Attachment_A_-_City_of_Tustin_CATP_SOW.pdf
PDF 233 KB Posted
- Attached to
- Citywide Active Transportation Plan RFP
- Solicitation number
- 2026-11 (ATP)
- Issued by
- Orange County, California
About this file
Summary
This Scope of Work document outlines the City of Tustin's requirements for developing a comprehensive Citywide Active Transportation Plan (CATP) with the California Department of Transportation (Caltrans) District 12. The City of Tustin, with a population of approximately 78,000 residents covering 11.08 square miles and home to 14 public schools operated by Tustin Unified School District (TUSD), seeks an experienced engineering or planning firm to develop a comprehensive ATP that incorporates identified bicycle and pedestrian improvements and Safe Routes to School (SRTS) components. The project encompasses seven primary tasks: Project Coordination, Existing Conditions Assessment, Analysis, Public Outreach and Engagement, Technical Advisory Committee management, Project Recommendations and Implementation Strategy, and Draft and Final Plan development culminating in City Council Review and Approval. The consultant is required to conduct a minimum of two community workshops, up to four school and stakeholder workshops, six interactive pop-up events, and walk audits at up to 14 schools. The project includes preparation of up to 15-percent conceptual designs for the five highest-ranked infrastructure projects with grant-ready cost estimates. The consultant must establish and coordinate a Technical Advisory Committee with a minimum of four meetings scheduled at key project milestones, with the possibility of up to four additional meetings subject to available funding and City authorization.
The City's anticipated maximum consultant contract budget is $400,000, inclusive of all consultant and subconsultant services, direct expenses, outreach, and required deliverables, which is separate from the total $500,000 grant-funded project budget that includes City administration and local matching funds. The project is funded through the Caltrans Sustainable Transportation Planning Grant Program, with $425,000 in state funding supplemented by $75,000 in local matching funds. The consultant must comply with all state funding requirements associated with this grant and ensure deliverables align with California Transportation Commission (CTC) Active Transportation Program guidance and are submitted to Caltrans in ADA-accessible electronic format. The project scope emphasizes engagement with disadvantaged communities through multilingual outreach materials, sign language interpreters, accessibility accommodations, and targeted analysis of disadvantaged project areas. The consultant shall coordinate concurrently with the City's Vision Zero Action Plan and General Plan Update efforts, ensuring the CATP serves as the primary source for proposed bicycle and pedestrian networks and associated General Plan policy recommendations without delaying the project schedule pending completion of either concurrent plan.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A
SCOPE OF WORK
INTRODUCTION
Tustin has a population of approximately 78,000 residents and covers 11.08 square miles.
Tustin is home to 14 public schools, ranging from early childhood to adult education schools, operated by the Tustin Unified School District (TUSD). Currently, the City does not have AT or SRTS Plans.
The City was awarded $425,000 in state funding through Caltrans Sustainable
Transportation Planning Grant Program, supplemented by $75,000 local matching funds, to develop a comprehensive ATP. The City desires to engage a qualified professional consultant to develop a comprehensive Active Transportation Plan (ATP) that incorporates identified bicycle and pedestrian needed improvements, and Safe Routes to School
(SRTS). This Plan will provide a clear and actionable strategy to promote walking and bicycling as a part of healthy lifestyles, reduce bicyclist/pedestrian-involved collisions, and decrease transportation-related pollution. The ATP Plan will result in recommended infrastructure/non-infrastructure projects and programs that reflect local and national engineering best practices, rigorous data analysis, and extensive stakeholder engagement.
The City's anticipated maximum consultant contract budget is $400,000, inclusive of all consultant and subconsultant services, direct expenses, outreach, and required deliverables. This amount is separate from the total $500,000 grant-funded project budget, which includes City administration, local match, and other eligible project costs. The City reserves the right to negotiate scope and compensation consistent with the approved grant agreement.
