Attachment 7 - Interceptor Specifications.pdf

PDF 1 MB Posted

Attached to
Ottawa National Forest North Zone Marking Contract 2
Solicitation number
12569R20Q0033
Issued by

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Interceptor Timber Sale (#51158) – Prickett VMP 05/05/2020

SECTION C – DESCRIPTION/SPECIFICATION/WORK STATEMENT

C.1 Scope of Contract This contract is for Payment Units (1-3) in the Interceptor Timber Sale. It involves timber marking and volume estimation of approximately 73 acres in Northern Hardwoods forest types, broken down by the following descriptions:

(1) HARDWOOD SELECTION, IMPROVEMENT, THINNING (Marking & Cruising)

Payment Units 1-3: approximately 73 acres

Uneven aged stands or even-aged stands with uneven-aged or even-aged objectives consisting of a mixture of Northern Hardwood types of various size classes. These stands contain both pulpwood and sawtimber Species/Product/Unit mixes. Marking objectives are to remove trees considered high risk, defective, poor form, or mature and to maintain or develop size class structure with optimum growing stock, per the specific marking instructions.

(8) SAMPLE TREE CRUISING METHOD

Payment Units 1-3: approximately 73 acres

The Sample Tree cruising method (STR) involves measuring a specified proportion (Sample Interval) of trees in the defined sub-population. The remaining trees included for removal are tallied as count trees. With this cruising method, every tree included for removal must be visited and marked.

NOTE: USFS has not marked the Road ROW unit (4) yet for this sale. This will be done by USFS at a later date. For units that have a road running through them, contractor should still mark/cruise trees up to the edge of the existing road clearing.

NOTE: Government furnished tree marking paint (TMP) will be issued, or returned, by appointment only at the ONTONAGON RANGER DISTRICT OFFICE. The primary point of contact for all TMP transactions will be the paint custodian. This person will be identified at the pre-work meeting. BLUE paint has been designated for this sale.

NOTE: USFS will mark any and all Leave Trees.

C.2 LOCATION AND DESCRIPTION

The Interceptor Marking/Cruising Contract is located on the Ontonagon Ranger District and consists of about 73 acres of Hardwood Selection.

This sale can be accessed from the following direction:

From M-38, travel south on South Laird Road approsimately 3 miles to FR 1659. Sale is on FR 1659 on east side of South Laird Road.

Interceptor Timber Sale (#51158) – Prickett VMP 05/05/2020

From M-28 in Kenton, travel north on FH-16 for approximately 13 miles. Turn east onto South Laird Road and travel approximatley 3 miles to where the road turns north and continue north approximately 4 miles to FR 1659. Sale is on the east side of South Laird Road on FR 1659.

ONF-2400-2 3/1/07 Version

OTTAWA NATIONAL FOREST

SILVICULTURAL PRESCRIPTION / MARKING GUIDES

STAND INFORMATION

PU-

Ranger District

Comp- Stand

Acres MA LTA ELTP

Habitat Type

Cover Type LSC

Year of Origin

Size Density SI BA

01-05 42-11 11 6.2 6 176C ATD 85 500 1903 9 60 190

42-12 85 500 1909 60

2-05 42-10 25 6.2 6 176C ATD 85 500 1931 72 150

42-11 85 500 1903 60 42-12 85 500 1909 60

3-05 42-9 37 6.2 6 176C ATD 85 500 1877 62 150

42-13 85 500 - 65 42-10 85 500 1931 72

STAND DESCRIPTION

These stands are mature, uneven-aged northern hardwood stands with a good amount of species and size class diversity. They are composed primarily of sugar maple with scattered red maple, eastern hemlock, basswood, and yellow birch. Occasional white ash and northern red oak occur in the stands. Many of the oak are large sawtimber-size. Scattered hemlock-dominated patches also occur across the area. There may be occasional quaking aspen. Stand densities are fairly similar across the stands, averaging around 140ft2 to 200 ft2 BA. There are more heavily-stocked, denser areas and areas that are more open. Amongst the hardwoods, all size classes are fairly well-represented with diameters ranging from <6” to 24”. Average DBH is ~14”.

