ATTACHMENT #8 - PLCB Form 54-FA-2.0 PLCB Standard Terms and Conditions - Non-Liquor.pdf
PDF 383 KB Posted
- Attached to
- PLCB REGIONAL OFFICES DOOR ACCESS CONTROL SYSTEM
- Solicitation number
- 272437
About this file
This document is the Pennsylvania Liquor Control Board (PLCB) Standard Contract Terms and Conditions for Non-Merchandise Purchase Orders (Form 54-FA-2.0), which outlines the standard terms for non-liquor related contracts with the PLCB. The contract term begins on the Effective Date after full execution and required approvals, and requires a Notice to Proceed before work can commence. The PLCB reserves the right to extend contracts for up to 3 months under the same terms and conditions.
The document establishes payment terms requiring payment within 30 days of proper invoice receipt, with the PLCB having the option to use Commonwealth purchasing cards or Automated Clearing House (ACH) payments. All contractors must submit ACH information within 10 days of contract award. The PLCB is exempt from federal excise taxes and Pennsylvania state sales tax, with some exceptions for construction contractors. The document outlines requirements for background checks, confidentiality, and Right-to-Know Law compliance for contractors accessing Commonwealth facilities or information.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pennsylvania Liquor Control Board Form 54-FA-2.0
Standard Contract Terms and Conditions for Non-Merchandise Purchase Orders
PENNSYLVANIA LIQUOR CONTROL BOARD
STANDARD CONTRACT TERMS AND CONDITIONS
FOR NON-MERCHANDISE PURCHASE ORDERS
1. TERM OF CONTRACT
The term of the Contract shall commence on the Effective Date (as defined below) and shall end on the Expiration Date identified in the Contract, subject to the other provisions of the Contract. The Effective Date shall be after the Contract has been fully executed by the Contractor and by the Commonwealth and all approvals required by Commonwealth contracting procedures have been obtained. The Contract shall not be a legally binding contract until after Contractor is issued a Notice to Proceed directing the Contractor to start performance on a date which is on or after the Effective Date. The Contractor shall not start the performance of any work prior to the date set forth in the Notice to Proceed and the Board shall not be liable to pay the Contractor for any service or work performed or expenses incurred before the date set forth in the Notice to Proceed. No agency employee has the authority to verbally direct the commencement of any work under this
Contract.
2. EXTENSION OF CONTRACT TERM
The PLCB reserves the right, upon notice to the Contractor, to extend the term of the
Contract for up to 3 months upon the same terms and conditions.
3. DEFINITIONS
As used in this Contract, these words shall have the following meanings:
a. Agency: The Pennsylvania Liquor Control Board (“PLCB”).
b. Contracting Officer: The person authorized to administer this Contract for the
PLCB and to make written determinations with respect to the Contract.
c. Days: Unless specifically indicated otherwise, days mean calendar days.
d. Developed Works or Developed Materials: All documents, sketches, drawings, designs, works, papers, files, reports, computer programs, computer documentation, data, records, software, samples or any other tangible material without limitation authored or prepared by Contractor as the work product covered in the scope of work for the Project.
e. Documentation: All materials required to support and convey information about the services required by this Contract. It includes, but is not necessarily restricted to, written reports and analyses, diagrams, maps, logical and physical designs, system designs, computer programs, flow charts, disks, and/or other machine-readable storage media.
f. Services: All Contractor activity necessary to satisfy the Contract.
4. INDEPENDENT PRIME CONTRACTOR
In performing its obligations under the Contract, the Contractor will act as an independent contractor and not as an employee or agent of the Commonwealth. The Contractor will be responsible for all services in this Contract whether or not Contractor provides them directly. Further, the Contractor is the sole point of contact with regard to all contractual matters, including payment of any and all charges resulting from the Contract.
5. DELIVERY
a. Supplies Delivery: All item(s) shall be delivered F.O.B. Destination. The
Contractor agrees to bear the risk of loss, injury, or destruction of the item(s) ordered prior to receipt of the items by the PLCB. Such loss, injury, or destruction shall not release the Contractor from any contractual obligations. Except as otherwise provided in this contract, all item(s) must be delivered within the time period specified. Time is of the essence and, in addition to any other remedies, the Contract is subject to termination for failure to deliver as specified. Unless otherwise stated in this Contract, delivery must be made within 30 days after the
Effective Date.
b. Delivery of Services: The Contractor shall proceed with all due diligence in the performance of the services with qualified personnel, in accordance with the completion criteria set forth in the Contract.
6. ESTIMATED QUANTITIES
It shall be understood and agreed that any quantities listed in the Contract are estimated only and may be increased or decreased in accordance with the actual requirements of the PLCB and that the PLCB in accepting any bid or portion thereof, contracts only and agrees to purchase only the materials and services in such quantities as represent the actual requirements of the PLCB. The PLCB reserves the right to purchase materials and services covered under the Contract through a separate competitive procurement procedure, whenever the PLCB deems it to be in its best interest.
7. WARRANTY
The Contractor warrants that all items furnished and all services performed by the
Contractor, its agents and subcontractors shall be free and clear of any defects in workmanship or materials. Unless otherwise stated in the Contract, all items are warranted for a period of one year following delivery by the Contractor and acceptance by the PLCB. The Contractor shall repair, replace or otherwise correct any problem with the delivered item. When an item is replaced, it shall be replaced with an item of equivalent or superior quality without any additional cost to the PLCB.