The City is concurrently developing a Citywide Vision Zero Action Plan, and the City’s
General Plan Update is also underway, with completion anticipated in late 2028. The
Consultant shall coordinate with the City's concurrent Vision Zero Action Plan and General
Plan Update efforts. The Consultant shall review and incorporate available data, preliminary findings, collision analyses, and relevant recommendations from these efforts, as applicable, without delaying the CATP schedule pending completion of either plan. The
CATP will serve as the primary source for proposed bicycle/pedestrian networks and associated General Plan policy recommendations.
SCOPE OF WORK
Task 0: Project Coordination
As an initial activity under this task, a kick-off meeting will be scheduled with project staff from Tustin and Caltrans District 12, the selected Consultant and others as relevant. Items for discussion will include project tasks, project timeline, review process, required deliverables, communication channels, existing data and reports, and other project elements as necessary. An agenda will be prepared by the Consultant to guide the meeting and resulting meeting minutes will be prepared and distributed.
Additionally, project status meetings will be scheduled on a regular basis between Tustin and the Consultant to review project schedules, budgets, and deliverables. The
Consultant will submit complete invoice and progress report packages to the City on a monthly basis. The invoice and progress reports will be submitted in a format that aligns with Caltrans invoicing and quarterly progress reports (QPR) requirements.
Task Deliverables
1. Project kick-off meeting, agenda and meeting notes
2. Project status meetings, agenda and meeting notes
3. Consultant project status reports and invoices
Task 1: Existing Conditions Assessment
The Consultant shall collect and review existing plans, policies, programs, and data.
Existing plans will include, but not be limited to:
▪ Tustin’s General Plan Circulation Element and Housing Element;
▪ Tustin’s Vision Zero Action Plan;
▪ ADA Transition Plan;
▪ Tustin’s Specific Plans for Tustin Legacy and Red Hill Corridor;
▪ Tustin’s Capital Improvement Projects;
▪ Orange County Transportation Authority’s (OCTA) SRTS Action Plan, OCTA’s
Orange County (OC) Bikeways Map, and OCTA’s OC Active website;
▪ SCAG’s Connect SoCal.;
▪ Caltrans Toward an Active California State Bicycle + Pedestrian Plan, and relevant
State policies and programs; and
▪ All private, non-profit, or public programs, policies, zoning Regulations affecting active transportation such as policies, zoning ordinances, and traffic modes.
The Consultant will gather existing conditions and background data for each school in the TUSD serving Tustin, bikeways, trails, sidewalks, existing land uses within the Tustin boundary, population characteristics, travel projections, and collision data. The
Consultant will conduct traffic counts at selected locations to include project schools as well as other areas of interest, and pedestrian and bicyclist counts, in order to assess demand that can identify areas for improvement and prioritize potential projects. The
Consultant will also prepare base maps for each school showing the school location, enrollment boundaries, school bus routes and ridership, and crossing guard locations, and other pertinent information. Base maps of existing bike paths and trails will be prepared.
Trail and sidewalk gaps will also be mapped.
The consultant shall inventory existing nonmotorized travel and infrastructure data. Data will be compiled into a technical report to inform presentations and outreach. Data collected should include, but not be limited to:
▪ Traffic volumes and roadway capacity
▪ Demographics of walking, biking
▪ Pedestrian and bicycle crash data
▪ Connectivity
▪ Suitability for all modes of travel including transit
▪ Maintenance policies, programs, and equipment.
In addition, the consultant shall develop a series of geographic information system (GIS) maps documenting and summarizing the following by jurisdiction (where applicable, the consultant will use SCAG templates to ensure a standardized format):
▪ Existing active transportation facility types, locations, & condition (GIS) using
SCAG templates where possible;
▪ Conflict zones (GIS);
▪ Amenities (GIS);
▪ Bicycle parking types, locations, and condition (GIS);
▪ Cycling and walking volumes (GIS);
▪ Transit routes, frequency, and volumes (GIS);
▪ Injury/fatality locations and collision types (GIS);
▪ Other data determined by local agencies
A summary of existing conditions will be prepared to document methods and findings and will be included in the draft and final ATP.