There are several spots of established sugar maple advance regeneration (1”-2” DBH), especially in PU3.

Soils are moderately well-drained, coarse loams. These stands occur on generally productive hardwood growing sites.

DESIRED CONDITION

The desired conditions are uneven-aged northern hardwood stands with the current species diversity maintained or enhanced. The future stand should feature species other than sugar maple, including northern red oak, basswood, white ash, and black cherry. Regenerating a new age class that contains these mid-tolerant species, as well as sugar maple, and is free-to-grow from browse pressure is also desired. Hemlock inclusions are generally kept intact.

SHORT AND LONG TERM OBJECTIVES

The short term objective is to regenerate of a new age class to perpetuate the uneven-aged structure by creating canopy gaps from the removal of individual or groups of trees. Another objective is to release any existing regeneration of mid-tolerant species in the sub-canopy from overstory competition. The current species diversity should be maintained or increased by favoring species other than sugar maple. With these stands containing high amounts of mid-tolerants like white ash and northern red oak, large canopy gaps to promote their regeneration should be created.

The long term objective is maintain a healthy uneven-aged northern hardwood stand that is diverse in both species composition and structure.

NEPA DECISION DOCUMENT: Prickett VMP TIMBER SALE: Interceptor PU: All

ONF-2400-2 3/1/07 Version

REMARKS

There may be scattered, small, poorly drained pockets, seeps, steep slopes, perched water tables, or shallow bedrock areas; do not designate any trees for removal in these areas.

This prescription was written to allow flexibility to the timber marker on the ground for achieving the objective with the variety in the area. Always manage for the best tree in place. If you have questions, please contact the Kenton RD Silviculturist.

MARKING GUIDE:

Name of Treatment - Selection Harvest

Residual BA/Ac 70-80 ft2

Acres - see cover sheet

Canopy gaps should be created by removing large trees or groups of smaller trees to create favorable conditions for the regeneration of northern hardwoods and mixed upland hardwoods. Canopy gaps should generally be approximately 70’-100’ in diameter. Try to maintain the diversity in size classes while focusing on removing high risk trees. Trees with poor form or poor health should be marked for removal. Most trees over 24” should be marked for removal unless it is cull or has wildlife value. Where large trees are selected for removal, mark enough smaller trees to create drop zones for the large trees. In hemlock-heavy areas, it may be necessary to select some hemlock for removal to create drop zones. Select against sugar maple and red maple to increase diversity within the stand where opportunities exist. Focus on leaving good quality crop trees with good form and improving their growing conditions, especially in the pole-heavy sections of the stand. Favor healthy oak, white ash, basswood, yellow birch, black cherry, paper birch, and eastern hemlock for retention. Always manage for the best tree in a location. Try to create larger canopy openings adjacent to desirable mid-tolerant overstory trees, like oak and white ash, to promote their natural regeneration. The target residual basal area for these stands is 70-80 ft2/acre. In areas that are heavier to hemlock, leave the residual BA a little higher. Try to release groups of established desirable saplings in the understory from overstory competition.

If any mature aspen clones are encountered in the stand, favor the regeneration of the aspen clone over the hardwoods by removing all the overstory (clearcut) in that area. Young, healthy clones of aspen can be left intact and released from overstory competition.

DESIGN CRITERIA AND MITIGATION MEASURES

Highlighted Design Criteria, see NEPA for all of the criteria Cull trees should be left for wildlife, do not remove trees with little or no value unless they pose an insect or disease threat to the stand (A2). If cull trees need to be marked the silviculturist should be notified to look at the risk.

Treat aspen inclusions in other forest type to favor aspen.

