Attachment 7 PPQ.pdf

PDF 223 KB Posted

Attached to
JBER Mini-MACC
Solicitation number
FA500023R0003
Issued by

View the file

Other files

File Type Posted
Attachment 3f Wage Determination AK20230001 14 Apr 2023.pdf PDF
Solicitation Amendment FA500023R00030002 SF 30.pdf PDF
Attachment 11 Site Visit Sign-In Sheet.pdf PDF
Attachment 10 Questions and Answers.pdf PDF
Solicitation Amendment FA500023R00030001 SF 30.pdf PDF
Attachment 12 Seed Project Photos.pdf PDF
Attachment 1g Mini-MACC SOW Dig Permit Fillable Template 673 ABW Form 3 20200423.pdf PDF
Attachment 1 Mini-MACC SOW 30 Mar 2023.pdf PDF
Attachment 1g2 Mini-MACC SOW Dig Permit Custom Map Richardson.pdf PDF
Attachment 1h Mini-MACC SOW JBER Telecom Criteria Requirements 11 Feb 2021.pdf PDF
Attachment 9 Teaming Consent.pdf PDF
Attachment 3f Wage Determination AK20230001 27 Jan 2023.pdf PDF
Attachment 1a Mini-MACC SOW JBER Richardson IFS Vol 2 14 Feb 2019.pdf PDF
Attachment 1g1 Mini-MACC SOW Dig Permit Custom Map Elmendorf.pdf PDF
Attachment 1f Mini-MACC SOW Contractors Fire Safety Guide Rev 14 14 Sep 2017.pdf PDF
Attachment 3e LBP and ACM Tests Seed Project.pdf PDF
Attachment 1k Mini-MACC SOW AF IMT 3064 Progress Schedule.pdf PDF
Attachment 1l Mini-MACC SOWAF IMT 3065 Progress Report.pdf PDF
Attachment 1j Mini-MACC SOW AF IMT 3000 Submittal.pdf PDF
Attachment 3b Supplemental Specs Seed Project.pdf PDF
Attachment 1c Mini-MACC SOW JBER Hazardous Waste Management Plan 7 May 2020.pdf PDF
Attachment 8 Past Performance Supplement Worksheet.xlsx XLSX spreadsheet
Attachment 3c Drawings Seed Project.pdf PDF
Attachment 1i Mini-MACC SOW JBER Environmental Protection and Solid Waste Management Specs 9 Jun 22.pdf PDF
Solicitation - FA500023R0003.pdf PDF
Attachment 4 Price Schedule.pdf PDF
Attachment 6 PPCL.pdf PDF
Attachment 1d Mini-MACC SOW Environmental Precon Checklist Sep 2019.pdf PDF
Attachment 3 Seed Project Cover Sheet.pdf PDF
Attachment 1e Mini-MACC SOW JBER CAD GIS Record Drawing As Built Standard Dec 2019.pdf PDF
Attachment 3d AF 66 Seed Project.pdf PDF
Attachment 5 Financial Data Form.pdf PDF
Attachment 1b Mini-MACC SOW JBER Elmendorf IFS Vol 1 31 Jan 2019.pdf PDF
Attachment 2 NAF Standard Clauses 20230310.pdf PDF
Attachment 3a SOW Seed Project.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Initials

ATTACHMENT 7

PAST PERFORMANCE QUESTIONNAIRE

INSTRUCTION PAGE

Please complete the following questionnaire concerning evaluation of the Contractor’s past performance. Your response to this evaluation will be utilized for the procurement of a construction firm to provide all supervision, labor, materials and equipment necessary under a Mini-Multiple Award Construction Contract, Indefinite Delivery/Indefinite Quantity (ID/IQ) contract vehicle for construction services located primarily at Joint Base Elmendorf-Richardson (JBER) AFB, AK.

Increased emphasis in our procurements is placed on past performance as a source selection factor. Your complete response is critical as this will be relied on by the Government in the selection of a firm for the proposed construction project. Please answer all questions by checking only one (1) response per question. It is strongly requested that additional information is placed in the space provided.

