PWS - Page 1 of 9

U.S. DEPARTMENT OF ENERGY

WESTERN AREA POWER ADMINISTRATION

PERFORMANCE WORK STATEMENT (PWS)

Corona Infrared Scanning

January 2022

1. REQUIREMENT OVERVIEW

1.1. Scope

The Western Area Power Administration (WAPA), Sierra Nevada Region (SNR) requires a Contractor to scan several high voltage electrical transmission lines for Corona and arcing. The camera equipment used will record Ultra-Violet (UV) video images and Infra-Red (IR) images.

High definition still pictures of areas with corona are required. The data will be reviewed and analyzed. Reports will be generated showing all areas of concern and their order of severity so that maintenance can be prioritized. SNR has approximately 1,280 miles of transmissions lines and 6,953 structures. For detailed breakdown of all SNR transmission lines, see Attachment 1 -

WAPA_SNR_All_Lines_Structures.xls

1.2. Background

WAPA, part of the U.S. Department of Energy (DOE), is a Federal power marketing administration that markets and delivers reliable, cost-based hydroelectric power and related services. SNR serves customers in California and Nevada. SNR’s mission includes maintenance and operation of the high-voltage transmission system, including substations and high-voltage power transmission lines, ranging from 4.16kV to 500kV, which deliver power to its customers.

Most of the transmission lines are on steel towers and use both porcelain and polymer type insulators to attach the conductor to the tower. The transmission lines are three phase and have one conductor per phase except for the 500kV transmission lines which have multiple conductors per phase and use spacer dampers between towers to hold the multiple conductors in place.

Over the last 33 years, SNR has experienced one polymer insulator failure, several porcelain insulator failures caused by lightning strikes, and numerous spacer damper failures. Some of the transmission lines are over 50 years old and there is concern over the electrical and mechanical integrity of the insulators and spacer dampers. In recent years there has been a lot of attention given to the risks of faults in the transmission system initiating wildfires. As a result of this concern, SNR is increasing its use of corona, UV, and IR scanning of all its transmission lines. As part of this analysis SNR requires a corona discharge UV and IR evaluation performed on large portions of its transmission line facilities to determine whether there are any electrical and/or mechanical problem areas that need further evaluation and/or replacement.

1.3. Location

For general overview of SNR Transmission lines see Attachment 2 - SNR_Infrastructure_Overview.pdf and Attachment 3 - WAPA_SNR_All_lines_Structures.kmz

2. PERFORMANCE REQUIREMENTS

The Contractor shall provide qualified, trained, skilled personnel to complete the work. The camera operator shall be experienced in performing corona scans using a UV camera and arc scanning using an IR camera to perform surveys of high voltage (e.g. 4.16kV to 200kV) transmission line facilities from a helicopter. The Contractor and technicians must have proper training to ensure that the scans and reports are complete and accurate.

This will be an annual requirement with a base period (2022) and four option periods (2023 –

2026). The number of miles to be scanned may vary from year to year depending on site and equipment conditions. For 2022, approximately 2,380 structures will be inspected. For detailed breakdown of 2022 SNR transmission lines to be inspected, see Attachment 4 -

WAPA_SNR_Subset_2022_Lines_Structures.xls and Attachment 5 -

WAPA_SNR_2022_Subset_lines_Structures.kmz.

2.1. General Requirement

2.1.1. The Contractor shall provide all equipment, materials, supplies, tools, labor, management, supervision, and travel required to perform a complete Corona, UV and IR scan, analysis and generate the reports needed.

2.1.2. The Contractor will use state of the art camera equipment used to record Ultra-Violet (UV) video images and Infra-Red (IR) images. This includes the UV camera having a UV sensitivity of 3 x 10-18 Watt/cm2 or better and an IR camera with +/-3 degree C or +/- 3% accuracy or better with a sensitivity of <50mK @ 30 degrees C or better. The visible video number of pixels shall be 2 megapixels or better.

2.1.3. Images shall be recorded using a gyro-stabilized camera and in general collected from an angle that is 45 degrees or less from the horizontal.

2.1.4. The Contractor will have a state-of-the-art high definition still picture camera and use it for locations with UV or IR issues. This camera pixel count shall be 12 Megapixels or more.