Remove all merchantable ironwood Remove all white spruce 10 inches and greater

POST HARVEST TREATMENTS

FACTS Code Name of Treatment Prescription

4341 Stocking Survey Survey to ensure adequate regeneration of 3200 TPA on 40% 1/1000th ac plots

4341 Stocking Survey Survey to ensure adequate regeneration of 3200 TPA on 40% 1/1000th ac plots

4382 Cert for Naturals wo/SP Enter certification once regeneration goal is met.

ACTIVITIES SUMMARY

Year Facts Activity Code Description

2021 4151 Individual Tree Selection 2022 4341 Stocking Survey 2024 4341 Stocking Survey 2024 4382 Cert for Naturals wo/SP

Prepared by: John Bowers

Reviewed by: Dave Steffensen

Approved by:

Title: Silviculturist

Title: Certified Silviculturist

Title:

Date: 4/7/2020

Date: 4/8/2020

Date:

NEPA DECISION DOCUMENT: Prickett VMP TIMBER SALE: Interceptor PU: All

Interceptor Timber Sale (#51158) – Prickett VMP 4/9/2020

Marking Guides/Cruise Design

CRUISE DESIGN - STRATA 1 - Sample Tree Measure (STR)

Estimated Gross Sale Value: ~ $21,811.30

Maximum Sampling Error (Sale): +/- 18% (per FSH 2409.12, Chapter 40, 41.1 – Exhibit 01) Maximum Sampling Error (Stratum): +/- 40% for tree measurement sales

******** Marking Contract Acres ********

Payment Unit Treatment Approx. Acres 1-3 Hardwood Selection 73 Total Approximate Acres: 73

******** USFS Marking Acres ********

Payment Unit Treatment Approx. Acres

4 ROW Right-of-way clearing – USFS will mark (1)

Instructions

Payment Unit 1-3– Hardwood Selection/Sample Tree Cruising (STR) – ALL merchantable trees to be removed from this Payment Unit require two paint marks at DBH on opposite sides of the tree AND a corresponding stump mark (see specific Marking Instructions for this Payment Unit). Cruise marked trees using the Sample Groups and Sample Intervals below.

Payment Unit 4: Right-of-way Clearing (USFS mark) - Sample Tree Cruising (STR) ALL merchantable trees to be removed from this Payment Unit require paint marks at DBH on opposite sides of the tree AND a corresponding stump mark. Cruise marked trees using the Sample Groups and Sample Intervals below.

NOTE: Refer to Marking Guides for specific marking instructions for these Payment Units.

* USFS personnel will be marking Payment Unit 4 - road ROW at a later date.

NOTE: Government furnished tree marking paint (TMP) will be issued, or returned, by appointment only at the ONTONAGON RANGER DISTRICT OFFICE. The primary point of contact for all TMP transactions will be the paint custodian. This person will be identified at the pre-work meeting. BLUE paint has been designated for this sale.

Interceptor Timber Sale (#51158) – Prickett VMP 04/09/2020

Interceptor Timber Sale - #51158 Cruise Design-Strata 1 (Sample Tree Measure)

Sample Group Description DBH Range Sample Interval

A Aspen Pulpwood 5.0” + 1:10 CP Mixed Conifer Pulpwood (Fir, Spruce, White

Pine, Cedar, Hemlock) 5.0” + 1:10

CW Mixed Conifer Sawtimber (Fir, Spruce, Cedar

& Hemlock) 9.0” + 1:5

HL Large Mixed Hardwood Pulpwood (Maple, Birch, Ash, Ironwood, Cherry, Oak, Basswood, Elm)

11.0” + 1:100

HS Small Mixed Hardwood Pulpwood (Maple, Birch, Ash, Ironwood, Cherry, Oak, Basswood, Elm)

5.0” – 10.9” 1:400

JP Jack Pine Pulpwood 5.0”+ 1:5 OL Large Other Hardwood Sawtimber (Red

Maple, Birch, Ash, Oak, Basswood, Elm) 17.0”+ 1:25

OS Small Other Hardwood Sawtimber (Red Maple, Birch, Ash, Oak, Basswood, Elm)

11.0” – 16.9” 1:75

SL Large Sugar Maple Sawtimber 17.0”+ 1:25 SS Small Sugar Maple Sawtimber 11.0” – 16.9” 1:50 RS Red Pine Pulpwood 5.0”+ 1:5 RW Red Pine Sawtimber 9.0”+ 1:5 WW White Pine Sawtimber 9.0” + 1:5

