment)
3.3.7 All inspection data and damage reports.
3.3.8 Engineering comments.
3.3.9 Survey results of all parts organized in three lists: contaminated, non-contaminated, non-contaminated after cleaning. Lists shall include all applicable part numbers, quantities, and where applicable, serial numbers.
3.3.10 Equipment Reporting: The results shall include the survey equipment used on each part. All survey equipment with applicable calibration information. Included shall be information regarding the minimum detectable activity (MDA) for each instrument used for each radiation type.
4.0 DATA REQUIREMENTS
4.1 Contract Status Report (CDRL A001)
4.1.1 This report shall reflect both prime and Subcontractor data if applicable at the same level of detail.
SOW-PWS Template 05 March 2021 version Page 11
4.1.2 The CDRL shall be delivered electronically, unless otherwise stated, and while
Contractor's format is acceptable the Government's approval must be received in writing from the
COR within 5 business days before formal submission.
4.2 Pre-Disassembly Recordings Report (CDRL A002)
4.2.1 The CDRL shall be delivered electronically, unless otherwise stated, and while
Contractor’s format is acceptable, Government’s approval is required from the COR. This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.3 Disassembly Readings Report (CDRL A003)
4.3.1 The CDRL shall be delivered electronically, unless otherwise stated, and while
4.4 2nd Decontamination Readings Report (CDRL A004)
4.4.1 The CDRL shall be delivered electronically, unless otherwise stated, and while
4.5 Packaging Plan (CDRL A005)
4.5.1 The CDRL shall be delivered electronically, unless otherwise stated, and while
5.0 SECURITY REQUIREMENTS
5.1 OPERATIONS SECURITY (OPSEC)
5.1.1 The Contractor shall protect critical information associated with this contract to prevent unauthorized disclosure. The NSWC Philadelphia Division's (NSWCPD) Critical Information List
(CIL)/ CIIL (Critical Indicators and information list) will be provided on site, if warranted.
Performance under this contract requires the contractor to adhere to OPSEC requirements. The
Contractor may not impose OPSEC requirements on its subcontractors unless NSWCPD approves the OPSEC requirements. During the period of this contract, the Contractor may be exposed to, use, or produce, NSWCPD Critical Information (CI) and/or observables and indicators which may lead to discovery of CI. NSWCPD’s CI will not be distributed to unauthorized third parties, including foreign governments, or companies under Foreign Ownership, Control, or Influence
(FOCI).
5.1.2 CUI correspondence transmitted internally on the contractor's unclassified networks or information systems, and externally, shall be protected per NIST SP-800-171, Protecting
Controlled Unclassified Information (CUI) in Non-federal Systems and Organizations.
Assembled large components/systems being transported to and from testing areas, other production or government facilities (whether or not on public roadways) shall be in an enclosed van trailer or covered flatbed trailer. Component/System outside storage, staging, and test areas shall be shielded/obscured from public view wherever physically possible.
SOW-PWS Template 05 March 2021 version Page 12
5.1.3 NSWCPD’s CI shall not be publicized in corporate wide newsletters, trade magazines, displays, intranet pages or public facing websites. Media requests related to this project shall be directed to the PCO, and the COR who will forward the required to the NSWCPD Public Release
Authority for review.
5.1.4 Any attempt by unauthorized third parties to solicit, obtain, photograph, or record, or;
incidents of loss/compromise of government Classified or CI, Business Sensitive, Company
Proprietary information related to this or other program must be immediately reported to the contractor's Facility Security Officer and Cognizant Security Office and/or the Naval Criminal
Investigative Service, and the NSWC PD Security Division (Code 105). Questions concerning these requirements shall be directed to the PCO, and the COR who will forward the request to the NSWC PD Security Division (Code 105).
5.2 RECEIPT, STORAGE, AND GENERATION OF CONTROLLED UNCLASSIFIED
INFORMATION (CUI)
All Controlled Unclassified Information (CUI) associated with this contract must follow the minimum marking requirements of DoDI 5200.48, Section 3, paragraph 3.4.a, and include the acronym "CUI" in the banner and footer of the document. In accordance with DoDI 5200.48, CUI must be safeguarded to prevent Unauthorized Disclosure (UD). CUI export controlled technical information or other scientific, technical, and engineering information must be marked with an export control warning as directed in DoDI 5230.24, DoDD 5230.25, and Part 250 of
Title 32, CFR. Nonfederal information systems storing and processing CUI shall be protected per
NIST SP-800-171, or subsequent revisions. All transmissions to personal email accounts (AOL, Yahoo, Hotmail, Comcast, etc.) and posting on social media websites (Facebook, Instagram, Twitter, LinkedIn, etc.) are prohibited. Destroy CUI associated with this contract by any of the following approved methods: A cross-cut shredder; a certified commercial destruction vendor; a central destruction facility; incineration; chemical decomposition; pulverizing, disintegration; or methods approved for classified destruction.
6.0 PLACE OF PERFORMANCE
6.1 Contractor shall perform at the contractor’s facility.
7.0 TRAVEL
Not applicable.
8.0 GOVERNMENT FURNISHED PROPERTY
8.1 The Government will provide the contaminated gas turbines to the contractor. Contractor shall disassemble, decontaminate, and ship back to the Government.
9.0 GOVERNMENT FURNISHED INFORMATION
SOW-PWS Template 05 March 2021 version Page 13
10.0 PURCHASES
11.0 COUNTERFEIT MATERIAL PREVENTION
12.0 PERSONNEL
13.0 NSWCPD ELECTRONIC COST REPORTING AND FINANCIAL TRACKING
(ECRAFT) SYSTEM
14.0 SPECIAL REQUIREMENTS
14.1 The Government shall identify ship to locations for decontaminated units at the task order level.