Task Deliverables
1. Existing conditions mapping
2. Existing conditions summary
3. GIS data for City’s use and records at completion of the project
Task 2: Analysis
An analysis for the existing conditions shall be conducted. The consultant shall use available Vision Zero collision analysis and High-Injury Network findings, supplemented by bicycle/pedestrian-specific analysis. The Consultant shall ensure that the CATP maintains its distinct focus on bicycle and pedestrian transportation planning while coordinating with the City's Vision Zero Action Plan and General Plan Update. The Consultant shall incorporate relevant available data and findings from these concurrent efforts, as appropriate, while avoiding duplication of work. A description of the methodology used, rankings developed for sidewalk and trail segments, and resulting priorities will be described in the ATP. Criteria used to rank segments may include, but not limited to:
▪ Condition of sidewalk/pathway and associated characteristics such as obstructions, slope, gaps, grade, curb ramp configuration, and others;
▪ Distance from pedestrian generators;
▪ Health data;
▪ Socioeconomic data;
▪ Capital Improvement project lists; and
▪ School proximity.
A bicycle/pedestrian collision analysis will be performed. Collision data involving pedestrians will be gathered from the California Transportation Injury Mapping System
(TIMS) which utilizes the California Statewide Integrated Traffic Records System (SWITRS).
The analysis will include safety requirements for the Active Transportation Program.
Additionally, Consultant will identify specific analyses that focus on prioritizing disadvantaged project areas in Tustin.
An initial analysis with tract maps and other historical documents will be conducted. The research results will be analyzed to determine where appropriate easements exist that might be used to construct new bike lanes or missing sidewalk. Areas that contain easements for potential active transportation improvement will be selected for fieldwork analysis. Routes identified as planned local multipurpose trails will be examined for potential for multipurpose trails, paved paths, bicycle paths, bicycle lanes or bicycle routes.
The findings of these analyses will be provided in a technical memorandum and included in the draft and final ATP.
Task Deliverables
1. Summary of Analysis/Analysis Memo
Task 3: Public Outreach and Engagement
A Public Outreach and Engagement Plan will be prepared by the Consultant in collaboration with the City and Tustin Unified School District. The plan will include community engagement tools and events to be used throughout the development of the ATP. Events will be publicly noticed to ensure maximum attendance. Notices will be in English, Spanish, and any additional languages necessary. Sign language interpreters will also be present at workshops, as requested.
A priority of the Outreach and Engagement Plan will be to include a strategy to fully engage disadvantaged communities, including outreach in multiple languages and means to reach groups that may not participate in traditional planning events. The plan will also include strategies for engaging all project stakeholders. Consultant will work with each city’s Accessibility/ADA Coordinator to ensure that community engagement materials and events meet or exceed accessibility requirements so all residents can participate, including non-English speakers, those without childcare or transportation, and those who work nights/weekends. Project representatives will attend different community events to gather public input. At a minimum, the Consultant shall provide the following outreach activities, as further described in this task:
▪ A project-specific project webpage that includes interactive features to make the project engaging and easy to understand so as to encourage input;
▪ Survey questions or announcements on municipal websites;
▪ At least two (2) Community workshops in various parts of the city with interpreters and child-friendly activities;
▪ At least six (6) interactive pop-ups at community events such as farmers markets, street fairs, school events, food truck events, or neighborhood gatherings;
▪ Walk audits for up to 14 schools;
▪ Social media channels such as Facebook, Twitter, and Nextdoor and
▪ A monthly e-newsletter on the project-specific project webpage .
For each of the above outreach methods, as necessitated by specific project requirements, information may also be communicated in Spanish and any additional languages necessary.
