Attachment 8 537-21-702 - SOW Exhibit D - Construction Project Tracker.xlsx

XLSX spreadsheet 70 KB Posted

Attached to
Z1DA--537-21-700 - DDPO Installation Data Drops and Power Outlet (DDPO) Installation. (VA-23-00007105)
Solicitation number
36C25222B0037
Issued by

About this file

This document contains a construction project tracker spreadsheet and related details for Federal Contract Opportunity 36C25222B0037. The construction project tracker provides planning details for renovation work at the Jesse Brown VA Medical Center in Chicago, Illinois, including a kick-off meeting date of December 16, 2021, seven construction tasks with planned and actual start and completion dates ranging from December 2021 to July 2023, and construction period of performance charts, meeting minutes, request for information logs, submittal logs, punchlists, daily reports, and payment records. The related opportunity is a solicitation from the Department of Veterans Affairs for Project 537-21-702 to install data drops and power outlets at the same medical center.

View the file

Other files

File Type Posted
S04 - Pre-Bid Sign-in Sheet 537-21-702 Dec-6-2022.pdf PDF
36C25222B0037 0003.docx DOCX document
Attachment 15 - 30 X 42 Large CAD Drawings.pdf PDF
Attachment 14 - 537-21-702 Exhiibit J - EHRM Stations and Mounts-Humanscale V6 Wall Stations Specifications.pdf PDF
36C25222B0037 0002.docx DOCX document
Attachment 13 - 537-21-702 Exhibit I - Humanscale-v6-wallstation-instructions.pdf PDF
Attachment 12 - 537-21-702 Exhibit H - EHRM DDPO - List of EUDs.pdf PDF
36C25222B0037 0001.docx DOCX document
S02 - 36C25222B0037 Wage Determination as of 10.07.2022.pdf PDF
Attachment 11 537-21-702 - SOW Exhibit G - Construction Safety Procedure.pdf PDF
Attachment 7 537-21-702 - SOW Exhibit C - VA Form 10-6001a Contract Progress Report.pdf PDF
Attachment 4 537-21-702 - Drawings_CAD_00_Phasing.pdf PDF
Attachment 9 537-21-702 - SOW Exhibit E - VA Form 10101 CONTRACTOR PRODUCTION REPORT.pdf PDF
Attachment 3 537-21-702 EHRM-DDPO Installation Specs Vol 2.pdf PDF
Attachment 5 537-21-702 - SOW Exhibit A - Asbestos Sampling Report.pdf PDF
Attachment 6 537-21-702 - SOW Exhibit B - Project Risk Assessment Form.pdf PDF
Attachment 1 537-21-702 EHRM - DDPO Installation SOW.pdf PDF
Attachment 10 537-21-702 - SOW Exhibit F - Subcontractor Payment Summary Form.xlsx XLSX spreadsheet
Attachment 2 537-21-702 EHRM-DDPO Installation Specs Vol 1.pdf PDF
36C25222B0037.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MTG ATTENDANCE

Department of Veterans Affairs
537-21-702 EHRM DDPO
Jesse Brown VAMC
Key P = Present, A = Absent
ATTENDEEPROGRESS MEETING DATE
NAMEPROJECT ROLExx/xx/xxxx/xx/xxxx/xx/xxxx/xx/xxxx/xx/xx
CO
CS
COR
Eng. Supervisor

POP

Department of Veterans Affairs
537-21-702 EHRM DDPO
Jesse Brown VAMC
Chicago, Illinois
NTP Date:12/16/21
CONSTRUCTION PERIOD OF PERFORMANCE CHART (IN CALENDAR DAYS AFTER NTP)
Level CompleteCalendar Days for the WorkPlanned DateActual DateVA ReviewPlanned DateRevised DateTotal days after NTP
Task 1 - Project Kick-off & Coordination Submittals712/23/21412/27/211/4/0011
Task 2 - Pre-Construction Submittals, Infection Control Permit & Material Procurement - Swing Space, Chemical Analyzer Site Preparation, and MEP71/3/2271/10/221/7/0025
Task 3 - Mobilization and Performance of Work
Swing Space for Temporary Relocation of Hematology Equipment and Work Station211/31/2272/7/221/7/0053
Chemical Analyzer Site Preparation212/28/2243/4/221/4/0078
Task 4 - Existing Utilities and Infection Control Coordination Submittals Blood Lab Renovation304/3/22144/17/221/14/00122
Task 5 - Pre-Construction Submittals & Material Procurement Blood Lab Renovation215/8/22145/22/221/14/00157
Task 6 - Mobilization and Performance of Work Blood Lab Renovation3655/22/2375/29/231/7/00529
Task 7 - Closeout Submittals216/19/23427/31/232/11/00592

MTG MINUTES

Department of Veterans Affairs
537-21-702 EHRM DDPO
Jesse Brown VAMC
Chicago, Illinois
Meeting Date:12/16/21% Complete:
General Contractor:Completion Date:7/31/23
Prepared by:Days Remaining in Contract:592

ID Date Description Responsible Party Due Date Status

RFI LOG

Department of Veterans Affairs
537-21-702 EHRM DDPO
Jesse Brown VAMC
Chicago, Illinois
REQUEST FOR INFORMATION LOG
REQUEST FOR INFORMATIONVA RESPONSE
RFI #ISSUE DATERESOLUTION ON THE FOLLOWINGNEED REPLY BY DATEDATEBYREQUEST FOR INFORMATION RESPONSEVA DAYS TO REPLY

SUBMITTAL LOG

Department of Veterans Affairs
537-21-702 EHRM DDPO
Jesse Brown VAMC
Chicago, Illinois
SUBMITTAL LOG
REQUEST FOR SUBMITTAL REVIEWDESIGNER OF RECORD RESPONSEVA ACCEPTANCE / RESOLUTIONTIME ANALYTICS
IDISSUE DATESUMBITTAL BY SECTION OF WORKNEED REPLY BY DATEREPLY DATEREPLY FROMAE RECOMMENDATIONDATEREVIEW BYVA ACTIONDAYS TO REVIEWDAYS TO RESUBMITSUBMITTAL STATUS

PUNCHLIST

Department of Veterans Affairs
537-21-702 EHRM DDPO
Jesse Brown VAMC
Chicago, Illinois
CONSTRUCTION PUNCHLIST
IDDATEDESCRIPTIONLOCATIONDIVISIONCONTRACTOR ACTION TAKENVA RESPONSECOMPLETION DATE

DAILY LOGS

Department of Veterans Affairs
537-21-702 EHRM DDPO
Jesse Brown VAMC

DAILY REPORT LOG

DAILY REPORT # REPORT DATE SUBMITTAL DATE SUMMARY OF WORK PERFORMED (INCLUDE ROOM NUMBERS)

PAYMENT LOG

Department of Veterans Affairs
537-21-702 EHRM DDPO
Jesse Brown VAMC
PENCIL COPY REVIEWIPPS PAYMENT HISTORY
PAY APP #SUBMITTAL DATEAMOUNTCOR APPROVAL DATESPDLNInvoice NumberAmountCheck NumberCheck Date
CONTRACT MODIFICATIONSCONTRACT AMOUNT
NumberAmountDatePO Number
P00001Original P.O. Amount
P00002Contract Modifications$0.00
P00003Current PO Amount$0.00
P00004Payments Issued$0.00
P00005Outstanding PO Amount$0.00
P00006
P00007
TOTAL$0.00-