Attachment 6 - Vendor Questions and Concerns.pdf

PDF 58 KB Posted

Attached to
MAFR Well Repair
Solicitation number
FA485525Q000400001
Issued by

About this file

This is a questions and answers document related to a well repair contract at MAFR (Military Air Force Range). The document addresses technical clarifications about installing a new 20 HP submersible well pump in well #3502, which is approximately 400 feet deep.

Key details include: the existing steel piping needs to be replaced with 4" HDPE piping; the well currently functions at low production (10 GPM or less); power requirements are 480 3-phase with soft start or VFD needed; static water level is approximately 360' and dynamic water level is 380' (both requiring field verification). The well is over 30 years old and requires sediment removal. A site visit is scheduled for January 29th at 1:00 P.M. Mountain Time. The well is located near an aircraft firing zone, requiring coordination with WAFR range personnel for access. The contractor can leave equipment on-site overnight in a secure area, and work outside normal hours is permitted. Well resealing requires caulking or grout and base color scheme paint.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Clarification on "bail the well column":

a) Does this refer to removing just one volume of standing water from the well? No bailing out all rust and sediment from the bottom of the well column.

b) Can you confirm that bailing any sediment or sand is not required? No, it will be required due to the age of the well. 30+years.

2. Inconsistencies in Section 1.1:

a) The PWS states: “install a new 20 Horsepower (HP) submersible well pump and attach it to existing high-density polyethylene (HDPE) piping to a predetermined optimal depth. The well casing for well #3502 is approximately 400 feet in depth.”

i. Could you confirm if the pump is connected to HDPE in the well and connected to the surface discharge elbow? It isn’t connected to HDPE but needs to be attached to new HDPE, my mistake in the PWS.

ii. Please provide the size of the piping. 4”

b) Additionally, the document mentions: “Column Pipe: 16" X 360’; Head: 400 Feet.”

Could the 16” pipe listed here refer to the well casing? Please confirm the column pipe size and material. 4” steel but needs to be replaced with 4” HDPE.

3. Additional Details Needed:

a) Could you provide any available well documentation, including specifications, drawings, or historical data? No.

b) When was the well last in operation, and do you know the cause of the pump failure? It still functions just real low production,10 GPM or less.

c) What are the available power options for the new installation? 480 3phase.

d) Could you share details on the required Total Dynamic Head (TDH), and any available Process and Instrumentation Diagrams (P&ID) of the surface pipeline?

No available data.

e) What are the expectations for pump control, such as the need for a soft-start option or Variable Frequency Drive? Soft start or VFD is needed.

4. Site Visit Feasibility:

a) Would it be possible to arrange a site visit for further assessment? Yes, we are coordinating with the customer to schedule a site visit for January 29th at 1:00 P.M. Mountain Time. Please reach out to A1C London and SrA Lampkin if interested, any additional details will be posted as they come.

5. From our understanding, the term “column pipe” might be referring to what is commonly known in the industry as a "drop pipe". It would be very unusual for HDPE pipe to be used as column pipe. Is it possible that a CertaLok-style column pipe, as referenced in the attached brochure, might be intended? Please advise. Steel casing is in the well casing and existing steel piping needs to be replaced with 20 HP submersible attached to it.

6. Can the installation rig and equipment be left at the well site overnight? Yes, and it will be secure.

7. If the pump removal/installation operation requires the rig to remain on-site overnight or outside normal hours, can this be arranged? Yes

8. What is the static water level of the well? Approximately 360’, need to field verify What is the dynamic water level of the well when it was in normal service? Approximately 380’, field verify

9. Should a visual (video) well inspection be included in the scope of work? Don’t believe it is necessary

10. What should be used to re-seal the well? Caulking or grout and paint with base color scheme paint

11. Vendor concern: Awardee will need to schedule work with the range at least 1 month before starting work due to well area being located directly next to an aircraft firing zone.

No, just get with WAFR range personnel for access.

12. Vendor concern: Awardee will need to get range certified as well as obtain burn work permit in order to work without range supervision and be able to perform any necessary burn work to remove old well. Not sure on this, will get back with answers.