Project webpages will be developed by the Consultant for the city’s websites and social media platforms. Developed content will promote outreach and education materials, document workshops, promote surveys, workshops, and walk audits. The draft and final ATP will also be provided on these websites. The website will allow stakeholders to submit feedback without attending in-person events, if preferred.
Community Workshops and Pop-Up Events
The Consultant shall conduct a minimum of two (2) community workshops at different locations within the City to obtain public input on existing walking and bicycling conditions, network gaps, safety concerns, and proposed improvements.
The Consultant shall also conduct up to four (4) school and stakeholder workshops involving school staff, parents, law enforcement, health agencies, and community organizations. These workshops shall emphasize Safe Routes to School (SRTS), including education and engagement related to safe walking and bicycling to school. At least two (2) workshops shall be held at a school or location near a disadvantaged school, defined as a school where 75% or more of students are eligible for Free and Reduced-
Price Meals.
The Consultant shall include six (6) interactive pop-up events at existing community activities, such as farmers markets, school events, street fairs, and neighborhood gatherings. The City will coordinate with the Consultant to identify suitable events and locations.
Community workshops, school workshops, and pop-up events shall be treated as separate engagement activities for purposes of determining the required quantities.
Activities may be coordinated on the same day or at the same venue, provided each activity has a distinct purpose and engagement component. Any proposed consolidation shall require prior City approval and shall not reduce the outreach commitments established in the approved Caltrans Scope of Work.
Safe Routes to School Walk Audits
The Consultant shall conduct walk audits at up to fourteen (14) school sites selected by the City in coordination with Tustin Unified School District. For proposal purposes, consultants shall assume fourteen (14) individual school-site assessments.
Each walk audit shall include field observations during a representative morning arrival or afternoon dismissal period, evaluation of pedestrian and bicycle access, crossing conditions, accessibility barriers, traffic circulation, and opportunities for safety improvements. The Consultant shall engage school representatives, parents, and other stakeholders to identify barriers and recommended improvements. An online mapping tool shall be provided to allow individuals unable to attend the walk audits to identify locations of concern and submit comments. The Consultant shall prepare a Walk Audit
Report documenting existing conditions, stakeholder feedback, photographs, identified deficiencies, and recommended improvements for each school site.
Where multiple schools share common access routes or intersections, field observations may be coordinated to avoid duplication; however, findings and recommendations shall be documented separately for each school.
Student Travel Tallies and Parent Surveys
The Consultant shall conduct two (2) rounds of student travel tallies and parent surveys, one during the initial assessment phase and another during the later planning phase, using standardized Student Travel Tally and Parent Survey instruments from the National
Center for Safe Routes to School.
The Consultant shall summarize the results, identify changes in reported travel behavior and perceptions, and prepare a Student Travel Tallies and Parent Surveys Analysis
Memorandum.
Task Deliverables
1. Public Outreach and Engagement Plan
2. Project webpages and monthly electronic newsletters
3. Surveys and questionnaires
4. PowerPoint presentations
5. Website announcements
6. Photos, outreach materials, and handouts
7. Two (2) community workshops, including attendance records and summaries
8. Up to four (4) school/stakeholder workshops, including at least two (2) at or near disadvantaged schools
9. Six (6) interactive pop-up events, including documentation of public feedback
10. Walk Audit Reports for up to fourteen (14) schools
11. Two (2) rounds of student travel tallies and parent surveys
12. Student Travel Tallies and Parent Surveys Analysis Memorandum
13. Public Outreach and Engagement Summary documenting participation, feedback, and incorporation of comments into the CATP
Task 4: Technical Advisory Committee
The Consultant shall establish and coordinate an Active Transportation Plan (ATP)
Technical Advisory Committee (TAC) to provide technical guidance and stakeholder input throughout the development of the Plan.
The Consultant shall prepare a proposed list of TAC members for City review and approval. Members may include, but are not limited to, Caltrans District 12 staff, City staff, Tustin Unified School District (TUSD), Tustin Police Department, Orange County
Transportation Authority (OCTA) active transportation and Safe Routes to School (SRTS) staff, Orange County Health Care Agency, Parent Teacher Association (PTA) representatives, and community-based organizations.