You will be required to sign this evaluation at the end of the questionnaire and your initials are required on each page of this questionnaire, as well as on this instruction page.

Government personnel may contact you concerning responses made by you in this questionnaire.

If you have any questions and/or concerns, please send them to 673d Contracting Squadron, Mr. John Jeffrey, Contracting Officer at john.jeffrey.1@us.af.mil and Ms.

Katrina Peace, Contract Specialist at katrina.peace.1@us.af.mil.

NOTICE: WHEN COMPLETED, THIS QUESTIONNAIRE WILL BE CONSIDERED

SENSITIVE AND SHALL NOT BE RELEASED TO THE OFFEROR.

The completed Present/Past Performance Questionnaire(s), applicable Consent Letter(s), and Client Authorization Letter(s) shall be emailed to: john.jeffrey.1@us.af.mil and katrina.peace.1@us.af.mil.

NOTE: ELECTRONIC SUBMISSION IS REQUIRED.

mailto:1@us.af.mil mailto:john.jeffrey.1@us.af.mil mailto:katrina.peace.1@us.af.mil

Name of Contractor being evaluated: ____________________________________________________

Owner/ Organization Name: ________________________________________________________________ Evaluator Name: ___________________________________________________________________________ Address: __________________________________________________________________________________ Telephone Number: _________________________________________________________________________

Name of Project (and Contract Number, if applicable):

Has the project been accepted as complete by the customer: Yes No Date of project completion: __________________________

Project Location: _____________________________________________________________________________ Is this project located above the 60th Parallel: Yes No Description of Project: (Use Additional Sheets if Necessary): _____________________________________________

Award/Project Amount:

Original: $ _____ Final: $ _______

Occupations required to complete the project work, please place an “X”

Painters Fire Sprinkler/Alarm Carpenters Roofers Plumbers Sheet Metal Workers

HVAC Hazardous Material Removal Workers Electricians

Construction Equipment Operators Minimal Design

Would you award a contract to this firm again for similar work? Yes No

PAST PERFORMANCE QUESTIONNAIRE

For each of the questions appearing on the attached sheets, please place an “X” next to the statement which best represents your evaluation in response to the subject questions. Please add any comments which will add value to your marked response.

A: Timely Performance

1. Did the contractor complete the project on schedule?

Contractor completed project significantly ahead of scheduled completion date Contractor completed project by original scheduled completion date Contractor completed within agreed to extended completion date Contractor failed to meet project completion date.

Comments: ___________________________________________________________

2. How responsive was the contractor in addressing unforeseen/unanticipated conditions?

Contractor consistently exercised a pro-active approach.

Contractor demonstrated some initiative in exercising a pro-active approach.

Contractor rarely demonstrated a pro-active approach.

Contractor never demonstrated a pro-active approach.

3. Were the contractor submittals delivered on time?

Contractor consistently made submissions ahead of schedule.

Contractor made some submissions ahead of schedule and all others on time.

Contractor made majority of submissions on time.

Contractor submissions were usually behind schedule.

B: Effectiveness of Management

1. How well did the contractor maintain a good relationship with the owner and the owner’s technical advisors/representatives?

Contractor was always cooperative.

Contractor was usually cooperative.

Contractor was sometimes cooperative.

Contractor was not cooperative.

Comments: ______________________________________________________________

2. How effective was the contractor's on-site management team?

Contractor's team was always effective.

Contractor's team was usually effective.

Contractor's team was sometimes effective.

Contractor's team was ineffective.

3. Did the contractor maintain a consistent project team throughout the duration of the project?

No adjustments were made to the project team throughout the project.

Minor adjustments were made to the project team during the project.

Significant changes to the project team were made during the project.

Contractor maintained no consistency in key personnel during the project.

Comments: ______________________________________________________________________________

4. Did the contractor adequately staff the project?

Contractor’s team was always adequately staffed.

Contractor’s team was usually adequately staffed.

Contractor’s team was sometimes adequately staffed.

Contractor’s team was never adequately staffed.