2.1.5. The helicopter shall not come within the Minimum Helicopter Approach Distance (MHAD) of any structure.

2.1.6. The Contractor will design the layout of the photography mission, prepare the flight plans, and establish the quality control for the collection of true-color UV and IR aerial images utilizing airborne GPS. Prior to initiating the flight mission, the Contractor must submit a flight plan for approval by the government.

2.1.7. The contractor should be capable of scanning 1,300 miles of transmission lines and distribution lines, including substations, quickly and efficiently.

2.1.8. Prior to data delivery, the Contractor shall be required to sign a Conflict of Interest and Non-Disclosure Agreement (Attachment 5) and Data Sharing Agreement (Attachment 6).

At no time may the Contractor use the data for any other purpose than the project without the sole consent of WAPA. At the end of the project, the Contractor shall destroy all hardcopy and digital files showing WAPA infrastructure. At no time thereafter can the Contractor use maps, documents, or data generated by the project for presentation or any other purposes.

2.1.9. Day light still images of corona sources detected on the marker balls, spacers, and/or insulators. The pictures shall show the corona discharge indications overlaid on the daytime pictures so that SNR personnel can easily determine the specific location of the corona on the marker ball, insulator, or damper. The pictures showing insulator problems shall be labeled by structure number and insulator location at the structure (e.g. north south, east, west, top, middle, and bottom). The pictures showing spacer/ball problems shall be labeled with the reference tower (e.g. smallest numbered tower in that span) and the spacer/ball number (the first spacer/ball would be the closest to the reference tower).

2.2. Scan Reports

In addition to the requirements in section 2.1, the Contractor shall perform the following tasks:

2.2.1. The collected scan data will be reviewed and analyzed.

2.2.2. Reports will be generated showing all areas of concern and their order of severity so that maintenance can be prioritized.

2.2.3. Provide a report ranking each of the detected corona still picture images as high, medium, low or non-critical. Where:

2.2.3.1. High would indicate a high level of concern for the reliability of the equipment warranting an immediate need to investigate (e.g. within 120 days). May cause rapid deterioration of component. May be an indication of significant damage to component. Repair or replace as soon as possible.

2.2.3.2. Medium would indicate some concern with a follow-up within a year. May cause measurable deterioration of component over service life of component. May be an indication of measurable damage or deterioration of component. Schedule additional monitoring of component or schedule repair/replacement as convenient.

2.2.3.3. Low would indicate a possible problem, but of little concern. May reduce service life of component over long period of time. May be an indication of minor damage or deterioration of component. Monitor component for any additional signs of deterioration.

2.2.3.4. Non-critical – Will not cause deterioration of component within service life. May be a source of audible noise and/or radio interference.

2.2.4. The report shall be in Microsoft Word format, pictures with a minimum of 1600 x 1200 pixels of resolution on standard CDs and delivered within 10 days after the completion of the helicopter flight.

2.2.5. For each corona location, the report shall include an image of the corona and list the following:

2.2.5.1. Location of the corona

2.2.5.2. Structure number

2.2.5.3. Phase

2.2.5.4. Voltage

2.2.5.5. Component affected by corona

2.2.5.6. Condition or description of the corona detected

2.2.5.7. Possible causes of the corona

2.2.5.8. Criticality or ranking of the corona

2.2.5.9. Camera gain, if applicable

2.2.5.10. Comments regarding the corona found

2.2.5.11. Frame ID of the image shown on the page

2.3. Deliverables / Submittals

2.3.1. All deliverables and submittals shall be provided via electronic means to the Contracting Officer’s Representative (COR) for review and approval. The Government requires ten (10) business days for review of each deliverable/submittal.

2.3.2. Safety Plan. The Contractor must submit a Safety Plan to the COR no later than ten (10) calendar days after contract award. Approval of the plan is required prior to commencement of work. The safety plan must meet California OSHA and industry standards.

2.3.3. Spill Plan. A spill plan shall be submitted if there is going to be onsite refueling.

2.3.4. List of Employees. The Contractor must furnish names of all personnel performing work on this contract to the COR no later than ten (10) calendar days after contract award. No unidentified or unauthorized personnel will be allowed or permitted on the work site.

2.3.5. Performance Schedule. Contractor shall submit a proposed work schedule to the COR no later than ten (10) calendar days after contract award. Changes in the proposed schedule must be coordinated and approved by the COR. WAPA approval of the schedule is required prior to the commencement of work.

2.3.6. Progress Reports. Contractor shall submit a weekly progress report listing the completed scanned areas. This report is due before noon on the following Monday.

