This document is the Reporting Requirements and Deliverables attachment for the Evaluation and Testing Services (ETS) for Vaccines and Other Biologics for Infectious Diseases contract opportunity (Solicitation #75N93024R00019).
The key details are:
- The contractor must submit monthly progress reports that include status on milestones/deliverables, products/procedures/outcomes achieved, schedule and cost tracking, and other information required by the Contracting Officer's Representative (COR).
- The contractor must submit final study reports upon completion of each study, consisting of study goals, methods, results, data, and interpretations.
- Other required deliverables include draft and final project management and quality management plans, meeting materials, and study-specific plans and reports for assay development, sample testing, and safety/toxicology studies.
- All reports and deliverables must be submitted electronically via the NIAID Reports and Deliverables System. Delivery schedules vary from 10 business days to 30 calendar days after certain events.
- The contracting agency is the National Institute of Allergy and Infectious Diseases (NIAID) within the Department of Health and Human Services.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 6: REPORTING REQUIREMENTS AND DELIVERABLES
EVALUATION AND TESTING SERVICES (ETS) FOR VACCINES AND OTHER
BIOLOGICS FOR INFECTIOUS DISEASES
75N93024R00019
A. REPORTING REQUIREMENTS
A. Technical Reports:
In addition to those reports required by the other terms of this contract, the Contractor shall prepare and submit the following reports in the manner stated:
Format of Cover page: All reports shall include a cover page prepared in accordance with the following format:
• Contract and Task Order Number and Project Title
• Name and Sequence of Report (e.g., “Year 1, 2nd Study Report”)
• Period of Performance Being Reported
• Contractor’s Name and Address
• Author(s)
• Date of Submission
• Delivery Address
1) Monthly Progress Reports: The Contractor shall submit to the Contracting
Officer and to the Contracting Officer’s Representative (COR) electronic copies of Monthly Progress Reports covering the work accomplished during each reporting period to be delivered by the 15th of the month following each reporting period. These reports are subject to technical inspection and requests for clarification by the COR. These reports shall be brief and factual and shall include the following:
a. Progress on Milestones and Deliverables (actions taken to achieve the task);
b. All products, procedures and outcomes achieved;
c. Brief descriptions of pertinent data; graphs and tables of data obtained;
d. Updated schedule (i.e., Gantt chart);
e. Schedule analyses of estimated completion date with actual;
f. Discussion of schedule variance;
g. Financial summary by task (a summary of cost related to estimated effort completed) including cost variance;
h. Other information as may be required by the COR.
2) Study Report(s) Upon the completion of each study as indicated in the Task
Order, the Contractor shall submit a Final Study Report as described below. The
Study Report shall be concise, comply with relevant FDA and ICH guidelines, and consist of the following:
a. a description of the goals of the study and how the study was designed to
ii. achieve that goal;
1. a report of all products, procedures and outcomes achieved;
2. graphs and tables of data obtained;
3. a discussion and interpretation of the results
4. appendices with raw data such that the report is adequate for review by the
Food and Drug Administration.
II. REPORTS AND DELIVERABLES
Satisfactory performance of the completion of the Task Order shall be deemed to occur upon performance of the work described in the Statement of Work (Attachment 3), the Task Orders Statement of Work, and upon delivery and acceptance by the Contracting Officer, or duly authorized representative, of the following items in accordance with the stated delivery schedule.
If the Contractor becomes unable to deliver the reports or other deliverables herein specified within the period of performance because of unforeseen difficulties, notwithstanding the exercise of good faith and diligent effort in performance of the work, the Contractor shall give the Contracting Officer immediate written notice of anticipated delays with reasons therefore at the address given below.
The items stated below, and as described in Attachment 3: Statement of Work, in Attachment 6: Reporting Requirements and Deliverables, and in the Task Orders Statement of Work, shall be delivered F.o.b. Destination as set forth in FAR 52.247-35, F.o.b. DESTINATION, WITHIN CONSIGNEES PREMISES (APRIL 1994), and in accordance with and by the date(s) specified below and any specifications stated in SECTION D, PACKAGING, MARKING AND SHIPPING of the solicitation.
A. Technical Progress Reports
Item Deliverables Recipient Delivery Schedule 1 Monthly Progress Reports including updated Gantt chart for each individual Task Order
Submission via eRDS
Each report shall be submitted on or before the 15th of the month following each reporting period.
B. Other Reports and Deliveries
Item Deliverables Recipient Delivery Schedule 2 Draft Task Order Project
Management Plan Submission to
COR
Draft to be submitted within 30 calendar days of Task Order award.
3 Final Task Order Project Management Plan
Submission via eRDS
Final to be submitted within 10 business days after receipt of the COR comments
4 Draft Task Order Quality Management Plan
Submission to
COR
Within 30 calendar days of Task Order award.
