ATTACHMENT_A_DCCTC_26.03.30_Plans.pdf
PDF 3 MB Posted
- Attached to
- Water Main Connections to Dorchester County Career & Technology Center & Fire Training Facility Supply
- Solicitation number
- 2027-01
- Issued by
- Dillon County, South Carolina
About this file
This file consists of standard erosion control and stormwater management notes applicable to the Dorchester County Career & Technology Center and Fire Training Facility water main connection project in South Carolina. The notes establish mandatory best management practices (BMPs) and sediment and erosion control requirements for the construction activities associated with installing approximately 172 linear feet of 6-inch C900 DR18 Restrained Joint PVC water main, 531 linear feet of 3-inch SCH40 PVC pipe, 293 linear feet of 2-inch HDPE IPS DR11 pipe via horizontal directional drilling, a 2-inch Pressure Reducing Valve, a Backflow Preventer with insulated cover, and necessary appurtenances.
The standard notes mandate that contractors initiate stabilization measures within fourteen days of work cessation on exposed slopes exceeding eight vertical feet, conduct weekly inspections of all sediment and erosion control devices with corrective action required within forty-eight hours of any identified deficiencies, maintain silt fence and other erosion control devices throughout all construction phases, and implement appropriate sediment basins or filter systems for all dewatering and wash water discharge. Contractors are prohibited from discharging concrete washout wastewater, stucco and paint washout, fuels, oils, and solvents without appropriate treatment. A pre-construction conference must be held on-site prior to construction commencement, and comprehensive documentation including the Stormwater Pollution Prevention Plan (SWPPP), inspection records, and rainfall data must be maintained at the construction site and retained until final stabilization is achieved. These requirements reflect South Carolina Department of Health and Environmental Control (SCDHEC) standards for stormwater management and sediment and erosion control.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD NOTES
1. If necessary, slopes, which exceed eight (8) vertical feet should be stabilized with synthetic or vegetative mats, in addition to hydroseeding. It may be necessary to install temporary slope drains during construction. Temporary berms may be needed until the slope is brought to grade.
2. Stabilization measures shall be initiated as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more than fourteen days after work has ceased, except as stated below.
Where stabilization by the 14th day is precluded by snow cover or frozen ground conditions stabilization measures must be initiated as soon as practicable.
Where construction activity on a portion of the Site is temporarily ceased, and earth-disturbing activities will be resumed within 14 days, temporary stabilization measures do not have to be initiated on that portion of the Site.
3. All sediment and erosion control devices shall be inspected once every calendar week. If periodic inspection or other information indicates that a BMP has been inappropriately, or incorrectly, the Permittee must address the necessary replacement or modification required to correct the BMP within 48 hours of identification.
4. Provide silt fence and/or other control devices, as may be required, to control soil erosion during utility construction. All disturbed areas shall be cleaned, graded, and stabilized with grassing immediately after the utility installation. Fill, cover, and temporary seeding at the end of each day are recommended. If water is encountered while trenching, the water should be filtered to remove sediment before being pumped back into any waters of the State.
5. All erosion control devices shall be properly maintained during all phases of construction until the completion of all construction activities and all disturbed areas have been stabilized. Additional control devices may be required during construction in order to control erosion and/or offsite sedimentation. All temporary control devices shall be removed once construction is complete and the site is stabilized.
6. The contractor must take necessary action to minimize the tracking of mud onto paved roadway(s) from construction areas and the generation of dust. The contractor shall daily remove mud/soil from pavement, as may be required.
7. Residential subdivisions require erosion control features for infrastructure as well as for individual lot construction. Individual property owners shall follow these plans during construction or obtain approval of an individual plan in accordance with S.C Reg. 72-300 et seq. and SCR100000.
8. Temporary diversion berms and/or ditches will be provided as needed during construction to protect work areas from upslope runoff and/or to divert sediment-laden water to appropriate traps or stable outlets.
9. All waters of the State (WoS), including wetlands, are to be flagged or otherwise clearly marked in the A double row of silt fence is to be installed in all areas where a 50-foot buffer can’t be maintained between the disturbed area and all WoS. A 10-foot buffer should be maintained between the last row of silt fence and all WoS.
10. Litter, construction debris, oils, fuels, and building products with significant potential for impact (such as stockpiles of freshly treated lumber) and construction chemicals that could be exposed to stormwater must be prevented from becoming a pollutant source in storm water discharges.
11. A copy of the SWPPP, inspections records, and rainfall data must be retained at the construction site or a nearby location easily accessible during normal business hours, from the date of commencement of construction activities to the date that final stabilization is reached.
12. Initiate stabilization measures on any exposed steep slope (3H:1V or greater) where land-disturbing activities have permanently or temporarily ceased, and will not resume for a period of 7 calendar days.
13. Minimize soil compaction and, unless infeasible, preserve topsoil.
14. Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other wash waters. Wash waters must be treated in a sediment basin or alternative control that provides equivalent or better treatment prior to discharge;
15. Minimize the discharge of pollutants from dewatering of trenches and excavated areas. These discharges are to be routed through appropriate BMPs (sediment basin, filter bag, etc.).
16. The following discharges from sites are prohibited:
Wastewater from washout of concrete, unless managed by an appropriate control;
Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds and other construction materials;
Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; and Soaps or solvents used in vehicle and equipment washing.
17. After construction activities begin, inspections must be conducted at a minimum of at least once every calendar week and must be conducted until final stabilization is reached on all areas of the construction site.
18. If existing BMPs need to be modified or if additional BMPs are necessary to comply with the requirements of this permit and/or SC’s Water Quality Standards, implementation must be completed before the next storm event whenever practicable. If implementation before the next storm event is impracticable, the situation must be documented in the SWPPP and alternative BMPs must be implemented as soon as reasonably possible.
19. A Pre-Construction Conference must be held for each construction site with an approved On-Site SWPPP prior to the implementation of construction activities. For non-linear projects that disturb 10 acres or more this conference must be held on-site unless the Department has approved otherwise.
Standard notes from SCDHEC "Stormwater Management and Sediment and Erosion Control Plan Review Checklist For Design Professionals" dated February 2017.
L
| DCCTC260330 01Cover |
| DCCTC260330 02Existing |
| DCCTC260330 03WaterPlan-DCCTC |
| DCCTC260330 04WaterPlan-FireTrainingFacility |
| DCCTC260330 05WaterUtilityDetails |
File details come from the government source that posted it. Updated .