2.3.7. Final Report. A draft report shall be created and delivered within 10 business days after the completion of the inspection. A follow up meeting to present the results will be scheduled within five (5) working days. The final report will be presented within five (5) working days of the meeting.

2.3.8. All data shall be delivered no later than June 30, 2022. All successive years shall also have all data delivered no later than June 30.

2.4. Government Furnished Property (GFP)

2.4.1. The Government will furnish one helicopter, pilot and personnel to safely fly and guide

Contractor over WAPA transmission lines. It is the Contractor’s responsibility to determine and provide all other needed equipment and personnel to complete the task.

3. WAPA REQUIREMENTS

3.1. Pre-Performance Meeting

The Contracting Officer (CO) may hold a Pre-Performance Meeting with the Contractor to discuss contract requirements prior to the start of work. The meeting may be held in person or by teleconference, at the discretion of the CO.

3.2. Contractor Personnel

3.2.1. The Contractor shall have a competent onsite representative authorized to act on behalf of the Contractor, available to the CO or COR to receive instructions or information regarding work under the contract. The on-site representative must be able to fluently speak, write and understand English.

3.2.2. The Contractor shall furnish adequate supervision at the premises to ensure that work is performed in a satisfactory manner. It is the responsibility of the Contractor to maintain surveillance over personnel employed to perform work on the contract.

3.2.3. The Contractor and corresponding personnel must have a minimum of five (5) years’ experience performing a wide variety of high voltage system scans.

3.3. Contract Work Hours

3.3.1. SNR normal business hours are 7:00 a.m. to 3:00 p.m., Tuesday through Friday, excluding Federal holidays. Contractor work may be authorized outside normal business hours on a case-by-case basis with prior approval from the COR.

3.4. Contractor Equipment, Materials, Supplies, and Storage

3.4.1. The Contractor must provide off-site storage space for all equipment, materials, supplies, etc. The COR may, in unusual circumstances, approve use for a temporary storage/laydown area. The Government is not liable for loss or damage to Contractor property.

3.5. Environmental Requirements

3.5.1. Contractor shall submit proposed landing zone locations to Environment at least 30 days prior to work activity. Landing zones and staging/laydown areas cannot impact sensitive environmental resources. WAPA Environmental will survey and approve or reject all landing zones and staging/laydown areas prior to use.

3.5.2. If on site fueling is proposed a spill plan will be submitted and approved by Environment.

Equipment must be fueled at least 300 feet from any sensitive resource, including waters and wetlands.

3.5.3. Work will be stopped on days that the air quality index is 150 or above.

3.5.4. Under the Migratory Bird Treaty Act of 1918, migratory bird species and their nests and eggs are protected from injury or death. Impacts to migratory bird nests (including state listed Swainson’s hawk, other raptors, common raven, and American crow) shall be avoided during the nesting season (January 1 – September 15). The Contractor shall limit activity around any nests as much as possible.

The Contractor and Contractor crews or subcontractors shall complete pre-project environmental awareness training to ensure they are familiar with sensitive biological and/or cultural resources and associated protections.

3.6. Safety Requirements

3.6.1. The Contractor shall comply with the latest effective standards promulgated by the

Department of Labor, Occupational Safety and Health Administration, Safety and Health

Standards, 29 CFR 1910 and 29 CFR 1925, and shall comply with all applicable safety and health regulations and requirements, including all applicable consensus standards incorporated by reference.

3.6.2. The Contractor shall take all reasonable precautions to protect the safety and health of employees and members of the public and shall comply with all applicable safety and health regulations and requirements.

3.6.3. The Contractor shall maintain an accurate record of and shall immediately report to the

COR and the CO, all cases of death, occupational disease, traumatic injury to employees or the public, or property damage.

3.6.4. The Contractor shall report all near misses to the COR and CO within twenty-four (24) hours of the occurrence. These near-miss reports, identifying the nature of the hazard and the corrective actions which have been implemented to prevent a reoccurrence in the future, may be generic, with no mention of individual employees involved in the incident.

3.6.5. The Contractor shall ensure that its employees are provided with personal protective equipment (PPE) as necessary to comply with regulations and procedures. PPE includes, but is not limited to, occupational foot protection and eye and face protection as required by OSHA Standards, 29 CFR 1910 and Cal/OSHA.

