This document contains responses to requests for information (RFIs) regarding a federal solicitation to install new taxiway edge lights on Taxiway G at Eglin Air Force Base in Florida. The solicitation seeks design and construction services to route and install flush-mounted and elevated blue taxiway edge lights along Taxiway G and its hammerhead, as well as wiring, conduit, transformers, and other materials. The performance period is 210 days from notice to proceed. Bids are due by June 26, 2023. The contract value is estimated between $1-5 million. The RFI responses clarify requirements around work areas, security, lighting specifications, design submittals and material ordering, as-built drawings, and coordination during construction to maintain taxiway operations.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# Question Answer

Will a free zone be established in the work areas? If yes, is it to be defined with low-profile barricades? If yes, will escort to the free zone be required, and by who? If no, who will provide escort to and in the work area?

The area will be a free zone and at this time. Would like to close the area and allow the contractor to work. All personnel will have to obtain an airfield drivers license IAW Eglin AFB Instuction 13-213 v1.

2 Will the contractor be required to provide access point security? not to my knowledge but they would be required to monitor their area.

It was stated by the Airfield Manager at the site visit that elevated taxiway lights located on the inside of Taxiway G in pavement could remain elevated, and not flush mounted as stated in the RFP. Please confirm.

The flush mounted would be only on the southern side of the Taxiway G. All other should be elevated.

4 Will a FAA Form 7460-1 Notice of Proposed Construction or Alteration be required for this project? No.

Please confirm if a civil design is required. If yes will the contractor be required to conduct a geotechnical investigation for the civil design, or is there an existing geotechnical report that can be relied upon? If a geotechnical investigation is required, will a separate airfield construction permit be required for the drill rig? Note: The permit for the drill rig could cause the design POP to be overrun.)

First, civil design will be required covering the cutting and patching requirements. And second, a geotechnical investigation will not be required.

6 SOW 1.1 references attached sketches, but there are no attached sketches in the RFP documents. Please provide. This will be provided as an amendment to the solicitation.

7 Are there existing, empty, duct bank and handholes available for the contractor to cross the taxiway? Execute as stated in the SOW.

RFP states: “A Site Visit has held for the previous posted solicitation, therefore only new offeror can request a site visit.”

Our company was a previous offeror, but was not given access to the first site visit. Would it be possible for us to request access for a site visit for the re-solicitation effort?

Site Visit was extended to requesting offeror.

If a bid bond was submitted with the original proposal, does the Governemnt want a newly issued bid bond for the re-solicitation?

Yes.

Eglin Air Force Base, Florida Install New Taxiway Edge Lights TW-G

FTFA 21-CB52

RFIs 061523 Amed 0001 Page 1

10 Will the government allow the Superintendent fulfill the duties of SSHO/QCM if duly qualified for each role? Yes.

Will the government allow for use of CPARS in lieu of PPQs? CPARS are easily retrieved by the contractor, whereas PPQs tend to require more time to locate the government lead for a particular project and have them complete a review, if they are willing.

Yes.

12 Can the government provide as-builts to show existing circuits, to include wire size and conduit size? This is addressed in the SOW.

13 Can the government provide existing panel schedules for the panels feeding the existing lighting fixtures? Provide a bid based on the SOW.

14 Can the government provide existing fixture schedules? Provide a bid based on the SOW.

15 Is there a minimum/maximum distance between individual flush mounted and elevated lighting fixures? Provide a bid based on the SOW.

Will the government accept the use of LED fixtures in lieu of quartz? In our experience, airfield lighting is trending towards replacement with LEDs and quartz represent extended lead times in some cases.

Provide a bid based on the SOW.

Are there any special phasing requirements to this project or will the contractor be allowed full access to Taxiway G for the duration of the contract?

Provide a bid based on the SOW.

The SOW states that installation of home run is not a requirement for this project. Where exactly does the new circuit tie-in?

Provide a bid based on the SOW.

The SOW states that design iterations shall be 65%, 95% and 100%. Given the 90 days allotted for the design, approximately how many days does the government intend to review each design submittal and send comments?

The government will need approximately 14 days to review and return comments for each design iteration.

RFIs 061523 Amed 0001 Page 2

Will the government allow ordering of material during design phases 65% and 95%, so long as it is approved by the government via material submittal?

Yes.

21 Please confirm that as-builts of the existing Taxiway G will be delivered to the contractor via CAD. Provide a bid based on the SOW.

Paragraph (1) under Drawing Preperation states "Although Fire Supression and Fire Alarm Systems shall be added to the BIM model…" Please confirm that Building Information Modeling is not required.

Building Information Modeling is not required.

