This Quality Assurance Surveillance Plan (QASP) is for Underground Storage Tanks (UST) and Above Ground Storage Tanks (AST) inspection services for the VA Connecticut Healthcare System's West Haven and Newington Campuses. The document outlines the government's method for monitoring and evaluating contractor performance across four key performance standards: successful performance of inspection/calibration/testing, timely deliverable submission, deliverable compliance, and customer satisfaction.
The QASP establishes specific acceptable quality levels, including 95% timely performance for inspections and service completion, 100% compliance with regulatory requirements, and 95% timely resolution of issues. The Contracting Officer's Representative (COR) will conduct monthly inspections and quarterly performance assessment meetings. Performance will be rated on a three-tier scale (Exceeds Standards, Meets Standards, Does Not Meet Standards), with potential consequences for substandard performance including documentation in the Contractor Performance Assessment Reporting System (CPARS) and potential non-exercise of contract options.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
For: Underground Storage Tanks (UST) and Above Ground Storage Tanks (AST) Services
Contract Number: < Upon award, Government will enter contract number>
Contract Description: VA Connecticut Healthcare System West Haven and Newington Campuses require inspection, calibration and testing services for Underground Storage Tanks (UST) and Above Ground Storage Tanks (AST) (a.k.a. Bulk Storage) and all associated system components (e.g., Piping, Day tanks, Automatic Tank Gauging (ATG) systems, overfill protection, spill prevention) to comply with local, state and federal UST and AST regulatory requirements.
Contractor’s name: <Enter your company name.> (hereafter referred to as the contractor).
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored.
• How monitoring will take place.
• Who will conduct the monitoring.
• How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis.
However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: <Upon award, Government will enter name.> Organization or Agency: Department of Veterans Affairs, Network Contracting Office 1 (NCO 1)
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall ensure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: <Upon award, Government will enter name.>
c. Other Key Government Personnel - <Upon award, Government will enter name, if applicable. This may include Performance Monitors, Clinical Quality experts, etc. who act on behalf of the COR to monitor performance.>
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager - <Enter name.>
b. Other Contractor Personnel - <Enter name(s) or delete these lines if not applicable> Title: <Enter title(s) or delete these lines if not applicable.>
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The performance standards are outlined in paragraph 9 in the Statement of Work (SOW). The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
Objective Standard Method of Surveillance
Acceptable Quality Level
Successful Performance of Inspection, Calibration, Testing and Training.
Service completed in accordance with the proposed/accepted Schedule
Inspection by the COR Timely performance 95% of the time.
Deliverables (Submission)
The contractor submits timely deliverables in accordance with the SOW.
Monthly Inspection by the COR
Timely submission 95% of the time.
Deliverables (Compliance)
The contractor submits deliverables compliant with regulatory authorities outlined in the SOW.
Monthly Inspection by the COR
Submissions are compliant 100% of the time.
Customer Satisfaction Timely resolution of issues that may arise during the contract
Monthly Inspection by the COR
95% Timely Resolution of issues that may arise under the contract
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)
All performance standards will be subject to periodic inspection.
6. INCENTIVES
In the event of performance below acceptable standards, the Government may not exercise options and will document performance in the Contractor Performance Assessment Reporting System (CPARS).
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. The following rating scale shall be used to determine positive, neutral, or negative outcomes from contractor outputs:
1. Exceeds Standards
2. Meets Standards
3. Does Not Meet Standards.
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR) and present it to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor quarterly to assess performance and shall provide a written assessment.
<After award, both the contractor’s Program Manager and the COR shall sign this document.>
Signature – Contractor Program Manager
Signature – Contracting Officer’s Representative
| Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP. |
| All performance standards will be subject to periodic inspection. |
| In the event of performance below acceptable standards, the Government may not exercise options and will document performance in the Contractor Performance Assessment Reporting System (CPARS). |
File details come from the government source that posted it. Updated .