8. PATENT, COPYRIGHT, AND TRADEMARK INDEMNITY
The Contractor warrants that it is the sole owner or author of, or has entered into a suitable legal agreement concerning either: a) the design of any product or process provided or used in the performance of the Contract which is covered by a patent, copyright, or trademark registration or other right duly authorized by state or federal law or b) any copyrighted matter in any report document or other material provided to the PLCB under the contract. The Contractor shall defend any suit or proceeding brought against the PLCB on account of any alleged patent, copyright or trademark infringement in the United States of any of the products provided or used in the performance of the Contract. This is upon condition that the PLCB shall provide prompt notification in writing of such suit or proceeding; full right, authorization and opportunity to conduct the defense thereof; and full information and all reasonable cooperation for the defense of same.
As principles of governmental or public law are involved, the PLCB may participate in or choose to conduct, in its sole discretion, the defense of any such action. If information and assistance are furnished by the PLCB at the Contractor’s written request, it shall be at the
Contractor’s expense, but the responsibility for such expense shall be only that within the
Contractor’s written authorization.
The Contractor shall indemnify and hold the PLCB harmless from all damages, costs, and expenses, including attorney’s fees that the Contractor or the PLCB may pay or incur by reason of any infringement or violation of the rights occurring to any holder of copyright, trademark, or patent interests and rights in any products provided or used in the performance of the Contract. If any of the products provided by the Contractor in such suit or proceeding are held to constitute infringement and the use is enjoined, the Contractor shall, at its own expense and at its option, either procure the right to continue use of such infringement products, replace them with noninfringement equal performance products or modify them so that they are no longer infringing.
If the Contractor is unable to do any of the preceding, the Contractor agrees to remove all the equipment or software which are obtained contemporaneously with the infringing product, or, at the option of the PLCB, only those items of equipment or software which are held to be infringing, and to pay the PLCB: 1) any amounts paid by the PLCB towards the purchase of the product, less straight line depreciation; 2) any license fee paid by the
PLCB for the use of any software, less an amount for the period of usage; and 3) the pro rata portion of any maintenance fee representing the time remaining in any period of maintenance paid for. The obligations of the Contractor under this paragraph continue without time limit. No costs or expenses shall be incurred for the account of the Contractor without its written consent.
9. OWNERSHIP RIGHTS
The PLCB shall have unrestricted authority to reproduce, distribute, and use any submitted report, data, or material, and any software or modifications and any associated documentation that is designed or developed and delivered to the PLCB as part of the performance of the Contract.
10. ACCEPTANCE
No item(s) received by the PLCB shall be deemed accepted until the PLCB has had a reasonable opportunity to inspect the item(s). Any item(s) which is discovered to be defective or fails to conform to the specifications may be rejected upon initial inspection or at any later time if the defects contained in the item(s) or the noncompliance with the specifications were not reasonably ascertainable upon the initial inspection. It shall thereupon become the duty of the Contractor to remove rejected item(s) from the premises without expense to the PLCB within 15 days after notification.
Rejected item(s) left longer than 15 days will be regarded as abandoned, and the PLCB shall have the right to dispose of them as its own property and shall retain that portion of the proceeds of any sale which represents the PLCB’s costs and expenses in regard to the storage and sale of the item(s). Upon notice of rejection, the Contractor shall immediately replace all such rejected item(s) with others conforming to the specifications and which are not defective. If the Contractor fails, neglects or refuses to do so, the PLCB shall then have the right to procure a corresponding quantity of such item(s), and deduct from any monies due or that may thereafter become due to the Contractor, the difference between the price stated in the Contract and the cost thereof to the PLCB.
11. PRODUCT CONFORMANCE
The PLCB reserves the right to require any and all Contractors to:
a. Provide certified data from laboratory testing performed by the Contractor, or performed by an independent laboratory, as specified by the PLCB.
b. Supply published manufacturer product documentation.
c. Permit a PLCB representative to witness testing at the Contractor's location or at an independent laboratory.
d. Complete a survey/questionnaire relating to the bid requirements and specifications.
e. Provide customer references.
f. Provide a product demonstration at a location near Harrisburg or the using agency location.
12. REJECTED MATERIAL NOT CONSIDERED ABANDONED
The PLCB shall have the right to not regard any rejected material as abandoned and to demand that the Contractor remove the rejected material from the premises within thirty
(30) days of notification. The Contractor shall be responsible for removal of the rejected material as well as proper clean-up. If the Contractor fails or refuses to remove the rejected material as demanded by the PLCB, the PLCB may seek payment from, or set-off from any payments due to the Contractor under this or any other Contract with the
PLCB, the costs of removal and clean-up. This is in addition to all other rights to recover costs incurred by the PLCB.
13. COMPLIANCE WITH LAW
The Contractor shall comply with all applicable federal and state laws and regulations and local ordinances in the performance of the Contract.