3.6.6. The Contractor shall ensure that its employees have been appropriately instructed and trained in the proper use of any equipment, vehicles, and PPE needed for the performance of their duties. The Contractor shall ensure that its employees comply with all applicable Federal, State, and/or local safety rules and regulations.

3.6.7. The Contractor is required to establish a Safety Plan/Program that includes, in addition to other requirements, an onsite pre-work safety meeting.

3.7. Personnel Security Requirements

3.7.1. No Contractor or Subcontractor employee shall be allowed to work under this contract without prior approval being obtained from WAPA. This includes management personnel visiting sites.

3.7.2. Prior to being granted access to sensitive information such as technical system or architectural drawings, Contractor employees may be required to execute a Confidentiality and Nondisclosure Agreement with WAPA. Failure to execute this agreement shall be grounds for requesting removal from performance on this contract.

3.7.3. All information related to this contract is property of the Government and as such, must be safeguarded. This information may only be disclosed to Contractor personnel directly involved in the program management, administration, servicing or installation and shall not be released to anyone without the express written consent of WAPA or the originator of the information.

3.8. Aviation Security

3.8.1. Aviation: The aviation vendors shall be submitted to the COR for approval. To conduct aviation services under this contract, vendors shall be listed on the Department of Energy’s Commercial Aviation Services (CAS) Accepted Operators List. If the submitted aviation vendor is not listed on the CAS Accepted Operators List, WAPA’s Aviation Manager will audit the vendor. If approved, the vendor will be added to the CAS Accepted Operators

List. WAPA will require 40-calendar-days to review aviation vendors. Aviation vendors shall be approved by WAPA prior to aviation work commencement.

3.8.2. Helicopter Operations:

3.8.2.1. A Helicopter Operations Plan shall be provided to the COR and Aviation

Manager for approval prior to commencing work on-site. The IEEE Aviation Standards and UPAC (https://www.rotor.org/Safety) shall serve as a guide for completing the plan. Any questions regarding Helicopter Operations, or relating to

Standard 1.4.13, Helicopter Operations, shall be directed to the COR and Aviation Manager.

The following shall also be noted:

a. SELECTION OF HELICOPTER LANDING ZONES: Potential landing zones have not been prescreened or preapproved for use. The Contractor is responsible for identifying/obtaining potential landing zones and staging/laydown areas from the landowners and providing their location to the COR and Realty Specialist for approval for use. Landing zones and staging/laydown areas cannot impact sensitive environmental resources. WAPA Environmental will survey and approve or reject all landing zones and staging/laydown areas prior to use.

b. COMMAND AUTHORITY AND RESPONSIBILITY: During flight operations the Pilot-in-Command (PIC) is responsible for the successful operation of the flight. The PIC is in full and complete command and all personnel shall execute his/her orders precisely during flight operations. In the event the PIC is unable to perform his/her duties the Contractor’s onsite Safety Professional shall be responsible for safely bringing the work to a stop.

c. Before each flight, the PIC, the Superintendent, and the line workers will analyze and address any conditions specific to the job and agree on the measures to mitigate or eliminate the safety hazards. If any special condition exists, adjust work procedures as necessary to ensure the safety of the personnel. Any changes to these procedures should be considered a temporary variance for the specific job.

d. HELICOPTER APPROACH DISTANCES: This requirement shall be included in the Operations and Safety Program (Program).

e. WORKING AROUND ENERGIZED FACILITIES: Minimum Helicopter

Approach Distances. The insulating air space is affected by the air movement over the rotor, referred to as rotor wash. The effect of the rotor wash adds 10 percent to the MAD for electrical workers. This value is referred to as the

MHAD. The MHAD between the helicopter/lineman configuration and any conductor at a different potential or grounded object must be maintained. All work on energized circuits will be performed under an HLO.

f. WALKING UNDER THE TAIL BOOM IS PROHIBITED AT ALL TIMES.

g. PERSONAL PROTECTIVE EQUIPMENT (PPE): PPE shall be inspected prior to each use. Any equipment that has any defects shall immediately be removed from service until satisfactorily repaired or replaced. The Program shall identify all PPE to be used, including the Pilot PPE (helmet, fire resistant flight suit and appropriate footwear as a minimum).

h. COMMUNICATION: The Contractor shall maintain communication between all personnel at all times. If the Contractor plans on using radio as a mean of communication, the Contractor shall furnish the COR with three radios. If, at any time, the line workers lose communication with the Pilot and/or Superintendent, the work shall be suspended when allowable and radio communications shall be re-established before continuing work procedures. Only work-related communications through radios will be allowed during helicopter work and during emergencies.