5 Final Task Order Quality Management Plan
Submission via eRDS
10 business days after receipt of the COR comments
6 Materials for Meetings/Teleconference
Submission via eRDS
Agendas and Background Materials at least 2 days prior to the meeting/teleconference;
Written summaries no later than 3 business days after meeting/teleconference.
7 Copies of publications, abstracts, presentations, and any other information prior to public dissemination
Submission via eRDS
At least 30 calendar days prior to publication/release
SOW Task Area B (Assay Development, Clinical and Non-clinical Sample Testing) 8 Assay Development/ Reagent
Procurement Plan Draft submission to COR Final Submission via eRDS
Draft 30 calendar days after completion; Final within 10 business days of the after receipt of the COR comments
9 Study Plan/ Protocol
Draft submission to COR Final Submission via eRDS
Draft upon request by the COR; Final within 10 business days of the after receipt of the COR
10 Assay Development Report
Final Submission via eRDS
Draft 30 calendar days after completion; Final within 10 business days of the after receipt of the COR comments
11 Assay Qualification or Validation Protocol
Draft submission to COR Final Submission via eRDS
Draft upon request by the COR; Final within 10 business days of the after receipt of the COR comments
12 Assay Qualification or Validation Reports
Final Submission via eRDS
Draft 30 calendar days after completion; Final within 10 business days of the after receipt of the COR
13 Tech Transfer Plan as required by
COR
Draft submission to COR Final Submission via eRDS
Draft 30 calendar days after completion; Final within 10 business days of the after receipt of the COR comments
14 Sample Testing Plan Draft submission to COR Final Submission via eRDS
Draft upon request by the COR; Final within 10 business days of the after receipt of the COR comments
15 Study Report with Sample testing Results
Draft submission to COR Final Submission via eRDS
Draft upon request by the COR; Final within 10 business days of the after receipt of the COR comments
SOW Task Area C (Non-clinical Immunogenicity and Efficacy Testing) 16 Study Plan Draft submission to COR Final Submission via eRDS
Draft upon request by the COR; Final within 10 business days of the after receipt of the COR comments
17 Quality Agreement if study is conducted at Subcontractor site
Draft submission to COR Final Submission via eRDS
Draft upon request by the COR; Final within 10 business days of the after receipt of the COR comments
18 Study Protocol(s) Draft submission to COR Final Submission via eRDS
Draft upon request by the COR; Final within 10 business days of the after receipt of the COR comments
19 Study Report Draft submission to COR Final Submission via eRDS
Draft within 26 weeks of completion of the in-life phase; Final within 10 business days after the receipt of the COR comments
20 E-data Set (and delivery of all associated data), if applicable
Submission via eRDS
Within 30 calendar days of receipt of the final study report or as requested by the COR
21 Animal CRFs and scanned raw data, if applicable
Submission via eRDS
Within 30 calendar days of receipt of the final study report or as requested by the COR
22 Site visit/audit reports if study is conducted at Subcontractor site
Submission via eRDS
Within 30 calendar days of site visit or as requested by the COR
SOW Task Area D (Safety and Toxicity Testing including specialty toxicology) 23 Study Plan Draft submission to COR Final Submission via eRDS
Draft upon request by the COR; Final within 10 business days of the after receipt of the COR comments
24 Quality Agreement if study is conducted at Subcontractor site
Draft submission to COR Final Submission via eRDS
Draft upon request by the COR; Final within 10 business days of the after receipt of the COR comments
25 Study Protocol Draft submission to COR Final Submission via eRDS
Draft upon request by the COR; Final within 10 business days of the after receipt of the COR comments
26 Safety and Toxicology Study Report
Draft submission to COR Final Submission via eRDS
Draft within 4 months after completion of the in-life portion of the study; Final Study report within 10 business days after the receipt of the COR comments
27 E-data Set (and delivery of all associated data)
Submission via eRDS
Within 30 calendar days of receipt of the final study report or as requested by the COR
28 Site visit/audit reports Submission via eRDS
Within 30 calendar days of site visit or as requested by the COR
C. Copies of all reports shall be submitted as follows:
The above items shall be submitted in electronic format via the NIAID electronic Reports and Deliverables System, at https://erds.niaid.nih.gov/ or:
https://erds.niaid.nih.gov/
Number of Copies Addressee 1 electronic copy submitted via eRDS. Paper copies only as directed by the COR.
Contracting Officer’s Representative (COR), TBD Office of Biodefense, Research Resources and Translational Research (OBRRTR) National Institute of Allergy and Infectious Diseases National Institutes of Health 5601 Fishers Lane, Room TBD, MSC 9825 Rockville, MD 20852 Email: TBD
1 electronic copy submitted via eRDS.
Paper copies only as directed by the COR/CO.
Contracting Officer (CO), TBD Office of Acquisitions Division of Extramural Activities National Institute of Allergy and Infectious Diseases National Institutes of Health 5601 Fishers Lane, Room TBD, MSC 9825 Rockville, MD 20852 Email: TBD
File details come from the government source that posted it. Updated .