14. ENVIRONMENTAL PROVISIONS
In the performance of the Contract, the Contractor shall minimize pollution and shall strictly comply with all applicable environmental laws and regulations, including, but not limited to, the Clean Streams Law Act of June 22, 1937 (P.L. 1987, No. 394), as amended 35 P.S. § 691.601 et seq.; the Pennsylvania Solid Waste Management Act, Act of July 7, 1980 (P.L. 380, No. 97), as amended, 35 P.S. § 6018.101 et seq.; and the Dam Safety and Encroachment Act, Act of November 26, 1978 (P.L. 1375, No. 325), as amended, 32 P.S. § 693.1.
15. POST-CONSUMER RECYCLED CONTENT
a. Except as specifically waived by the Department of General Services in writing, any products which are provided to the PLCB as a part of the performance of the Contract must meet the minimum percentage levels for total recycled content as specified on the Department of General Services website at www.dgs.pa.gov on the date of submission of the bid, proposal or contract offer.
b. Recycled Content Enforcement: The Contractor may be required, after delivery of the Contract item(s), to provide the PLCB with documentary evidence that the item(s) was in fact produced with the required minimum percentage of post-consumer and recovered material content.
16. COMPENSATION
a. Compensation for Supplies: The Contractor shall be required to furnish the awarded item(s) at the price(s) quoted in the Contract. All item(s) shall be delivered within the time period(s) specified in the Contract. The Contractor shall be compensated only for item(s) that are delivered and accepted by the PLCB.
b. Compensation for Services: The Contractor shall be required to perform the specified services at the price(s) quoted in the Contract. All services shall be performed within the time period(s) specified in the Contract. The Contractor shall be compensated only for work performed to the satisfaction of the PLCB. The Contractor shall not be allowed or paid travel or per diem expenses except as specifically set forth in the Contract.
17. BILLING REQUIREMENTS
Unless the Contractor has been authorized by the PLCB for Evaluated Receipt Settlement or Vendor Self-Invoicing, the Contractor shall include in all of its invoices the following minimum information:
file:///C:/Users/Strineer/AppData/Local/Microsoft/Windows/Temporary%20Internet%20Files/Content.Outlook/0QL9ZUYW/www.dgs.state.pa.us
a. Vendor name and "Remit to" address, including Oracle Vendor number;
b. Bank routing information, if ACH;
c. Oracle Purchase Order number;
d. Ship To Address, including name of PLCB location;
e. Description of the supplies/services delivered in accordance with Oracle Purchase
Order (include purchase order line number if possible);
f. Quantity provided;
g. Unit price;
h. Price extension;
i. Total price; and
j. Delivery date of supplies or services.
If an invoice does not contain the minimum information set forth in this paragraph, the
PLCB may return the invoice as improper. If the PLCB returns an invoice as improper, the time for processing a payment will be suspended until the PLCB receives a correct invoice.
The Contractor may not receive payment until the PLCB has received a correct invoice.
Contractors are required to establish separate billing accounts with each using agency and invoice them directly. Each invoice shall be itemized with adequate detail and match the line item on the Purchase Order. In no instance shall any payment be made for services to the Contractor that are not in accordance with the prices on the Purchase
Order, the Contract, updated price lists or any discounts negotiated by the purchasing agency.
18. PAYMENT
a. The PLCB shall put forth reasonable efforts to make payment by the required payment date. The required payment date is: (a) the date on which payment is due under the terms of the Contract; (b) 30 days after a proper invoice actually is received at the “Bill To” address if a date on which payment is due is not specified in the Contract (a “proper” invoice is not received until the PLCB accepts the service as satisfactorily performed); or (c) the payment date specified on the invoice if later than the dates established by (a) and (b) above.
Payment may be delayed if the payment amount on an invoice is not based upon the price(s) as stated in the Contract. If any payment is not made within 15 days after the required payment date, the PLCB may pay interest as determined by the
Secretary of Budget in accordance with Act No. 266 of 1982 and regulations promulgated pursuant thereto.
Payment should not be construed by the Contractor as acceptance of the service performed by the Contractor. The PLCB reserves the right to conduct further testing and inspection after payment, but within a reasonable time after performance, and to reject the service if such post payment testing or inspection discloses a defect or a failure to meet specifications. The Contractor agrees that the PLCB may set off the amount of any state tax liability or other obligation of the
Contractor or its subsidiaries to the PLCB against any payments due the Contractor under any contract with the PLCB.
b. The PLCB shall have the option of using the Commonwealth purchasing card to make purchases under the Contract or Purchase Order. The Commonwealth’s purchasing card is similar to a credit card in that there will be a small fee which the
Contractor will be required to pay and the Contractor will receive payment directly from the card issuer rather than the PLCB. Any and all fees related to this type of payment are the responsibility of the Contractor. In no case will the PLCB allow increases in prices to offset credit card fees paid by the Contractor or any other charges incurred by the Contractor, unless specifically stated in the terms of the
Contract or Purchase Order.
c. The PLCB will make contract payments through Automated Clearing House (ACH).
1) Within 10 days of award of the contract or purchase order, the contractor must submit or must have already submitted their ACH information within their user profile in the PLCB’s procurement system (Oracle).
2) The contractor must submit a unique invoice number with each invoice submitted. The unique invoice number will be listed on the PLCB’s ACH remittance advice to enable the contractor to properly apply the state agency’s payment to the invoice submitted.