3.8.2.2. Emergency Procedures

a. COMMAND AUTHORITY AND RESPONSIBILITY: When an emergency exists, the PIC is responsible for the successful completion of the flight. The PIC is in full and complete command, and all personnel shall execute their orders precisely. During an emergency, the PIC may deviate from prescribed operating procedures, methods, weather minimums, and FARS (Federal Aviation Regulation) to the extent required in the interest of safety. When the

PIC declares an emergency, they will do so with the nearest Dispatch Center or air traffic control (ATC) facility, as appropriate, explain the situation, and request any needed assistance.

In an event that the PIC is unable to be in command during an emergency, the

Contractor’s on-site Safety Professional shall assume full and complete command, and all personnel shall execute their orders precisely. When an emergency is declared and the Safety Professional is in charge, they will be in contact with the nearest Dispatch Center or air traffic control (ATC) facility, as appropriate, explain the situation and request any needed assistance.

3.9. Quality Control and Quality Assurance

3.9.1. The Contractor is responsible for quality control and shall utilize its own internal quality control processes to monitor performance of this contract. The Contractor shall develop and maintain a Quality Control Plan (QCP) to ensure all services are performed in accordance with the PWS.

3.9.2. Government Surveillance of Contractor Performance. WAPA personnel will inspect and verify Contractor performance. The Government may use various methods to perform surveillance of Contractor performance, including reviewing work products, customer input, random sampling, periodic inspection, Contractor reporting, etc. Performance deficiencies will be identified by the CO or COR in writing.

FID NAME1 NAME2 FID1

0 Airport - Cottonwood AIR-CW 1 Airport - Cottonwood Keswick - Airport AIR-CW 2 Black Butte Dam - Tap BBD-SVP 3 Byron Bethany - Tap BYRT-BYR 4 Captain Jack - Olinda CPJ-ODA 5 Carr - Keswick No. 1 CAR-KE-1 6 Carr - Keswick No. 1 Carr - Keswick #2 CAR-KE-1 7 Carr - Keswick No. 2 CAR-KE-2 8 Carr - Valve House CAR-VAH 9 Carr Power Plant - Carr Swyd CARP-CAR

10 Columbia - Mowry CO-MOW 11 Columbia - Mowry Pumping Plant CO-MOW 12 Corning - Red Bluff CRN-RBD 13 Cottonwood - Olinda No. 1 CW-ODA-1 14 Cottonwood - Olinda No. 1 Cottonwood - Olinda #CW-ODA-1 15 Cottonwood - Olinda No. 2 CW-ODA-2 16 Cottonwood - Roseville CW-RSC 17 East Contra Costa Irrigation District - Tap ECCT-ECC 18 Elverta - Hurley No. 1 ELV-HUR-1 19 Elverta - Hurley No. 1 Elverta - Hurley #2 ELV-HUR-1 20 Elverta - Hurley No. 1 Hurley - Tracy #1 ELV-HUR-1 21 Elverta - Hurley No. 2 ELV-HUR-2 22 Elverta - Hurley No. 2 Hurley - Tracy #1 ELV-HUR-2 23 Elverta - Hurley No. 2 Hurley - Tracy #2 ELV-HUR-2 24 Elverta (SMUD) - Natomas (SMUD) ESE-NAM 25 Fiddyment - Elverta FIY-ELV 26 Flanagan - Keswick FLN-KE 27 Folsom - Dam East Abutment FOL-DEA 28 Folsom - Guard Unit FOL-GU 29 Folsom - Rose Springs FOL-RSP 30 Folsom - Roseville FOL-RSC 31 Folsom Powerplant K1A - Folsom Substation FOLP-FOL-1 32 Folsom Powerplant K2A - Folsom Substation FOLP-FOL-2 33 Folsom Powerplant K3A - Folsom Substation FOLP-FOL-3 34 Friant Tap FRIT-FRI 35 Glory Hole 17.2 - Kv Distribution Line GLHT-GLH 36 Hurley - Tracy No. 1 HUR-TRY-1 37 Hurley - Tracy No. 1 Hurley - Tracy #2 HUR-TRY-1 38 Hurley - Tracy No. 2 HUR-TRY-2 39 Keswick - Airport KE-AIR 40 Keswick - Obanion KE-OBN 41 Keswick - Obanion Keswick - Olinda #2 KE-OBN 42 Keswick - Obanion Olinda - Obanion KE-OBN 43 Keswick - Obanion Olinda - Obanion KE-OBN 44 Keswick - Olinda No. 2 KE-ODA-2 45 Keswick - Spring Creek 13.8 Kv Distribution Line KE-SCR 46 Keswick Power Plant - Keswick Switchyard KU1 KEP-KE-4 47 Keswick Power Plant - Keswick Switchyard KU1 KEP-KE-5 48 Keswick Power Plant - Keswick Switchyard KU2 KEP-KE-5 49 Keswick Power Plant - Keswick Switchyard KU3 KEP-KE-6 50 Keswick Power Plant - Keswick Switchyard No. 1 KEP-KE-1 51 Keswick Power Plant - Keswick Switchyard No. 2 KEP-KE-2 52 Keswick Power Plant - Keswick Switchyard No. 3 KEP-KE-3 53 Keswick Power Plant - Keswick Swyd KU1 KEP-KE-1 54 Keswick Power Plant - Keswick Swyd KU2 KEP-KE-2 55 Keswick Power Plant - Keswick Swyd KU6 KEP-KE-3 56 Keswick Power Plant to Keswick Substation No. 4 KEP-KE-4 57 Lewiston Hatchery LEW-HTR 58 Lewiston Tap LWN-LWNT 59 Livermore (WAPA) – Livermore Lab U-424 Substation LLL-424

