Attachment 6 Self-Performed Work Calculations.docx
DOCX document 26 KB Posted
- Solicitation number
- 36C25725R0051_1
About this file
This document is an Attachment for Self-Performed Work Calculations related to a Veterans Affairs construction contract with specific subcontracting limitations. The file provides a template for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) to calculate their self-performed work percentage, requiring offerors to complete calculations showing their total proposed price, amount paid to non-VetCert SDVOSBs, and percentage of estimated self-performed work. For general construction contracts, the prime SDVOSB contractor is restricted from paying more than 85% of the government contract amount (excluding material costs) to non-certified firms, which ensures significant work performance by veteran-owned businesses.
The related federal contract opportunity involves renovation of a pre-engineered metal building, solicitation number 36C25725R0051_1, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. The solicitation appears to be specifically targeting Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) for a construction project, with strict requirements for self-performance and subcontracting limitations to provide meaningful opportunities for veteran-owned businesses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFEROR’S SELF PERFORMED CALCULATIONS
INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-75 Notice of Limitations on Subcontracting)
At the time of proposal Offeror’s are required to complete.
a) Offeror’s total proposed price: $ __________
b) Amount projected to be paid to Non-VetCert listed SDVOSBs: $ __________ (not including materials)
c) Offeror’s percentage of estimated Non-VetCert work (b/a X 100 = %) __________%
d) Offeror’s percentage of estimated self-performed work (100 – c = %) __________%
General construction. In the case of a contract for general construction, the SDVOSB prime contractor will not pay more than 85% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not certified VetCert SDVOSBs.
File details come from the government source that posted it. Updated .