Prepared by David Vogt, Forestry Technician Updated by Sara Vial, Forester

MINIMUM TREE AND PIECE UTILIZATION STANDARDS

Minimum Tree

Specifications

Minimum Piece Specifications

SPECIES PRODUCT DBH (inches) Length

(feet)

DIB

(inches)

Minimum

Net Scale in

% of Gross

Hardwoods (except aspen)

Sawlogs 11.0 8 9.6-11.5 95% 1/

Hardwoods Sawlogs 11.0 8 11.6+ 50% 1/

Softwood Sawlogs 9.0 8 7.6 40

All Species Pulpwood 5.0 8 4.0 70 and reasonably straight 2/

1/ In Timber Sale Contracts, all hardwood sawlogs will use 50% minimum net scale in gross %, due to limitations in TIM. Cruising will use 95% minimum net scale for small diameter logs (9.6 – 11.5 DIB).

2/ Seventy percent applies to rot, voids, and char. Mechanical type defects such as sweep, crook, spider heart, and ring shake will not be considered.

Reasonably straight - When the true line of a minimum length piece does not deviate more than ½ the inside diameter of the small and plus two inches from a straight line drawn between the centers of the ends of a piece.

The maximum deflection allowed is what will fit in a 20-inch cylinder.

A minimum tree must include at least one piece that meets minimum specifications.

** Product heights are now measured to the nearest foot. All heights are measured in feet from the ground on the high side of the stump.

1. Conifers – measure total height (to the tip) in feet and the cruise program will calculate the 4” cut-off.

2. Hardwoods (includes Aspen) – measure the height in feet to the 4” top.

3. Sawtimber – cut-off point or “stoppers” will follow our regular practices. Measure sawtimber height in feet. Secondary product height will be measured as described in item 1 or 2 depending on the species.

4. Default dib’s are already built into the equations;

Pulpwood = 4.0” Sawtimber = 9.6” (hardwood) = 7.6” (mixed conifers, pine)

5. On trees with a broken, dead, or deformed top, record the height to the point where the 4” top or the tip would have been if the tree were still growing normally, then record defect to account for the missing volume.

Marking Prescriptions Written by:

/s/ John L. Bowers_____________________ 04-10-2020_____________________ John L. Bowers Date Silviculturist

Narrative by:

/s/ Jacklyn Paukert________________________ 04-09-2020________________________ Jacklyn Paukert, Forestry Technician(TSI) Date

Cruise Design by:

/s/ David Vogt____________________________ 04/10/2020_______________________ David Vogt, Forestry Technician Date

Reviewed by:

/s/ James K. Pelkola_____________________ 04-10-20 ______________________ James K. Pelkola Date Supervisory Forester / TMA (North Zone)

Approved by:

/s/ Barbara C. Van Alstine__________________ 04/09/2020_______________________ Barbara C. Van Alstine Date District Ranger

X

X

X

X

X

X

X X

X

X

X

X X X

X¬«1

¬«2 ¬«3

¬«3 ¬«3

¬«2 ¬«3

¬«2 ¬«2

12 7

24 19

So ut h L a i rd R oa d

FR 1659

FR

1659-C

FR

1659-D

Silver River

USDA - APFO; USDA - USFS – GTAC

0.2 0 0.2 0.4 0.6 0.8 10.1 Miles

Interceptor TS # 51158 Payment Unit Vicinity Map

1:15,840

Legend InterceptorSaleAreaBoundary

InterceptorPU

Maintenance

Reconstruction

Decommissioned

X R9 OTT Corners

ALP Section

OWNERCL...

NON-FS

FType Stream/River

FType Lake, Pond ,Reservoir, Estuary

PU Approximate Acres 1- 11 2- 25 (18+6+1) 3- 37 (3+1+33)

4 (ROW) - 1

Total (1-3) = 73

Region 9 Supervisor, Forest, and District offices

JLP 05/19/2020

Houghton County

T50N R36W T50N R35WInterceptor Sale Boundary

Vicinity Map Not to Scale

File details come from the government source that posted it. Updated .