Attachment1_WAPA_SNR_All_Lines_Structures.xlsx

FID2 Length 9.45

KE-AIR 0.51

9.33 0.43

148.72 0.79

CAR-KE-2 10.55

1.07 0.52 0.13 0.02 0.67 0.66 0.53

CW-ODA-2 8.26

0.52

140.72 0.02 0.30

ELV-HUR-2 10.68

HUR-TRY-1 0.53

0.40

HUR-TRY-1 0.19

HUR-TRY-2 0.33

0.35 0.44 6.15 0.28 0.37 0.73 7.03 0.12 0.19 0.21 0.63 6.16

52.36

HUR-TRY-2 9.14

52.29 9.95 1.12

KE-ODA-2 16.56

KE-OBN 37.81

ODA-OBN 79.79

0.36 2.58 0.16 0.14 0.13 0.12 0.16 0.14 0.24 0.03 0.03 0.03 0.14 0.61 0.99 1.15

60 Los Banos - Gates No. 3 LBS-GTS-3 61 Malin - Round Mountain No. 1 MLN-RDM-1 62 New Melones Power Plant No.1 NMP-NML-1 63 New Melones Power Plant No.2 NMP-NML-2 64 Nimbus - Folsom NIM-FOL 65 O'Banion - Elverta (SMUD) OBN-ESE 66 O'Banion - Elverta (SMUD) Elverta Smud Substat OBN-ESE 67 Obanion - Elverta No. 1 OBN-ELV-1 68 Obanion - Elverta No. 1 Obanion - Elverta #2 OBN-ELV-1 69 Obanion - Elverta No. 1 Roseville - Elverta #2 OBN-ELV-1 70 Obanion - Elverta No. 2 OBN-ELV-2 71 Obanion - Elverta No. 2 Fiddyment - Elverta OBN-ELV-2 72 Obanion - Natomas OBN-NAM 73 Obanion - Natomas Elverta Smud Substat OBN-NAM 74 Obanion - Natomas Obanion - Elverta SmuOBN-NAM 75 Obanion - Natomas Obanion - Elverta SmuOBN-NAM 76 Obanion - Sutter OBN-SUT 77 Old River Intake – Middle River Intake CCMT-CCM 78 Old River Intake – Middle River Intake ORI-CCM 79 Old River Tap to Old River ORIT-ORI 80 Olinda - Obanion ODA-OBN 81 Olinda - Tracy ODA-TCY 82 Red Bluff Power Plant Tap RPPT-RPP 83 Roseville - Elverta RSC-ELV-2 84 Roseville - Elverta <Null> RSC-ELV-2 85 Roseville - Elverta Fiddyment - Elverta RSC-ELV-2 86 Roseville - Elverta Roseville - Fiddyment RSC-ELV-2 87 Roseville - Fiddyment RSC-FIY 88 Round Mountain - Cottonwood No. 1 RDM-CW-1 89 San Luis Powerplant to San Luis Substation Gen-Tie A SLUP-SLU-A 90 San Luis Powerplant to San Luis Substation Gen-Tie B SLUP-SLU-B 91 San Luis Powerplant to San Luis Substation Gen-Tie C SLUP-SLU-C 92 San Luis Powerplant to San Luis Substation Gen-Tie D SLUP-SLU-D 93 Shasta - Cottonwood No. 1 SHA-CW-1 94 Shasta - Cottonwood No. 1 Shasta - Cottonwood #SHA-CW-1 95 Shasta - Cottonwood No. 2 SHA-CW-2 96 Shasta - Flanagan SHA-FLN 97 Shasta Pole 2 SHAT-SHA 98 Shasta Power Plant - Shasta SS SHAP-SHA-S 99 Shasta Power Plant - Shasta U1 SHAP-SHA-1