The Consultant shall conduct a minimum of four (4) TAC meetings throughout the project. These meetings shall be included in the base proposal and scheduled at key project milestones, including:
▪ Project initiation, goals, and existing conditions.
▪ Analysis findings, network gaps, and community input.
▪ Preliminary project recommendations and prioritization.
▪ Draft ATP, implementation strategies, and final recommendations.
The Consultant shall prepare meeting agendas, presentation materials, meeting minutes, and action items for each TAC meeting. The TAC shall provide technical input on proposed bicycle and pedestrian improvements, Safe Routes to School recommendations, prioritization criteria, and implementation strategies.
The Consultant shall identify the potential need for up to four (4) additional TAC meetings based on project progress and stakeholder input. Additional meetings shall be conducted only upon prior written authorization from the City and subject to available project funding. These additional meetings are not required to be included in the base proposal.
The Consultant shall coordinate with land-use planners and technical professionals from applicable agencies, including the City's General Plan Update team, to ensure consistency between the ATP and related transportation, land-use, and housing planning efforts. The Consultant shall review available information on existing and planned transportation improvements and development projects to inform TAC discussions and recommendations.
The Consultant shall also encourage participation from PTA representatives, students, and community members from disadvantaged communities to ensure diverse perspectives are represented.
Task Deliverables
1. Confirmed list of TAC members.
2. TAC meeting agendas and presentation materials (minimum four meetings).
3. Meeting minutes, including discussion summaries and action items.
4. Meeting attendance records.
5. Summary of TAC recommendations and how comments were addressed in the
ATP.
Task 5: Project Recommendations & Implementation Strategy
The Consultant shall develop walking and bicycling infrastructure and programmatic recommendations based on the existing conditions analysis and community engagement, including input from disadvantaged communities. Recommendations shall address safety, accessibility, mobility, and mode shift, and incorporate industry best practices, including
FHWA’s Safe System Approach and Complete Streets principles.
The Consultant shall develop a prioritization methodology for recommended projects and strategies, subject to review by the City and Technical Advisory Committee (TAC).
Prioritization criteria shall include cost, feasibility, community needs, disadvantaged community benefits, and public engagement.
The Consultant shall prepare up to 15-percent conceptual designs for the five (5) highest-ranked infrastructure projects to support future funding applications. Grant-ready level conceptual plan and planning-level cost estimates shall be prepared for each project.
Conceptual plans shall cover a representative segment up to one (1) mile per project, with the actual limits determined by the City on the proposed improvements, project characteristics, and anticipated funding opportunities. For projects extending beyond one mile, the Consultant shall identify the overall project limits and prepare detailed conceptual layouts for representative segments, intersections, or locations that adequately illustrate the proposed improvements. Conceptual plans shall be prepared in AutoCAD at an appropriate scale, generally 1" = 40', and presented on aerial imagery. Cost estimates shall cover the proposed improvements within the identified project limits and use the applicable Active Transportation Program (ATP) cost estimate template.
The Consultant shall also develop an implementation strategy in coordination with City staff and community stakeholders. The strategy shall include project phasing (short-, medium-, and long-term), implementation cost estimates, potential public and private funding sources, grant programs best suited for City applications, and opportunities to incorporate projects into the City’s Capital Improvement Program (CIP). The Consultant shall identify candidate projects suitable for future ATP funding applications, including the anticipated 2028 funding cycle, and provide preliminary project descriptions, limits, planning-level cost estimates, implementation readiness, and potential funding eligibility.
Preliminary candidate recommendations shall be provided to the City by December 2027, with updated project concepts and supporting information by March 2028.