Comments: ________________________________________________________________________

E: Regulatory Compliance

1. Did the contractor comply with all Federal, State, and local environmental regulations?

Contractor always complied with all regulations.

Contractor usually complied with all regulations.

Contractor sometimes complied with all regulations Contractor consistently failed to comply with all regulations.

Comments: ____________________________________________________________

2. Did the contractor responsibly dispose of all Contractor generated hazardous waste?

Contractor always disposed of all generated hazardous waste.

Contractor usually disposed of all generated hazardous waste.

Contractor did not dispose of generated hazardous waste Contractor was not responsible for disposing of hazardous waste.

Comments: ____________________________________________________________

3. Did the contractor carry a satisfactory safety plan for your project?

Contractor set up a satisfactory safety plan specific to the requirements.

Contractor adapted a generic safety plan that met project needs.

Contractor has a generic safety plan used on every project; no adaptations.

Contractor’s safety plan was ineffective for my project.

Comments: _____________________________________________________________

A: Quality Control

1. How well did the contractor comply with contract requirements?

Contractor always exceeded contract requirements.

Contractor usually exceeded contract requirements.

Contractor met the minimum requirements.

Contractor did not meet the minimum requirements.

Comments: ___________________________________________________________

2. Was the contractor responsive in completing punch list items?

Contractor completed punch list items after initial notification.

Contractor completed most punch list items after initial notification.

Contractor eventually completed all punch list items.

Some punch list items were never completed by contractor.

Comments: ___________________________________________________________

3. Did the contractor have a program to monitor quality?

Contractor has an established, comprehensive program with individuals employed specifically for quality control.

Contractor set up a satisfactory quality control program to comply with the requirements for the project.

Contractor’s quality control program was ineffective on the project.

Comments: ____________________________________________________________

4. Did the contractor meet the quality of work on the project?

Contractor exceeded the quality expectations.

Contractor met quality expectations.

Contractor performed marginal quality of work.

Contractor performed poor quality of work.

Comments: ____________________________________________________________

Overall Quality Assessment:

Please select one (1) overall quality rating for this project. This evaluation should be an overall rating based upon all elements of performance including quality control, timely performance, effectiveness of management, and regulatory compliance of the project. Please rate as appropriate, using the following ratings and their definitions:

Exceptional: Performance meets contractual requirements and exceeds many to the customers benefit. The performance being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.

Very Good: Performance meets contractual requirements and exceeds some to the customers benefit. The contractual performance being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

Satisfactory: Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the Contractor appear, or were, satisfactory.

Marginal: Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor's proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains a serious problem(s) for which the Contractor's corrective actions appear or were ineffective.

Exceptional Very Good Satisfactory Marginal Unsatisfactory

Additional Comments: ______________________________________________________________________________

This questionnaire has been completed to the best of my ability and knowledge by:

Evaluator Signature

Evaluator Name (Printed): __________________________ Title: ___________________________________________ Organization: ____________________________________ Date Signed: _____________________________________