100 Shasta Power Plant - Shasta U2 SHAP-SHA-2 101 Shasta Power Plant - Shasta U3 SHAP-SHA-3 102 Shasta Power Plant - Shasta U4 SHAP-SHA-4 103 Shasta Power Plant - Shasta U5 SHAP-SHA-5 104 South Fork Repeater SFMT-TAP 105 Spring Creek - Keswick SCR-KE 106 Stony Gorge Camp SGOT-SGO 107 Stony Gorge Tap SGPT-SGP 108 Tesla - Tracy No. 1 TES-TRY-1 109 Tesla - Tracy No. 1 Tesla - Tracy No. 2 TES-TRY-1 110 Tracy - Banks TRY-BNK 111 Tracy - Contra Costa TRY-CC4 112 Tracy - Contra Costa Tracy - Los Vaqueros TRY-CC4 113 Tracy - Delta Mendota Canal DCIT-DCI 114 Tracy - Livermore TRY-LLL 115 Tracy - Livermore Tracy - Banks TRY-LLL 116 Tracy - Livermore Tracy - Banks TRY-LLL 117 Tracy - Los Vaqueros TRY-LVQ 118 Tracy - Tesla TCY-TES 119 Tracy - Tesla Tracy - Los Banos TCY-TES 120 Tracy 400V Siphon Breaker Line SIBT-SIB

83.11 94.47 0.33 0.52 6.64 0.56

ESE-NAM 0.27

0.50

OBN-ELV-2 24.87

RSC-ELV-2 1.19

0.67

FIY-ELV 1.00

0.28

ESE-NAM 4.00

0.11

OBN-ESE 26.35

3.99 0.02 3.68 2.47 0.72

194.01 0.26 0.34 0.06

FIY-ELV 6.62

RSC-FIY 5.05

0.15 33.57 0.26 0.35 0.47 0.55

23.06

SH-CW-2 6.49

23.00 2.53 1.15 0.13 0.13 0.13 0.14 0.14 0.15 0.19 2.13 0.69 0.71 0.07

TRY-TES-2 5.79

1.27 9.11

TRY-LVQ 11.88

4.48

10.59 0.20

TRY-BNK 1.94

0.85 0.75

TCY-LBS 6.81

0.79

121 Trinity - Carr TNI-CAR 122 Trinity - Carr TNY-CAR 123 Trinity - Trinity TNY-TNI 124 Trinity - Trinity Trinity - Carr TNY-TNI 125 Trinity - Weaverville TNI-WEA 126 Trinity Valve House 12Kv TNY-KRC 127 Tuttletown Recreation Area Tap Line 17.2-kV TTLT-TTL 128 Whiskeytown Generator - Whiskeytown Switchyard WHYP-WHY 129 Whiskeytown Switchyard WHYT-WHY

13.00 0.02 0.04

TNY-CAR 0.42

15.35 0.08 4.00 0.08 0.03

1279.74

ATTACHMENT 2

SNR Infrastructure

Overview

Job:

Prep. Date: 2/16/2022

Corona (UV &IR) Inspection Lines and Structures

CLIN/Item Description QTY

1 UV & IR Inspection - P1-Captain Jack-Olinda - 475 Structures 475

2 UV & IR Inspection - P1-Olinda-Tracy - 56 Structures 56

3 UV & IR Inspection - P2-Airport-Cottonwood - 12 Structures 12

4 UV & IR Inspection - P2-Carr-Keswick#1 - 66 Structures 66

5 UV & IR Inspection - P2-Carr-Keswick#2 - 7 Structures 7

6 UV & IR Inspection - P2-Carr-Valve House - 12 Structures 12

7 UV & IR Inspection - P2-Carr Power Plant-Carr Swyd - 2 Structures 2

8 UV & IR Inspection - P2-Cottonwood-Olinda#1 - 41 Structures 41

9 UV & IR Inspection - P2-Cottonwood-Olinda#2 - 2 Structures 2

10 UV & IR Inspection - P2-Cottonwood-Roseville - 136 Structures 136

11 UV & IR Inspection - P2-Flanagan-Keswick - 33 Structures 33

12 UV & IR Inspection - P2-Glory Hole 17.2 Distribution Line - 131 Structures 131

13 UV & IR Inspection - P2-Keswick-Airport - 31 Structures 31

14 UV & IR Inspection - P2-Keswick-Obanion - 125 Structures 125

15 UV & IR Inspection - P2-Keswick-Olinda No. 2 - 2 Structures 2

16 UV & IR Inspection - P2-Keswick-Spring Creek 13.8 Kv Distribution Line - 38 Structures 38

17 UV & IR Inspection - P2-Keswick Power Plant-Keswick Switchyard KU1 - 2 Structures 2

18 UV & IR Inspection - P2-Keswick Power Plant-Keswick Switchyard KU2 - 2 Structures 2

19 UV & IR Inspection - P2-Keswick Power Plant-Keswick Switchyard KU3 - 2 Structures 2

20 UV & IR Inspection - P2-Keswick Power Plant-Keswick Switchyard No. 1 - 3 Structures 3

21 UV & IR Inspection - P2-Keswick Power Plant-Keswick Switchyard No. 2 - 3 Structures 3

22 UV & IR Inspection - P2-Keswick Power Plant-Keswick Switchyard No. 3 - 3 Structures 3

23 UV & IR Inspection - P2-Lewiston Hatchery - 21 Structures 21

24 UV & IR Inspection - P2-Lewiston Tap - 18 Structures 18

25 UV & IR Inspection - P2-Malin-Round Mountain No. 1 - 301 Structures 301

26 UV & IR Inspection - P2-New Melones-New Melones 2 - 8 Structures 8

27 UV & IR Inspection - P2-New Melones Pp-New Melones Swyd - 6 Structures 6

28 UV & IR Inspection - P2-Round Mountain-Cottonwood No. 1 - 132 Structures 132

29 UV & IR Inspection - P2-Shasta-Cottonwood No. 1 - 118 Structures 118

30 UV & IR Inspection - P2-Shasta-Cottonwood No. 2 - 96 Structures 96

31 UV & IR Inspection - P2-Shasta-Flanagan - 16 Structures 16

32 UV & IR Inspection - P2-Shasta-Pole 2 - 29 Structures 29

33 UV & IR Inspection - P2-Shasta Power Plant - 12 Structures 12

34 UV & IR Inspection - P2-Shasta Fork Repeater - 4 Structures 4

35 UV & IR Inspection - P2-Spring Creek-Keswick - 14 Structures 14

36 UV & IR Inspection - P2-Stony Gorge Camp - 8 Structures 8

37 UV & IR Inspection - P2-Stony Gorge Tap - 10 Structures 10

38 UV & IR Inspection - P2-Trinity-Carr - 58 Structures 58

39 UV & IR Inspection - P2-Trinity-Trinity - 8 Structures 8

Western Area Power Administration

2022 Transmission Line and Structure Subset

40 UV & IR Inspection - P2-Trinity Valvehouse12Kv - 3 Structures 3

41 UV & IR Inspection - P2-Trinity Weaverville - 245 Structures 245

42 UV & IR Inspection - P2-Tuttletown Recreation Area Tap Line 17.2-kV - 81 Structures 81

43 UV & IR Inspection - P2-Whiskeytown Generator-Whiskeytown Swyd - 6 Structures 6

44 UV & IR Inspection - P2-Whiskeytown Switchyard - 2 Structures 2

Structures Total Count: 2,380

OY1 - Tier 2 and Tier 3 Only OY2 - Tier 2 and Tier 3 Only OY3 - Tier 2 and Tier 3 Only OY4 - Full System Inspection

P1 = Priority 1, P2 = Priority 2, P3 = Priority 3

Option Year(OY) Inspections