Paragraph (1) under Drawing Preperation states "Although Fire Supression and Fire Alarm Systems shall be added to the BIM model…" Please confirm that Fire Supression and Fire Alarm Systems are not a component of the design/construction for this project.

Fire Supression and Fire Alarm Systems are not a component of the design/construction for this project.

24 Will contractors be permitted to reuse the existing conduit if available?

All conductors must be new. Conduit may be reused as long as its structural integrity is proven by easily passing new conductors through it. If there are obstructions the conduit must be replaced. We are not aware of any collapsed conduit ducts in this area, but many have been untouched for well

Attachment 2, Statement of Work, Page 1 states “See the attached sketches for additional information where elevated taxiway edge lighting is required…” The sketches referenced are not availabe via the updated solicitation on SAM. Will the government be sending updated sketches for this solicitation?

This will be provided as an amendment to the solicitation.

26 Please provide a map showing location of TWY G, TWY G Hammerhead and TWY H. Provide a bid based on the SOW and sketches that were included with the SOW.

Please identify location TWY H End of Runway (EOR) shack as described in SOW 1.1 paragraph 1 and location of Building 941 as described in SOW 1.1 paragraph 4.

Provide a bid based on the SOW and sketches that were included with the SOW.

RFIs 061523 Amed 0001 Page 3

Attachment 2 SOW 1.1 first bullet under removal and repair of asphalt states "saw cut approximately two parallel 5000' x 2' cuts in proposed area of asphalt on the airfield. Please provide map/location of proposed area of saw cutting of asphalt.

Provide a bid based on the SOW and sketches that were included with the SOW.

Last paragraph of SOW 1.2 states there are no new signage or pavement markings required and under SOW 1.4 it states to design in accordance with UFC for Airfield/Heliport Planning and Markings. Please confirm that this project does not require any signage or pavement markings.

Provide a bid based on the SOW.

SOW 1.2 second paragraph states NO limitation to work hours but weekend work is preferred. This represent a significant cost difference. Please confirm either work during normal week work hours, night work or weekend work.

Provide a bid based on the SOW.

Section L states to submit past performance completed within 5 years and Section M states to submit within 3 years.

Please clarify.

Past Performance recency will be within five (5) years.

Page (2) of the Statement of Work discusses the removal and repair of aspahlt. The first bullet point states "Saw cut approximately two parallel 5,000' x 2' cuts in the proposed area of the asphalt on the airfield". When comparing to the WORK+AREA pdf from the previous soilcitation, it appears this area is for the flush mounted light fixtures. Does this mean that this section is to receive demolition of asphalt is a 5000 LF by 2 LF section and no sawcutting is anticipated for the elevated fixtures?

Provide a bid based on the SOW.

Can the government confirm if Taxiway G will remain operational during construction? If so, will the contractor be required to provide temporary lighting for the taxiway?

If temporary lighting is required, can the government provide what type of lighting they would require for taxiway operations?

35 Are both flush mounted and elevated light fixtures to be on the same circuit? Yes, both flush and elevated fixtures are on the same circuits.

36 Please confirm the location and approximate distance of the vault from the Taxiway G.

The location of the Vault is shown on one of the two sketches that were included with the SOW. And traveling by available roads, the distance between Taxiway G and the Vault is approximately 8,208 feet.

Use UFC 3-2060-01 B14-6.1.4 Marking and Lighting & B14-6.10 Marking and Lighting Closed or Hazardous Areas on Airfields as a guideline for barricades. A TCW will be used and access to and from job site will be at the gates located near King Hangar and you will need a laydown area.

Use UFC 3-2060-01 B14-6.1.4 Marking and Lighting & B14-6.10 Marking and Lighting Closed or Hazardous Areas on Airfields as a guideline for barricades. A TCW will be used and access to and from job site will be at the gates located near King Hangar and you will need a laydown area.

RFIs 061523 Amed 0001 Page 4

Please confirm the lights on the existing circuit are the only fixtures on the circuit. If not, please provide location and type of light fixtures remaining on the current circuit.

#37 - 1 TACAN, 1 Hold line. and 1 info sign (north side of Twy) & 1 Hold line sign (South side of Twy) are also on this circuit

Please confirm there is no concrete (besides the ductbanks) beneath the asphalt on Taxiway G that could represent extended demolition work to remove for this project. If concrete is existing under the taxiway, please confirm thickness.

For the records that we have on file there are no issues with PCC (Concrete) below/beneath the AC (Asphalt) areas for the direct construction path.

*One area on the North side of TWY G near structure #123 is a PCC access road that will have to be removed. Recommendation dimensions for demo 5'x10'x1'. Once backfilled, demo area DOES NOT need to be replaced with PCC but, instead with Argentine Bahia grass.