ATTACHMENT 7
Has the project been accepted as complete by the customer: Yes No
Award/Project Amount:
For each of the questions appearing on the attached sheets, please place an “X” next to the statement which best represents your evaluation in response to the subject questions. Please add any comments which will add value to your marked response.
A: Timely Performance
B: Effectiveness of Management
E: Regulatory Compliance
Initials:
Owner Organization Name:
Evaluator Name:
Address:
Telephone Number:
Name of Project and Contract Number if applicable:
Has the project been accepted as complete by the customer: Off
Project Location:
Is this project located above the 60th Parallel: Off
Description of Project Use Additional Sheets if Necessary 1:
Description of Project Use Additional Sheets if Necessary 2:
1:
2:
Painters:
Fire SprinklerAlarm:
Carpenters:
Roofers:
Plumbers:
Sheet Metal Workers:
HVAC:
Hazardous Material Removal Workers:
Electricians:
Construction Equipment Operators:
Minimal Design:
Would you award a contract to this firm again for similar work: Off
Initials_2:
Contractor completed project significantly ahead of scheduled completion date: Off
Contractor completed project by original scheduled completion date: Off
Contractor completed within agreed to extended completion date: Off
Contractor failed to meet project completion date: Off
Contractor consistently exercised a proactive approach: Off
Contractor demonstrated some initiative in exercising a proactive approach: Off
Contractor rarely demonstrated a proactive approach: Off
Contractor never demonstrated a proactive approach: Off
Contractor consistently made submissions ahead of schedule: Off
Contractor made some submissions ahead of schedule and all others on time: Off
Contractor made majority of submissions on time: Off
Contractor submissions were usually behind schedule: Off
undefined:
Contractor was always cooperative: Off
Contractor was usually cooperative: Off
Contractor was sometimes cooperative: Off
Contractor was not cooperative: Off
Initials_3:
Contractor: Off
Contractor_2: Off
Contractor_3: Off
Contractor_4: Off
No adjustments were made to the project team throughout the project: Off
Minor adjustments were made to the project team during the project: Off
Significant changes to the project team were made during the project: Off
Contractor maintained no consistency in key personnel during the project: Off
Contractors team was always adequately staffed: Off
Contractors team was usually adequately staffed: Off
Contractors team was sometimes adequately staffed: Off
Contractors team was never adequately staffed: Off
Contractor always complied with all regulations: Off
Contractor usually complied with all regulations: Off
Contractor sometimes complied with all regulations: Off
Contractor consistently failed to comply with all regulations: Off
Contractor always disposed of all generated hazardous waste: Off
Contractor usually disposed of all generated hazardous waste: Off
Contractor did not dispose of generated hazardous waste: Off
Contractor was not responsible for disposing of hazardous waste: Off
Initials_4:
Contractor set up a satisfactory safety plan specific to the requirements: Off
Contractor adapted a generic safety plan that met project needs: Off
Contractor has a generic safety plan used on every project no adaptations: Off
Contractors safety plan was ineffective for my project: Off
Contractor always exceeded contract requirements: Off
Contractor usually exceeded contract requirements: Off
Contractor met the minimum requirements: Off
Contractor did not meet the minimum requirements: Off
Was the contractor responsive in completing punch list items: Off
Contractor completed punch list items after initial notification: Off
Contractor completed most punch list items after initial notification: Off
Contractor eventually completed all punch list items: Off
Contractor has an established comprehensive program with individuals employed: Off
Contractor set up a satisfactory quality control program to comply with the: Off
Contractors quality control program was ineffective on the project: Off
Contractor exceeded the quality expectations: Off
Contractor met quality expectations: Off
Contractor performed marginal quality of work: Off
Contractor performed poor quality of work: Off
Initials_5:
ExceptionalRow1:
Very GoodRow1:
SatisfactoryRow1:
MarginalRow1:
UnsatisfactoryRow1:
Evaluator Name Printed:
Title:
Organization:
Date Signed:
Initials_6:
Text1:
Text2:
Text3:
Text4:
Comments 1_4:
Comments 2_4:
Comments 3_4:
Text2_5:
Text 3_5:
Text1_5:
Comments 1_5:
Comments 2_5:
Comments 3_5:
Text 1_6:
Text 2_6:
Text 3_6:
Comments 1_6:
Comments 2_6:
Comments 3_6:
Comments 1_7:
Comments 2_7:
Comments 3_7:
Additional Comments 2:
Additional Comments 3:
Additional Comments 4:
Additional Comments 1:
Additional Comments 5:
Comments 1_8:
Comments 2_8:
Comments 3_8:
Comments 1_9:
Comments 2_9:
Comments 3_9:
Comments 1_10:
Comments 2_10:
Comments 3_10:
Comments 1_11:
Comments 2_11:
Comments 3_11:
Comments 1_3:
Comments 2_3:
Comments 3_3:
Comments:
Comments 1_2:
Comments 2_2:
Comments 3_2:
Comments 1_1:
Comments 2_1:
Comments 3_1:

File details come from the government source that posted it. Updated .