Attachment 9 - GMFL2025SitePrep0001AF.pdf
PDF 509 KB Posted
- Attached to
- GMF Rochester RD Site Prep
- Solicitation number
- 12444325Q0024
About this file
This image is a site preparation contract map for the Green Mountain National Forest (GMNF) Fiscal Year 2025, specifically for the Mayo Meadow Planning Unit 19 (PU19), Contract 0001AF. The map details a 2.9-acre site preparation subitem (highlighted in pink) within the national forest, located near Rochester, Pittsfield, and Stockbridge.
The map includes a detailed legend showing operational maintenance levels ranging from 0-5, with corresponding trail types (bicycle, hiking, cross-country ski, snowmobile, and snow shoe trails). The site is situated within a topographically varied landscape, with contour lines indicating elevation changes. The map provides precise geographic context through a small inset showing the location relative to nearby roads and towns, and includes a scale measuring from 0 to 0.1 miles. The document was created by JLD on 03/18/2025 and is part of the Forest Service's site preparation contract for the upcoming fiscal year.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0001AF
2.9 ac
0 0.05 0.10.03 Miles
Legend Operational Maintenance Level
NOT ASSIGNED
1 - BASIC CUSTODIAL CARE (CLOSED)
2 - HIGH CLEARANCE VEHICLES
3 - SUITABLE FOR PASSENGER CARS
4 - MODERATE DEGREE OF USER COMFORT
5 - HIGH DEGREE OF USER COMFORT
! ! Bicycle Trail
Hiking Trail
! ! Cross-country Ski Trail
Snowmobile Trail
Snow Shoe Trail
Site Preparation Subitem
Other Harvest Unit
National Forest
FY 25 GMNF Site Prep Contract - 0001AF
Map by JLD 03/18/2025
Æ·100
Æ·73
Æ·107
ROCHESTER
PITTSFIELD
STOCKBRIDGEMap Extent
Mayo Meadow PU19
File details come from the government source that posted it. Updated .