This is a Justification for Qualification Requirements document establishing pre-contract award qualification standards for the Receiver, Protector Microwave (NSN 5895-01-515-8924, P/N 588R499H01), used in the F-16 C/D AN/APG-68 Radar MLPRF system. The qualification requirement is justified based on criticality to mission capability, complexity of manufacturing processes requiring close tolerance matching and special surface finish/assembly/sealing procedures, and the need to verify structural and functional integrity. The engineering support activity 416 SCMS/GUEAA requires source approval to maintain part quality; failure to procure from a qualified source could result in structural or functional deficiencies that degrade F-16 mission capability and potentially cause loss of aircraft or crew. The estimated cost for potential offerors to achieve qualification is $2,000, with an estimated completion timeframe of 90 days.

Offerors must satisfy comprehensive pre-contract award qualification requirements including: notification of intent to qualify; certification of required facilities and testing/inspection capabilities; verification of a complete data package including Northrop Grumman drawing 588R499H01; manufacturing and process verification demonstrating compliance with ESA-approved technical data and DFARS Unique Identification requirements; submission of an approved qualification test plan and complete test report; and provision of a pre-contract award qualification article for form, fit, and function evaluation. Offerors will receive notification of qualification article approval or rejection within 30 days of submission. The document establishes that offerors may not be denied consideration if they can demonstrate or meet qualification standards before the contract award date, though the award will not be delayed to accommodate qualification completion. Seven source qualification waiver criteria are available for sources meeting specific conditions, including prior government or OEM supply, qualified assembly suppliers, sources qualified for earlier dash numbers of the same part number, suppliers of similar items, and previously qualified sources that have undergone corporate changes.

View the file

Other files

File Type Posted
Attachment_4_Item_Description.pdf PDF
Attachment_3_EDR.pdf PDF
Attachment_9_DD_254.pdf PDF
Attachment_6_IUID_Checklist.pdf PDF
Attachment_5_Packaging_SOW.pdf PDF
Attachment_2_EDL.pdf PDF
Attachment_8_CDRLs.pdf PDF
Attachment_1_Packaging_Requirements.pdf PDF
FA821226R0004.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUSTIFICATION FOR QUALIFICATION REQUIREMENTS

FAR 9.202(a) Policy and DoD 4120.24-M Defense Standardization Program, Policy and Procedures

10-Dec-25 Section A & Section B & Section D

AMSC: B (DFARS PGI 217.7506, DoD Spare Parts Breakout Program)

SECTION A: ITEM IDENTIFICATION

1. National Stock Number (NSN): 5895-01-515-8924

2. Part Number (P/N): 588R499H01

3. Noun: Receiver, Protector Microwave

4. Application: F-16 C/D AN/APG-68 Radar MLPRF

SECTION B:

1. JUSTIFICATION FOR ESTABLISHING A QUALIFICATION REQUIREMENT

a. Criticality: Production of this Receiver, Protector Microwave requires engineering source approval by the engineering support activity 416 SCMS/GUEAA in order to maintain the quality of the part. Failure to procure this Receiver, Protector Microwave from a fully qualified source can result in structural or functional deficiencies that will degrade the mission capability of the F-16 C/D AN/APG-68 Radar MLPRF and could cause loss of aircraft and/or crew.

b. Complexity, Manufacturing Processes, and/or Material Considerations: Inadequate control of characteristics associated with machining and processing of this Receiver, Protector Microwave can result in product structural or durability degradation. Close tolerance matching of components is required. Special care and attention is required for surface finish, assembly, and sealing of this Receiver, Protector Microwave to assure compliance with specified acceptance test requirements.

c. Form, Fit, Function, and Interface: The qualification requirements specified herein are necessary to verify the structural and/or functional integrity and/or fit, form, and interface of the Receiver, Protector Microwave being procured.

2. REASON WHY QUALIFICATION REQUIREMENT MUST BE DEMONSTRATED PRIOR TO ANY CONTRACT

AWARD

a. Completion of the specified pre-contract award qualification requirements are necessary to assure the government that the offeror is capable of producing the Receiver, Protector Microwave in compliance with the applicable technical specification/data within the schedule and economic constraints of our contracts. There are significant technical and schedule risks which can only be minimized by a completion of the requirements prior to contract award.

b. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified: $2000

c. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 90 days. This is based on complexity of the Receiver, Protector Microwave and other factors.

SECTION D: SIGNATURES

JUSTIFICATION FOR QUALIFICATION REQUIREMENTS

FAR 9.202(a) Policy and DoD 4120.24-M Defense Standardization Program, Policy and Procedures

10-Dec-25 Section A & Section B & Section D

X Chief of Contracting Office (COCO)

X 416 SCMS/GUEAA Lead Engineer Engineer Support Activity (ESA)

X 416 SCMS/GUEAA Engineer Engineer Support Activity (ESA)

MANUFACTURING QUALIFICATION REQUIREMENTS

NSN: 5895-01-515-8924

P/N: 588R499H01 Noun: Receiver, Protector Microwave Application: F-16 C/D AN/APG-68 Radar MLPRF

10-Dec-25 Supporting Information

Qualification Requirement Cost Estimate Estimate the likely cost for testing and evaluation which will be incurred by the potential offeror to become qualified. This is a requirement of FAR 9.202(a)(1)(ii) and 10USC2319(b)(3) (The following categories may not apply in all cases. The product engineer should identify the costs applicable to the project and indicate N/A on all sections that do not apply.)

