Attachment 8 Pay Terms Bid Schedule - IAF-23-0000 20221212.docx

DOCX document 40 KB Posted

Attached to
Lome Emergency Operations Center, Togo
Solicitation number
W912GB23R0023
Issued by

About this file

This document contains a solicitation for design and construction services for a National Emergency Operations Center in Lome, Togo. The U.S. Army Corps of Engineers, Europe District is seeking proposals for a design-build project that includes designing and constructing a new one-story building, mechanical ventilation with cooling, and one new generator shelter. Interested offerors must attend an optional pre-proposal site visit scheduled for January 19, 2023 and submit both price and non-price proposals by the deadline specified in the solicitation. Proposals must follow the instructions in the solicitation and any amendments. Offerors must be registered in the System for Award Management to be eligible for award. The project location is in Lome, Togo, and the solicitation includes design criteria for offerors to consider when developing their proposals.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

12 December 2022

PART 1 GENERAL

PAYMENT TYPES

SINGLE JOB PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.

The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

If there is any work required of this contract that is not associated with a base bid item description or bid option description, then the costs for that work shall be included proportionally spread across the base bid items.

SCHEDULE OF ITEMS: BASE ITEMS

Base Item 0001: Design and Construct New One-Story Building

Unit of Measure: Job.

Payment will be made for costs associated with the demolishing and disposing of the existing building 30 for the Lomé Emergency Operations Center as indicated in the SECTION 01 10 10 Statement of Work, and shown on the concept plan Statement of Work attachments, with the exception of option items listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

SCHEDULE OF ITEMS: OPTION ITEMS

Option Item 0002: Design and Construct Mechanical Ventilation with Cooling

Unit of Measure: Job.

Payment will be made for additional costs associated with the design and construction of a Mechanical Ventilation System with cooling in the Lomé Emergency Operations Center as indicated in the SECTION 01 10 10 Statement of Work paragraphs 6.4.1.2 and 6.4.3. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

Option Item 0003: Design and Construct One Generator Shelter

Unit of Measure: Job.

Payment will be made for additional costs associated with the design and construction of one generator shelter in the Lomé Emergency Operations Center as indicated in the SECTION 01 10 10 Statement of Work, and shown on the concept plan Statement of Work attachments. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 22 00 Page 1 Offerors shall provide pricing for all base and option items.

The following items include providing all labor, materials, equipment, and services necessary to complete the design and construction of the work identified in the attached Plans, Specifications, Scope of Work (SOW), Solicitation/Request for Proposal. It also includes preparation of all documents, submittals, and schedules; inspections; and compliance with all technical, quality control, administrative, and safety requirements. All work shall be performed in accordance with these documents. Refer to Specification Section 01 22 00 Price and Payment Procedures for additional description of the work associated with each of the items.

Period of Performance: Refer to clause COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10) in the Solicitation/Request for Proposal for the period of performance for all base and option items.

Liquidated Damages: Refer to clause LIQUIDATED DAMAGES-CONSTRUCTION (52.211-12) in the Solicitation/Request for Proposal for the liquidated damages for all base and option items.

Option Items: The Government reserves the right to award the options up to 90 calendar days after contract award.

Item No.
Description
Qty
Unit
Unit Price
Amount

BASE ITEMS

0001
Design and Construct New One-Story Building
1
Job
$
$
Total of Base Items 0001-0002
$

OPTION ITEMS

0002
Design and Construct Mechanical Ventilation with Cooling
1
Job
$
$
0003
Design and Construct One New Generator Shelter
1
Job
$
$
Total of Option Items 0002-0003
$
Total of all Base and Option Items
$

EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

-- END OF PROPOSAL SCHEDULE -

File details come from the government source that posted it. Updated .