Task Deliverables
1. Ranking Criteria and Methodology Memorandum
2. Prioritized Recommendations Memorandum
3. Unit Rate-Based Cost Estimates
4. Up to 15% Engineering Concept Plans and Cost Estimate (Up to five projects)
5. Implementation Strategy
Task 6: Draft and Final Plan
The ATP will document existing conditions, the analyses performed, and recommendations for priority active transportation projects throughout the project boundaries. Recommendations will include preliminary cost estimates that align with the requirements of the California Transportation Commission (CTC) Active Transportation
Program, so that the recommendations can be incorporated into future grant applications for implementations. All recommendations, maps, and cost estimates will be included in the Draft and Final Active Transportation Plan. Projected financial needs will also be included for priority projects and programs along with anticipated revenue sources and potential grant funding.
The Consultant will prepare a Draft ATP for City staff review. The Draft ATP will be aligned with the CTC Active Transportation Program guidance and will include a summary of actionable next steps for implementing the project recommendations. The Consultant will incorporate City staffs’ comments as applicable and prepare a revised Draft ATP for stakeholder and general public review. The plan will be in a format that is compatible for uploading to the City’s websites and used individually as needed. A request for public comments will be advertised through various media per the City’s requirements. The draft
ATP will include specific reference to disadvantaged communities within the plan boundaries that will benefit by prioritization of these targeted areas. The draft plan will include clearly delineated sections that outline the disadvantaged community areas, as identified in the introduction of this document, in order to bolster prioritizing elements of the project that will benefit those groups.
The ATP will include SRTS as separate chapters.
At the end of the public comment period, the Consultant will compile all comments and prepare responses. This response to comments document will be made available for public access on the City’s websites. The Consultant will incorporate stakeholder and public comments into Final ATP, as applicable, and will prepare Final ATP in formatted, electronic form. The Final ATP will credit Caltrans on the cover and title page and will be submitted to Caltrans in an ADA accessible electronic copy.
The CATP will serve as the primary source for proposed bicycle/pedestrian networks and associated General Plan policy recommendations. The Consultant shall coordinate with the General Plan Project Team to ensure policies and recommendations consistency across initiatives.
Task Deliverables
1. Administrative Draft Plan
2. Draft ATP (The ATP document will include SRTS as separate chapters).
3. Compilation of Public Comments and Responses
4. Final ATP Plan with credit to Caltrans on cover Page (submitted to Caltrans in an
ADA accessible electronic copy)
Task 7: Council Review/Approval
The Consultant shall prepare the Final Citywide Active Transportation Plan (CATP) for presentation to the City Council for review, consideration, and adoption. The City's intent is to obtain an adopted CATP to guide future bicycle and pedestrian improvements and support eligibility and competitiveness for future transportation grant funding opportunities.
The Consultant shall coordinate with City staff to prepare the necessary presentation materials, staff report supporting documents, and draft resolution for Council adoption.
The Consultant shall attend one (1) City Council meeting to present the Final CATP, respond to questions, and provide technical support.
If the City Council requests revisions, the Consultant shall incorporate Council-directed changes into the Final CATP, subject to City approval and the approved project scope and budget. The Consultant shall provide the final adopted CATP following Council approval.
Should the City Council elect not to adopt the CATP, the Consultant shall document the
Council's direction and provide the completed plan and supporting materials to the City for future consideration.
Task Deliverables
1. Final CATP for City Council consideration and adoption.
2. City Council presentation and supporting materials.
3. Draft Council adoption resolution.
4. City Council meeting minutes documenting Council action.
5. Final adopted CATP, if approved, or completed CATP incorporating Council-directed revisions.
| SCOPE OF WORK |
| SCOPE OF WORK |
| Task 0: Project Coordination |
| Task 1: Existing Conditions Assessment |
| Task 2: Analysis |
| Task 3: Public Outreach and Engagement |
| Task 4: Technical Advisory Committee |
| Task 5: Project Recommendations & Implementation Strategy |
| Task 6: Draft and Final Plan |
| The ATP will include SRTS as separate chapters. |
| Task 7: Council Review/Approval |