Total cost is $2,000.00 Section A. Shipping, if required, use DD Form 1654, Evaluation of Transportation Cost Factors to develop the information. Refer any questions to the Procurement Contracting Officer for cost estimation.

Section B. Dimensional/Electronic Verification. Contact the science/engineering laboratory to obtain cost estimates (bids) for tests such as:

$ 0.00

a. Chemical

b. Metallurgical $ 0.00

(1) Destructive

(2) Non-Destructive

c. Dimensional

d. Electronic

e. Mechanical

f. Non-Destructive Inspection Section C. Nuclear Hardness [This includes cost of shock, vibration, and Electro-Magnetic Pulse (EMP)]. Contact Systems Engineering Integration and Test Division for hourly rate.

Section D. Form, Fit, Function and Interface. Contact your organizational Production Management Specialist (PMS) to obtain information on the same or similar item where work has been accomplished in the past using AFMC Form 206, Temporary Work Request.

Section E. Original Equipment Manufacturer (OEM) Qualification Testing (If required) $ 0.00

a. Laboratory Costs (Costs are directly dependent on the type of testing to be accomplished and the location and duration of the testing. For example, landing gear laboratory testing is normally accomplished on a dynamometer and costs vary from $25,000 to $500,000 depending on the depth of testing. Aircraft and missile testing will vary as the requirement dictates and the cost will have to be identified by the source of testing).

b. Flight/Data Reduction & Analysis Costs.

Section F. Travel by Contractor to Test Site (if required) $ 0.00

a. Lodging

b. Per Diem

c. Rental Cars

d. Incidentals (Verified) Section G. SAR Package Development/Evaluation Cost: A potential new source’s development of a Source Approval (SAR) package may cost as much as:

In addition, the cost incurred for Government evaluation of their SAR may be as much as:

Evaluation cost may be borne by the government if it is in the best interest of the Government to qualify alternate sources.

P/N: 588R499H01

10-Dec-25 Supporting Information

FAR 9.202(a) Policy as amended by DFARS 209.270-4(a)(2) Procedures (Aviation CSI)

10 Dec 2025 B 5895-01-515-8924 588R499H01 Receiver, Protector Microwave F-16 C/D AN/APG-68 Radar MLPRF

416 SCMS/GUEAA

$2000 (cost estimate) 90 (time completion estimate)

P/N: 588R499H01

10-Dec-25 Section C 1/3

SECTION C:

1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE

a. Prequalification Notice/Sources Sought: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this Receiver, Protector Microwave.

b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to manufacture, inspect, test, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.

c. Data Verification: The offeror must verify that he has a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession including, at a minimum Northrop Grumman (97942) drawing 588R499H01. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.

d. Manufacture/Process Verification: The offeror must manufacture this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 416 SCMS/GUEAA. The offeror shall also identify its sources for materials and its standards for internally used processes.

e. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to 416 SCMS/GUEAA for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 588R499H01 paragraph

4. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the occurrence of any testing that will be used as a basis for qualification. The offeror’s facilities shall be made available for government inspection during these tests.

f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract award qualification article for evaluation by the government. This article must comply with all

P/N: 588R499H01

10-Dec-25 Section C 2/3 of the requirements of Drawing 588R499H01. This article shall be subjected to a form, fit, and function evaluation to demonstrate compatibility with the weapon system and to evaluate the manufacturing capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification testing within 30 days of submitting a product for qualification testing. Note that successful completion of the qualification testing does not guarantee any contract award. If the offeror is deemed qualified and awarded the contract, a post-contract award first article exhibit may be required to verify production capability.

g. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified: $2000.

h. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 90 days. This is based on complexity of the Receiver, Protector Microwave and other factors.

i. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.

j. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved source for this item. Approval, however, does not guarantee subsequent contract award.

P/N: 588R499H01

10-Dec-25 Section C 3/3

2. SOURCE QUALIFICATION WAIVER REQUIREMENTS

Sources who meet any of the following source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:

a. QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).

b. QWC2: NA

c. QWC3: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.

d. QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.

e. QWC5: A source qualified to provide a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.

f. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the manufacturing process.

g. QWC7: NA

2025-12-10T09:36:12-0700
LEFEVRE.STEVEN.R.1231476250
2025-12-10T10:22:49-0700
GITTINS.TAYLOR.K.1390466664
2025-12-17T11:04:07-0700
STARK.DAVID.J.1254575271

File details come from the government source that posted it. Updated .