Attachment_8_RQR.pdf
PDF 90 KB Posted
- Solicitation number
- FA825025Q0510
About this file
This document is a Repair Qualification Requirements (RQR) file for a Power Supply (NSN: 6130-01-309-3090, P/N: 101-9361) used in the TYQ-23 application. The file outlines detailed qualification requirements for potential repair sources, including mandatory steps such as prequalification notice, facilities verification, data package completeness, and repair process compliance. Potential offerors must submit a qualification test plan to 415 SCMS/GUEA for approval, demonstrating compliance with performance, environmental, mechanical, and quality assurance requirements.
The related federal contract opportunity (Solicitation Number: FA825025Q0510) is a small business set-aside for repair services issued by the Department of the Air Force Materiel Command Air Force Sustainment Center. The solicitation includes seven line items covering various levels of power supply repair and associated data deliverables, with quantities of 5 units per repair category. Delivery timelines range from 30 to 120 calendar days after receipt of carcass, with different line items specifying test and evaluation (TT&E), minor repair, and major repair support. The solicitation will use electronic procedures for submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA825025Q0510_1.pdf | ||
| Attachment_9_CDRLs.pdf | ||
| Attachment_2_ITMDESC_REPORT.pdf | ||
| Attachment_4_PKG_SOW.pdf | ||
| Attachment_7_IUID.pdf | ||
| Attachment_1_CAVAF.docx | DOCX document | |
| Attachment_3_PKGRQMT_REPORT.pdf | ||
| Attachment_6_RDL_REPORT.pdf | ||
| Attachment_5_PWS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR QUALIFICATION REQUIREMENTS
NSN: 6130-01-309-3090
P/N: 101-9361 Noun: Power Supply Application: TYQ-23
17 Mar 2021 Section C 1/3
Qualification Requirement Cost Estimate Estimate the likely cost for testing and evaluation which will be incurred by the potential offeror to become qualified. This is a requirement of FAR 9.202(a)(1)(ii) and 10USC2319(b)(3) (The following categories may not apply in all cases. The product engineer should identify the costs applicable to the project and indicate N/A on all sections that do not apply.)
Total cost is $ 0.00 Section A. Shipping, if required, use DD Form 1654, Evaluation of Transportation Cost Factors to develop the information. Refer any questions to the Procurement Contracting Officer for cost estimation.
N/A
Section B. Dimensional/Electronic Verification. Contact the science/engineering laboratory to obtain cost estimates (bids) for tests such as:
$ 0.00
a. Chemical N/A
b. Metallurgical $ 0.00
(1) Destructive N/A
(2) Non-Destructive N/A
c. Dimensional N/A
d. Electronic N/A
e. Mechanical N/A
f. Non-Destructive Inspection N/A Section C. Nuclear Hardness [This includes cost of shock, vibration, and Electro-Magnetic Pulse (EMP)]. Contact Systems Engineering Integration and Test Division for hourly rate.
N/A
Section D. Form, Fit, Function and Interface. Contact your organizational Production Management Specialist (PMS) to obtain information on the same or similar item where work has been accomplished in the past using AFMC Form 206, Temporary Work Request.
N/A
Section E. Original Equipment Manufacturer (OEM) Qualification Testing (If required) $ 0.00
a. Laboratory Costs (Costs are directly dependent on the type of testing to be accomplished and the location and duration of the testing. For example, landing gear laboratory testing is normally accomplished on a dynamometer and costs vary from $25,000 to $500,000 depending on the depth of testing. Aircraft and missile testing will vary as the requirement dictates and the cost will have to be identified by the source of testing).
N/A
b. Flight/Data Reduction & Analysis Costs. N/A Section F. Travel by Contractor to Test Site (if required) $ 0.00
a. Lodging N/A
b. Per Diem N/A
c. Rental Cars N/A
d. Incidentals (Verified) N/A Section G. SAR Package Development/Evaluation Cost: A potential new source’s development of a Source Approval (SAR) package may cost as much as:
N/A
In addition, the cost incurred for Government evaluation of their SAR may be as much as: N/A Evaluation cost may be born by the government if it is in the best interest of the Government to qualify alternate sources.
N/A
SECTION C:
P/N: 101-9361
17 Mar 2021 Section C 2/3
1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE
a. Prequalification Notice: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this Power Supply.
b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to repair, inspect, test, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.
a. Data Verification: The offeror must verify that they have a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession including, at a minimum Behlman Electronics, Inc. (CAGE 12868) drawing 101-9361, Litton Systems, Inc. (CAGE 13973) drawing 246164. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.
b. Repair Process Verification: The offeror must repair this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 415 SCMS/GUEA. The offeror shall also identify its sources for materials and its standards for internally used processes.
c. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to 415 SCMS/GUEA for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Litton Systems, Inc. (CAGE 13973) Source Control Drawing 246164.
d. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified are $0.00.
e. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 30 days. This is based on complexity of the Power Supply and other factors.
f. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed
P/N: 101-9361
17 Mar 2021 Section C 3/3 to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.
g. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved repair source for this item. Approval, however, does not guarantee subsequent contract award.
2. SOURCE QUALIFICATION WAIVER REQUIREMENTS
Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:
a. QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).
b. QWC2: The potential source is qualified on the right-hand article and requests to be qualified on the left-hand article. If the right-and left-hand articles are mirror images of each other, then approval can generally be given.
c. QWC3: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.
d. QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.
e. QWC5: A source qualified to provide a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.
f. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the repair process.
File details come from the government source that posted it. Updated .