3) It is the responsibility of the contractor to ensure that the ACH information contained in Oracle is accurate and complete. Failure to maintain accurate and complete information may result in delays in payments.
19. TAXES
The PLCB is exempt from all excise taxes imposed by the Internal Revenue Service and has accordingly registered with the Internal Revenue Service to make tax free purchases under Registration No. 23740001-K. With the exception of purchases of the following items, no exemption certificates are required and none will be issued: undyed diesel fuel, tires, trucks, gas guzzler emergency vehicles, and sports fishing equipment.
The PLCB is also exempt from Pennsylvania state sales tax, local sales tax, public transportation assistance taxes and fees and vehicle rental tax. The Department of
Revenue regulations provide that exemption certificates are not required for sales made to governmental entities and none will be issued. Nothing in this paragraph is meant to exempt a construction contractor from the payment of any of these taxes or fees which are required to be paid with respect to the purchase, use, rental, or lease of tangible personal property or taxable services used or transferred in connection with the performance of a construction contract.
20. ASSIGNMENT OF ANTITRUST CLAIMS
The Contractor and the PLCB recognize that in actual economic practice, overcharges by the Contractor’s suppliers resulting from violations of state or federal antitrust laws are in fact borne by the PLCB. As part of the consideration for the award of the Contract, and intending to be legally bound, the Contractor assigns to the PLCB all right, title and interest in and to any claims the Contractor now has, or may acquire, under state or federal antitrust laws relating to the products and services which are the subject of this Contract.
21. HOLD HARMLESS PROVISION
a. The Contractor shall hold the PLCB harmless from and indemnify the PLCB against any and all third-party claims, demands and actions based upon or arising out of any activities performed by the Contractor and its employees and agents under this
Contract, provided the PLCB gives Contractor prompt notice of any such claim of which it learns. Pursuant to the Commonwealth Attorneys Act (71 P.S. Section
732-101, et seq.), the Office of Attorney General (OAG) has the sole authority to represent the Commonwealth in actions brought against the Commonwealth. The
OAG may, however, in its sole discretion and under such terms as it deems appropriate, delegate its right of defense. If OAG delegates the defense to the
Contractor, the Commonwealth will cooperate with all reasonable requests of
Contractor made in the defense of such suits.
b. Notwithstanding the above, neither party shall enter into any settlement without the other party's written consent, which shall not be unreasonably withheld. The PLCB may, in its sole discretion, allow the Contractor to control the defense and any related settlement negotiations.
22. AUDIT PROVISIONS
The PLCB shall have the right, at reasonable times and at a site designated by the PLCB, to audit the books, documents and records of the Contractor to the extent that the books, documents and records relate to costs or pricing data for the Contract. The Contractor agrees to maintain records which will support the prices charged and costs incurred for the Contract. The Contractor shall preserve books, documents, and records that relate to costs or pricing data for the Contract for a period of 3 years from date of final payment.
The Contractor shall give full and free access to all records to the PLCB and/or their authorized representatives.
23. DEFAULT
a. The PLCB may, subject to the Force Majeure provisions of this Contract, and in addition to its other rights under the Contract, declare the Contractor in default by written notice thereof to the Contractor, and terminate (as provided in the
Termination Provisions of this Contract) the whole or any part of this Contract or any Purchase Order for any of the following reasons:
1) Failure to begin work within the time specified in the Contract or Purchase
Order or as otherwise specified;
2) Failure to perform the work with sufficient labor, equipment, or material to insure the completion of the specified work in accordance with the Contract or Purchase Order terms;
3) Unsatisfactory performance of the work;
4) Failure to deliver the awarded item(s) within the time specified in the
Contract or Purchase Order or as otherwise specified;
5) Improper delivery;
6) Failure to provide an item(s) which is in conformance with the specifications referenced in the Contract or Purchase Order;
7) Delivery of a defective item;
8) Failure or refusal to remove material, or remove and replace any work rejected as defective or unsatisfactory;
9) Discontinuance of work without approval;
10) Failure to resume work, which has been discontinued, within a reasonable time after notice to do so;
11) Insolvency or bankruptcy;
12) Assignment made for the benefit of creditors;
13) Failure or refusal within 10 days after written notice by the Contracting
Officer, to make payment or show cause why payment should not be made, of any amounts due for materials furnished, labor supplied or performed, for equipment rentals, or for utility services rendered;
14) Failure to protect, to repair, or to make good any damage or injury to property;
15) Breach of any provision of the Contract;
16) Failure to comply with representations made in the Contractor's bid/proposal; or
17) Failure to comply with applicable industry standards, customs, and practice.
b. In the event that the PLCB terminates this Contract or any Purchase Order in whole or in part as provided in Subparagraph a. above, the PLCB may procure, upon such terms and in such manner as it determines, items similar or identical to those so terminated, and the Contractor shall be liable to the PLCB for any reasonable excess costs for such similar or identical items included within the terminated part of the Contract or Purchase Order.
c. If the Contract or a Purchase Order is terminated as provided in Subparagraph a.
above, the PLCB, in addition to any other rights provided in this paragraph, may require the Contractor to transfer title and deliver immediately to the PLCB in the manner and to the extent directed by the Contracting Officer, such partially completed items, including, where applicable, reports, working papers and other documentation, as the Contractor has specifically produced or specifically acquired for the performance of such part of the Contract or Purchase Order as has been terminated.
