Attachment A - Bid Schedule.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- B25-13
- Issued by
- Colorado
About this file
The document is an Attachment A - Bid Schedule for Project No. 5025 - Timnath Pedestrian Bridge and Trail, located in Colorado, involving a multi-modal transportation infrastructure project. The bid schedule outlines several key construction activities including clear and grub work, tree removal and trimming, concrete and fence removal, excavation, unsuitable material management, and borrow operations. The project specifically involves installing approximately one mile of 10-foot wide concrete trail adjacent to the Poudre River north of CR32E, with a pedestrian bridge installation over an irrigation canal.
The bid schedule contains line items for various construction activities with approximate quantities specified, such as 9 tree removals, 8 tree trimmings, 82 square yards of concrete removal, 125 linear feet of fence removal, 487 cubic yards of unclassified excavation, and 1,287 tons of unsuitable material management. The project is funded through a Multimodal Transportation Fund (MTF) grant, indicating state-level transportation infrastructure investment. While the bid schedule shows line items, the current document does not reflect specific unit pricing, suggesting this may be part of a subsequent bidding phase or require additional documentation for complete pricing details.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| REF | ||
| NO. | CONT | |
| ITEM | CONTRACT ITEM | APPROX. |
| QUAN. | UNITS | UNIT PRICE |
| (2 decimals only) | EXTENDED |
AMOUNT
| 1 | 201 | Clear and Grub | 1 | L S | $ - 0 | |
| 2 | 202 | Removal of Tree | 9 | EACH | $ - 0 | |
| 3 | 202 | Tree Trimming | 8 | EACH | $ - 0 | |
| 4 | 202 | Removal of Concrete | 82 | SY | $ - 0 | |
| 5 | 202 | Removal of Fence | 125 | LF | $ - 0 | |
| 6 | 203 | Unclassified Excavation | 487 | CY | $ - 0 | |
| 7 | 203 | Unsuitable Material (Complete In Place) | 1287 | TON | $ - 0 | |
| 8 | 203 | Borrow (R<40) (Complete In Place) | 700 | CY | $ - 0 | |
| 9 | 203 | Blading | 50 | HOUR | $ - 0 | |
| 10 | 206 | Structure Excavation | 110 | CY | $ - 0 | |
| 11 | 206 | Structure Backfill (Special) | 90 | CY | $ - 0 | |
| 12 | 207 | Topsoil | 2017 | CY | $ - 0 | |
| 13 | 207 | Stockpile Topsoil | 2017 | CY | $ - 0 | |
| 14 | 207 | Wetland Topsoil | 393 | CY | $ - 0 | |
| 15 | 207 | Stockpile Wetland Topsoil | 393 | CY | $ - 0 | |
| 16 | 208 | Silt Fence | 1300 | LF | $ - 0 | |
| 17 | 208 | Erosion Log Type 3 (12 Inch) | 8900 | LF | $ - 0 | |
| 18 | 208 | Concrete Washout Structure | 2 | EACH | $ - 0 | |
| 19 | 208 | Vehicle Tracking Pad | 2 | EACH | $ - 0 | |
| 20 | 208 | Erosion Control Management | 10 | DAY | $ - 0 | |
| 21 | 210 | Adjust Manhole | 1 | EACH | $ - 0 | |
| 22 | 211 | Dewatering | 1 | L S | $ - 0 | |
| 23 | 216 | Soil Retention Blanket (Special) | 1315 | SY | $ - 0 | |
| 24 | 217 | Herbicide Treatment | 40 | HOUR | $ - 0 | |
| 25 | 240 | Wildlife Biologist | 20 | HOUR | $ - 0 | |
| 26 | 240 | Prairie Dog Management | 1 | L S | $ - 0 | |
| 27 | 304 | Aggregate Base Course (Class 6) | 3658 | TON | $ - 0 | |
| 28 | 304 | Crusher Fines | 1000 | TON | $ - 0 | |
| 29 | 420 | Geotextile (Erosion Control) (Class 1) | 775 | SY | $ - 0 | |
| 30 | 503 | Micropile (5 Inch) | 270 | LF | $ - 0 | |
| 31 | 503 | Verification Test Pile | 2 | EACH | $ - 0 | |
| 32 | 506 | Riprap (12 Inch) | 175 | CY | $ - 0 | |
| 33 | 509 | Prefabricated Steel Structure with Concrete Deck | 1 | L S | $ - 0 | |
| 34 | 514 | Pedestrian Railing (Steel Tubing) | 60 | LF | $ - 0 | |
| 35 | 601 | Concrete Class D (Wall) | 54 | CY | $ - 0 | |
| 36 | 602 | Reinforcing Steel | 8365 | LB | $ - 0 | |
| 37 | 603 | 42 Inch Equivalent Corrugated Steel Pipe Arch (Complete In Place) | 72 | LF | $ - 0 | |
| 38 | 603 | 12 Inch Steel End Section (Complete In Place) | 8 | EACH | $ - 0 | |
| 39 | 603 | 18 Inch Steel End Section (Complete In Place) | 4 | EACH | $ - 0 | |
| 40 | 603 | 12 Inch Plastic Pipe (Complete In Place) | 92 | LF | $ - 0 | |
| 41 | 603 | 18 Inch Plastic Pipe (Complete In Place) | 140 | LF | $ - 0 | |
| 42 | 608 | Detectable Warnings | 32 | SF | $ - 0 | |
| 43 | 608 | Concrete Bikeway (6 Inch) (Fiber) | 4575 | SY | $ - 0 | |
| 44 | 608 | Concrete Bikeway (8 Inch) (Fiber) | 942 | SY | $ - 0 | |
| 45 | 614 | Ground Sign Panel and Post | 4 | EACH | $ - 0 | |
| 46 | 614 | Pedestrian Crossing Signal System | 1 | EACH | $ - 0 | |
| 47 | 620 | Sanitary Facility | 2 | EACH | $ - 0 | |
| 48 | 625 | Construction Surveying | 1 | L S | $ - 0 | |
| 49 | 626 | Mobilization | 1 | L S | $ - 0 | |
| 50 | 627 | Preformd Thermoplastic Pavement Mkg (125 Mils) | 120 | SF | $ - 0 | |
| 51 | 630 | Flagging | 160 | HOUR | $ - 0 | |
| 52 | 630 | Construction Traffic Control | 1 | L S | $ - 0 | |
| 53 | 630 | Traffic Control Inspection | 60 | DAY | $ - 0 | |
| 54 | 630 | Traffic Control Management | 20 | DAY | $ - 0 | |
| 55 | 700 | Force Account - Minor Contract Revisions | 1 | F A | $ 140,000.00 | $ 140,000.00 |
| 56 | 700 | Force Account - On-The-Job Trainee | 1 | F A | $ 2,000.00 | $ 2,000.00 |
| 57 | 700 | Force Account - Erosion Control | 1 | F A | $ 5,000.00 | $ 5,000.00 |
| 58 | 700 | Force Account - Weed Management | 1 | F A | $ 2,000.00 | $ 2,000.00 |
| 59 | 700 | Force Account - Wildlife Mgmt | 1 | F A | $ 10,000.00 | $ 10,000.00 |
| Contractor's Name | ||
| TOTAL…… | $ 159,000.00 | |
| (Please Print) |
Project No. 5025 Timnath Pedestrian Trail & Bridge
| &"Arial,Bold"&12BID SCHEDULE | |
| BID No. B25-13 | Page &P |
Date: June 23, 2025 Revision Date: ___________
File details come from the government source that posted it. Updated .