SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
HJZH 20-5249
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
PREFERENCE, TYPE OF SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
D R
A W
IN
G
S
PL
A
N
M
SD
S
M A
N F'
R R
EC
O
M M
EN
D
A
TI
O N
S
R
EQ
U
ES
T
LE
TT
ER
C A
TA
LO
G D
A
TA
R
EP
O R
TS
O
TH
ER
D
A
TA
TE
ST
R
ES
U
LT
S
REQUIRED
SUBMISSION DATE
DATE RECEIVED IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN SUSPENSE
DATE FOLLOW-UP
DATE CONTRACTOR
NOTIFIED
CONTRACTOR RE-
SUBMITTAL FINAL APPROVAL REMARKS
Notice of Start of Work
1 10 days prior to start of any work
Quality Control Plan
20 Days after NTP
HAZMAT Approval, General Specs 01500, para. 5.1.3 and 5.1.5.
NLT 10 working days prior to material being brought onto installation.
4 HAZMAT Usage Report, General Specs 01500, para. 5.1.3 and 5.1.5.
NLT 7 working days after Final Acceptance.
Project Schedule
10 Days after NTP
Material Safety Data Sheet
2 30 days before brought on Base
7 Paint Chips/Color Selection 1 1 10 Days after NTP
Epoxy Data Sheet showing ACI 548.12 is met. 1 10 Days prior to use
Manufacturer's Epoxy injection Instructions 1 1 10 Days prior to use
Mortar Data Sheet showing ACI
548.12 is met. 1 1 10 Days prior to use
Manufacturer's Epoxy Mortar Instructions 1 1 10 Days prior to use
Expansion Joint Sealant manufacturer’s information 1 1 10 Days prior to use
13 Expansion Joint Sealant Instructions 1 1 10 Days prior to use
EARTHQUAKE REPAIR, BLDG 2
SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
HJZH 20-5249
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
PREFERENCE, TYPE OF SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
D R
A W
IN
G
S
PL
A
N
M
SD
S
M A
N F'
R R
EC
O
M M
EN
D
A
TI
O N
S
R
EQ
U
ES
T
LE
TT
ER
C A
TA
LO
G D
A
TA
R
EP
O R
TS
O
TH
ER
D
A
TA
TE
ST
R
ES
U
LT
S
REQUIRED
SUBMISSION DATE
DATE RECEIVED IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN SUSPENSE
DATE FOLLOW-UP
DATE CONTRACTOR
NOTIFIED
CONTRACTOR RE-
SUBMITTAL FINAL APPROVAL REMARKS
Notice of Start of Work
1 10 days prior to start of any work
Quality Control Plan
20 Days after NTP
HAZMAT Approval, General Specs 01500, para. 5.1.3 and 5.1.5.
NLT 10 working days prior to material being brought onto installation.
4 HAZMAT Usage Report, General Specs 01500, para. 5.1.3 and 5.1.5.
NLT 7 working days after Final Acceptance.
Project Schedule
10 Days after NTP
Material Safety Data Sheet
2 30 days before brought on Base
7 Paint Chips/Color Selection 1 1 10 Days after NTP
Epoxy Data Sheet showing ACI 548.12 is met. 1 10 Days prior to use
Manufacturer's Epoxy injection Instructions 1 1 10 Days prior to use
Mortar Data Sheet showing ACI
548.12 is met. 1 1 10 Days prior to use
Manufacturer's Epoxy Mortar Instructions 1 1 10 Days prior to use
Expansion Joint Sealant manufacturer’s information 1 1 10 Days prior to use
13 Expansion Joint Sealant Instructions 1 1 10 Days prior to use
EARTHQUAKE REPAIR, BLDG 602
| AF66 BLDG 2 |
| AF66 BLDG 602 |