Except as provided below, payment for completed work accepted by the PLCB shall be at the Contract price. Except as provided below, payment for partially completed items including, where applicable, reports and working papers, delivered to and accepted by the PLCB shall be in an amount agreed upon by the
Contractor and Contracting Officer. The PLCB may withhold from amounts otherwise due the Contractor for such completed or partially completed works, such sum as the Contracting Officer determines to be necessary to protect the
PLCB against loss.
d. The rights and remedies of the PLCB provided in this paragraph shall not be exclusive and are in addition to any other rights and remedies provided by law or under this Contract.
e. The PLCB's failure to exercise any rights or remedies provided in this paragraph shall not be construed to be a waiver by the PLCB of its rights and remedies in regard to the event of default or any succeeding event of default.
f. Following exhaustion of the Contractor's administrative remedies as set forth in the
Contract Controversies Provision of the Contract, the Contractor's exclusive remedy shall be to seek damages in the Board of Claims.
24. FORCE MAJEURE
Neither party will incur any liability to the other if its performance of any obligation under this Contract is prevented or delayed by causes beyond its control and without the fault or negligence of either party. Causes beyond a party’s control may include, but aren’t limited to, acts of God or war, changes in controlling law, regulations, orders or the requirements of any governmental entity, severe weather conditions, civil disorders, natural disasters, fire, epidemics and quarantines, general strikes throughout the trade, and freight embargoes.
The Contractor shall notify the PLCB orally within 5 days and in writing within 10 days of the date on which the Contractor becomes aware, or should have reasonably become aware, that such cause would prevent or delay its performance. Such notification shall (i) describe fully such cause(s) and its effect on performance, (ii) state whether performance under the contract is prevented or delayed and (iii) if performance is delayed, state a reasonable estimate of the duration of the delay. The Contractor shall have the burden of proving that such cause(s) delayed or prevented its performance despite its diligent efforts to perform and shall produce such supporting documentation as the PLCB may reasonably request. After receipt of such notification, the PLCB may elect to cancel the Contract, cancel the Purchase Order, or to extend the time for performance as reasonably necessary to compensate for the Contractor’s delay.
In the event of a declared emergency by competent governmental authorities, the PLCB by notice to the Contractor, may suspend all or a portion of the Contract or Purchase
Order.
25. TERMINATION PROVISIONS
The PLCB has the right to terminate this Contract or any Purchase Order for any of the following reasons. Termination shall be effective upon written notice to the Contractor.
a. TERMINATION FOR CONVENIENCE: The PLCB shall have the right to terminate the Contract or a Purchase Order for its convenience if the PLCB determines termination to be in its best interest. The Contractor shall be paid for work satisfactorily completed prior to the effective date of the termination, but in no event shall the Contractor be entitled to recover loss of profits.
b. NON-APPROPRIATION: The PLCB’s obligation to make payments during any
Commonwealth fiscal year succeeding the current fiscal year shall be subject to availability and appropriation of funds. When funds (state and/or federal) are not appropriated or otherwise made available to support continuation of performance in a subsequent fiscal year period, the PLCB shall have the right to terminate the
Contract or a Purchase Order. The Contractor shall be reimbursed for the reasonable value of any nonrecurring costs incurred but not amortized in the price of the supplies or services delivered under the Contract. Such reimbursement shall not include loss of profit, loss of use of money, or administrative or overhead costs.
The reimbursement amount may be paid from any appropriations available for that purpose
c. TERMINATION FOR CAUSE: The PLCB shall have the right to terminate the
Contract or a Purchase Order for Contractor default under the Default Clause upon written notice to the Contractor. The PLCB shall also have the right, upon written notice to the Contractor, to terminate the Contract or a Purchase Order for other cause as specified in the Contract or by law. If it is later determined that the PLCB erred in terminating the Contract or a Purchase Order for cause, then, at the
PLCB’s discretion, the Contract or Purchase Order shall be deemed to have been terminated for convenience under Subparagraph a.
26. CONTRACT CONTROVERSIES
a. In the event of a controversy or claim arising from the Contract, the Contractor must, within six months after the cause of action accrues, file a written claim with the contracting officer for a determination. The claim shall state all grounds upon which the Contractor asserts a controversy exists. If the Contractor fails to file a claim or files an untimely claim, the Contractor is deemed to have waived its right to assert a claim in any forum. At the time the claim is filed, or within 60 days thereafter, either party may request mediation through the Commonwealth Office of General Counsel Dispute Resolution Program.
b. If the Contractor or the contracting officer requests mediation and the other party agrees, the contracting officer shall promptly make arrangements for mediation.
Mediation shall be scheduled so as to not delay the issuance of the final determination beyond the required 120 days after receipt of the claim if mediation is unsuccessful. If mediation is not agreed to or if resolution is not reached through mediation, the contracting officer shall review timely-filed claims and issue a final determination, in writing, regarding the claim. The final determination shall be issued within 120 days of the receipt of the claim, unless extended by consent of the contracting officer and the Contractor. The contracting officer shall send his/her written determination to the Contractor. If the contracting officer fails to issue a final determination within the 120 days (unless extended by consent of the parties), the claim shall be deemed denied. The contracting officer's determination shall be the final order of the purchasing agency.
c. Within 15 days of the mailing date of the determination denying a claim or within
135 days of filing a claim if, no extension is agreed to by the parties, whichever occurs first, the Contractor may file a statement of claim with the Commonwealth
Board of Claims. Pending a final judicial resolution of a controversy or claim, the
Contractor shall proceed diligently with the performance of the Contract in a manner consistent with the determination of the contracting officer and the PLCB shall compensate the Contractor pursuant to the terms of the Contract.
27. ASSIGNABILITY AND SUBCONTRACTING
a. Subject to the terms and conditions of this Paragraph, this Contract shall be binding upon the parties and their respective successors and assigns.
b. The Contractor shall not subcontract with any person or entity to perform all or any part of the work to be performed under this Contract without the prior written consent of the Contracting Officer, which consent may be withheld at the sole and absolute discretion of the Contracting Officer.
c. The Contractor may not assign, in whole or in part, this Contract or its rights, duties, obligations, or responsibilities hereunder without the prior written consent of the
Contracting Officer, which consent may be withheld at the sole and absolute discretion of the Contracting Officer.
d. Notwithstanding the foregoing, the Contractor may, without the consent of the
Contracting Officer, assign its rights to payment to be received under the Contract, provided that the Contractor provides written notice of such assignment to the
Contracting Officer together with a written acknowledgement from the assignee that any such payments are subject to all of the terms and conditions of this
Contract.
e. For the purposes of this Contract, the term “assign” shall include, but shall not be limited to, the sale, gift, assignment, pledge, or other transfer of any ownership interest in the Contractor provided, however, that the term shall not apply to the sale or other transfer of stock of a publicly traded company.
f. Any assignment consented to by the Contracting Officer shall be evidenced by a written assignment agreement executed by the Contractor and its assignee in which the assignee agrees to be legally bound by all of the terms and conditions of the Contract and to assume the duties, obligations, and responsibilities being assigned.
g. A change of name by the Contractor, following which the Contractor’s federal identification number remains unchanged, shall not be considered to be an assignment hereunder. The Contractor shall give the Contracting Officer written notice of any such change of name.
28. OTHER CONTRACTORS
The PLCB may undertake or award other contracts for additional or related work, and the
Contractor shall fully cooperate with other contractors and PLCB employees, and coordinate its work with such additional work as may be required. The Contractor shall not commit or permit any act that will interfere with the performance of work by any other contractor or by PLCB employees. This paragraph shall be included in the Contracts of all contractors with which this Contractor will be required to cooperate. The PLCB shall equitably enforce this paragraph as to all contractors to prevent the imposition of unreasonable burdens on any contractor.
29. NONDISCRIMINATION/SEXUAL HARASSMENT CLAUSE
The Contractor agrees:
a. In the hiring of any employee(s) for the manufacture of supplies, performance of work, or any other activity required under the contract or any subcontract, the
Contractor, each subcontractor, or any person acting on behalf of the Contractor or subcontractor shall not discriminate by reason of race, gender, creed, color, sexual orientation, gender identity or expression, or in violation of the Pennsylvania
Human Relations Act (PHRA) and applicable federal laws, against any citizen of this Commonwealth who is qualified and available to perform the work to which the employment relates.
b. Neither the Contractor nor any subcontractor nor any person on their behalf shall in any manner discriminate by reason of race, gender, creed, color, sexual orientation, gender identity or expression, or in violation of the PHRA and applicable federal laws, against or intimidate any employee involved in the manufacture of supplies, the performance of work, or any other activity required under the contract.
c. The Contractor and each subcontractor shall establish and maintain a written nondiscrimination and sexual harassment policy and shall inform their employees in writing of the policy. The policy must contain a provision that sexual harassment will not be tolerated and employees who practice it will be disciplined. Posting this
Nondiscrimination/Sexual Harassment Clause conspicuously in easily-accessible and well-lighted places customarily frequented by employees and at or near where the contracted services are performed shall satisfy this requirement for employees with an established work site.
d. The Contractor and each subcontractor shall not discriminate by reason of race, gender, creed, color, sexual orientation, gender identity or expression, or in violation of PHRA and applicable federal laws, against any subcontractor or supplier who is qualified to perform the work to which the contract relates.
e. The Contractor and each subcontractor represents that it is presently in compliance with and will maintain compliance with all applicable federal, state, and local laws, regulations and policies relating to nondiscrimination and sexual harassment. The Contractor and each subcontractor further represents that it has filed a Standard Form 100 Employer Information Report (“EEO-1”) with the U.S.
Equal Employment Opportunity Commission (“EEOC”) and shall file an annual
EEO-1 report with the EEOC as required for employers’ subject to Title VII of the
Civil Rights Act of 1964, as amended, that have 100 or more employees and employers that have federal government contracts or first-tier subcontracts and have 50 or more employees. The Contractor and each subcontractor shall, upon request and within the time periods requested by the Commonwealth, furnish all necessary employment documents and records, including EEO-1 reports, and permit access to their books, records, and accounts by the contracting agency and the Bureau of Diversity, Inclusion and Small Business Opportunities for purpose of ascertaining compliance with provisions of this Nondiscrimination/Sexual
Harassment Clause.
f. The Contractor shall include the provisions of this Nondiscrimination/Sexual
Harassment Clause in every subcontract so that those provisions applicable to subcontractors will be binding upon each subcontractor.
g. The Contractor’s and each subcontractor’s obligations pursuant to these provisions are ongoing from and after the effective date of the contract through the termination date thereof. Accordingly, the Contractor and each subcontractor shall have an obligation to inform the Commonwealth if, at any time during the term of the contract, it becomes aware of any actions or occurrences that would result in violation of these provisions.
h. The Commonwealth may cancel or terminate the contract and all money due or to become due under the contract may be forfeited for a violation of the terms and conditions of this Nondiscrimination/Sexual Harassment Clause. In addition, the agency may proceed with debarment or suspension and may place the Contractor in the Contractor Responsibility File.
30. CONTRACTOR INTEGRITY PROVISIONS
It is essential that those who seek to contract with the Commonwealth of Pennsylvania
(“Commonwealth”) observe high standards of honesty and integrity. They must conduct themselves in a manner that fosters public confidence in the integrity of the
Commonwealth contracting and procurement process.
DEFINITIONS. For purposes of these Contractor Integrity Provisions, the following terms shall have the meanings found in this Section:
a. “Affiliate” means two or more entities where (a) a parent entity owns more than 50% of the voting stock of each of the entities; or (b) a common shareholder or group of shareholders owns more than 50% of the voting stock of each of the entities; or (c) the entities have a common proprietor or general partner.
b. “Consent” means written permission signed by a duly authorized officer or employee of the Commonwealth, provided that where the material facts have been disclosed, in writing, by prequalification, bid, proposal, or contractual terms, the Commonwealth shall be deemed to have consented by virtue of the execution of this contract.
c. “Contractor” means the individual or entity, that has entered into this contract with the Commonwealth.
d. “Contractor Related Parties” means any affiliates of the Contractor and the
Contractor’s executive officers, Pennsylvania officers and directors, or owners of 5% or more interest in the Contractor.
e. “Financial Interest” means either:
(1) Ownership of more than a 5% interest in any business; or
(2) Holding a position as an officer, director, trustee, partner, employee, or holding any position of management.
f. “Gratuity” means tendering, giving, or providing anything of more than nominal monetary value including, but not limited to, cash, travel, entertainment, gifts, meals, lodging, loans, subscriptions, advances, deposits of money, services, employment, or contracts of any kind. The exceptions set forth in the Governor’s Code of Conduct, Executive Order 1980-18, the 4 Pa. Code §7.153(b), shall apply.
g. “Non-bid Basis” means a contract awarded or executed by the Commonwealth with
Contractor without seeking bids or proposals from any other potential bidder or offeror.
http://www.portal.state.pa.us/portal/server.pt/gateway/PTARGS_0_2_785_708_0_43/http;/pubcontent.state.pa.us/publishedcontent/publish/global/files/executive_orders/1980___1989/1980_18.pdf http://www.portal.state.pa.us/portal/server.pt/gateway/PTARGS_0_2_785_708_0_43/http;/pubcontent.state.pa.us/publishedcontent/publish/global/files/executive_orders/1980___1989/1980_18.pdf http://www.portal.state.pa.us/portal/server.pt/gateway/PTARGS_0_2_785_708_0_43/http;/pubcontent.state.pa.us/publishedcontent/publish/global/files/executive_orders/1980___1989/1980_18.pdf http://www.portal.state.pa.us/portal/server.pt/gateway/PTARGS_0_2_785_708_0_43/http;/pubcontent.state.pa.us/publishedcontent/publish/global/files/executive_orders/1980___1989/1980_18.pdf
2. In furtherance of this policy, Contractor agrees to the following:
a. Contractor shall maintain the highest standards of honesty and integrity during the performance of this contract and shall take no action in violation of state or federal laws or regulations or any other applicable laws or regulations, or other requirements applicable to Contractor or that govern contracting or procurement with the
Commonwealth.
b. Contractor shall establish and implement a written business integrity policy, which includes, at a minimum, the requirements of these provisions as they relate to the
Contractor activity with the Commonwealth and Commonwealth employees and which is made known to all Contractor employees. Posting these Contractor Integrity
Provisions conspicuously in easily-accessible and well-lighted places customarily frequented by employees and at or near where the contract services are performed shall satisfy this requirement.
c. Contractor, its affiliates, agents, employees and anyone in privity with Contractor shall not accept, agree to give, offer, confer, or agree to confer or promise to confer, directly or indirectly, any gratuity or pecuniary benefit to any person, or to influence or attempt to influence any person in violation of any federal or state law, regulation, executive order of the Governor of Pennsylvania, statement of policy, management directive or any other published standard of the Commonwealth in connection with performance of work under this contract, except as provided in this contract.
d. Contractor shall not have a financial interest in any other contractor, subcontractor, or supplier providing services, labor, or material under this contract, unless the financial interest is disclosed to the Commonwealth in writing and the Commonwealth consents to Contractor’s financial interest prior to Commonwealth execution of the contract.
Contractor shall disclose the financial interest to the Commonwealth at the time of bid or proposal submission, or if no bids or proposals are solicited, no later than
Contractor’s submission of the contract signed by Contractor.
e. Contractor certifies to the best of its knowledge and belief that within the last 5 years
Contractor or Contractor Related Parties have not:
(1) been indicted or convicted of a crime involving moral turpitude or business honesty or integrity in any jurisdiction;
(2) been suspended, debarred or otherwise disqualified from entering into any contract with any governmental agency;
(3) had any business license or professional license suspended or revoked;
(4) had any sanction or finding of fact imposed as a result of a judicial or administrative proceeding related to fraud, extortion, bribery, bid rigging, embezzlement, misrepresentation or anti-trust; and
(5) been, and is not currently, the subject of a criminal investigation by any federal, state or local prosecuting or investigative agency and/or civil anti-trust investigation by any federal, state or local prosecuting or investigative agency.
If Contractor cannot so certify to the above, then it must submit along with its bid, proposal or contract a written explanation of why such certification cannot be made and the
Commonwealth will determine whether a contract may be entered into with the Contractor.
The Contractor’s obligation pursuant to this certification is ongoing from and after the effective date of the contract through the termination date thereof. Accordingly, the
Contractor shall have an obligation to immediately notify the Commonwealth in writing if at any time during the term of the contract if becomes aware of any event which would cause the Contractor’s certification or explanation to change. Contractor acknowledges that the Commonwealth may, in its sole discretion, terminate the contract for cause if it learns that any of the certifications made herein are currently false due to intervening factual circumstances or were false or should have been known to be false when entering into the contract.
f. Contractor shall comply with the requirements of the Lobbying Disclosure Act (65
Pa.C.S. §13A01 et seq.) regardless of the method of award. If this contract was awarded on a Non-bid Basis, Contractor must also comply with the requirements of the Section 1641 of the Pennsylvania Election Code (25 P.S. §3260a).
g. When Contractor has reason to believe that any breach of ethical standards as set forth in law, the Governor’s Code of Conduct, or these Contractor Integrity
Provisions has occurred or may occur, including but not limited to contact by a
Commonwealth officer or employee which, if acted upon, would violate such ethical standards, Contractor shall immediately notify the Commonwealth contracting officer or the Office of the State Inspector General in writing.
h. Contractor, by submission of its bid or proposal and/or execution of this contract and by the submission of any bills, invoices or requests for payment pursuant to the contract, certifies and represents that it has not violated any of these Contractor
Integrity Provisions in connection with the submission of the bid or proposal, during any contract negotiations or during the term of the contract, to include any extensions thereof. Contractor shall immediately notify the Commonwealth in writing of any actions for occurrences that would result in a violation of these
Contractor Integrity Provisions. Contractor agrees to reimburse the
Commonwealth for the reasonable costs of investigation incurred by the Office of the State Inspector General for investigations of the Contractor’s compliance with the terms of this or any other agreement between the Contractor and the
Commonwealth that results in the suspension or debarment of the Contractor.
Contractor shall not be responsible for investigative costs for investigations that do not result in the Contractor’s suspension or debarment.
i. Contractor shall cooperate with the Office of the State Inspector General in its investigation of any alleged Commonwealth agency or employee breach of ethical standards and any alleged Contractor non-compliance with these Contractor
Integrity Provisions. Contractor agrees to make identified Contractor employees available for interviews at reasonable times and places. Contractor, upon the inquiry or request of an Inspector General, shall provide, or if appropriate, make promptly available for inspection or copying, any information of any type or form deemed relevant by the Office of the State Inspector General to Contractor's integrity and compliance with these provisions. Such information may include, but shall not be limited to, Contractor's business or financial records, documents or files of any type or form that refer to or concern this contract. Contractor shall incorporate this paragraph in any agreement, contract or subcontract it enters into in the course of the performance of this contract/agreement solely for the purpose of obtaining subcontractor compliance with this provision. The incorporation of this provision in a subcontract shall not create privity of contract between the
Commonwealth and any such subcontractor, and no third-party beneficiaries shall be created thereby.
j. For violation of any of these Contractor Integrity Provisions, the Commonwealth may terminate this and any other contract with Contractor, claim liquidated damages in an amount equal to the value of anything received in breach of these
Provisions, claim damages for all additional costs and expenses incurred in obtaining another contractor to complete performance under this contract, and debar and suspend Contractor from doing business with the Commonwealth.
These rights and remedies are cumulative, and the use or non-use of any one shall not preclude the use of all or any other. These rights and remedies are in addition to those the Commonwealth may have under law, statute, regulation, or otherwise.
31. CONTRACTOR RESPONSIBILITY PROVISIONS
For the purpose of these provisions, the term contractor is defined as any person, including, but not limited to, a bidder, offeror, loan recipient, grantee or lessor, who has furnished or performed or seeks to furnish or perform, goods, supplies, services, leased space, construction or other activity, under a contract, grant, lease, purchase order or reimbursement agreement with the Commonwealth. The term contractor includes a permittee, licensee, or any agency, political subdivision, instrumentality, public authority, or other public entity in the Commonwealth.
a. The Contractor certifies, in writing, for itself and its subcontractors required to be disclosed or approved by the Commonwealth, that as of the date of its execution of this Bid/Contract, that neither the Contractor, nor any such subcontractors, are under suspension or debarment by the Commonwealth or any governmental entity, instrumentality, or authority and, if…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .