SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

04/20

PART 1 GENERAL

PAYMENT TYPES

SINGLE JOB PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.

The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

If there is any work required of this contract that is not associated with a base bid item description or bid option description, then the costs for that work shall be included in the first base bid item.

SCHEDULE OF ITEMS: BASE ITEMS

Base Item 0001: School Building

Unit of Measure: Job.

Payment will be made for costs associated with design and construction of a new, single story solid masonry/concrete building with sloped roofs that includes the Functional Areas: 101 – classroom, 102 – classroom, 103 – classroom, 104 – classroom, 115 – storage, 116 – Janitor, 118 – Principal’s room, 119 – Library, 120 – Teacher’s room, 121 – Laboratory, 123 – Male toilets, - 124 Employee toilets, 125 Female toilets, 126 Employee toilets, 127 – Corridor, and 128 – covered entry with boot scraper stations. This effort includes, but is not limited to all civil and geotechnical requirements for the school building, building system and materials, exterior construction work, interior construction work, sinage, final clean-up, structural requirements, electrical and communications requirements, and mechanical requirements. This work shall include all applicable demolition and removals work to support the work elements contained in this item. This item excludes all work included in Base Item 0002 and Option Items 0003 - 0014.

Base Item 0002: Utility Building

Payment will be made for costs associated with design and construction of a new, single story solid masonry/concrete building with sloped roofs that includes the Functional Area 201 – Utility Building with heating room and wood storage. This effort includes, but is not limited to all civil and geotechnical requirements, building system and materials, exterior construction work, interior construction work, sinage, final clean-up, structural requirements, electrical and communications requirements, and mechanical requirements. This work shall include all applicable demolition and removals work to support the work elements contained in this item. This item excludes all work included in Base Item 0001 and Option Items 0003 - 0014.

SCHEDULE OF ITEMS: OPTION ITEMS

Option 1: Item 0003: Classroom (FA 105)

Unit of Measure: Job.

Payment will be made for costs associated with design and construction of Functional Area 105 –Classroom as an addition to the school building. This effort includes, but is not limited to, building system and materials, exterior construction work, interior construction work, sinage, final clean-up, structural requirements, electrical and communications requirements, and mechanical requirements. This work shall include all applicable demolition and removals work to support the work elements contained in this item. This item excludes all work included in Base Items 0001 and 0002 and Option Items 0004 – 0014.

Option 2: Item 0004: Classroom (FA 106)

Unit of Measure: Job.

Payment will be made for costs associated with design and construction of Functional Area 106 –Classroom as an addition to the school building. This effort includes, but is not limited to, building system and materials, exterior construction work, interior construction work, sinage, final clean-up, structural requirements, electrical and communications requirements, and mechanical requirements. This work shall include all applicable demolition and removals work to support the work elements contained in this item. This item excludes all work included in Base Items 0001 and 0002 and Option Items 0003, 0005 - 0014.

Option 3: Item 0005: Classroom (FA 107)

Unit of Measure: Job.

Payment will be made for costs associated with design and construction of Functional Area 107 –Classroom as an addition to the school building. This effort includes, but is not limited to, building system and materials, exterior construction work, interior construction work, sinage, final clean-up, structural requirements, electrical and communications requirements, and mechanical requirements. This work shall include all applicable demolition and removals work to support the work elements contained in this item. This item excludes all work included in Base Items 0001 and 0002 and Option Items 0003 - 0004, 0006 - 0014.

Option 4: Item 0006: Classroom (FA 108)

Unit of Measure: Job.

Payment will be made for costs associated with design and construction of Functional Area 108 –Classroom as an addition to the school building. This effort includes, but is not limited to, building system and materials, exterior construction work, interior construction work, sinage, final clean-up, structural requirements, electrical and communications requirements, and mechanical requirements. This work shall include all applicable demolition and removals work to support the work elements contained in this item. This item excludes all work included in Base Items 0001 and 0002 and Option Items 0003 - 0005, 0007 - 0014.

Option 5: Item 0007: Classroom (FA 109)

Unit of Measure: Job.

Payment will be made for costs associated with design and construction of Functional Area 109 –Classroom as an addition to the school building. This effort includes, but is not limited to, building system and materials, exterior construction work, interior construction work, sinage, final clean-up, structural requirements, electrical and communications requirements, and mechanical requirements. This work shall include all applicable demolition and removals work to support the work elements contained in this item. This item excludes all work included in Base Items 0001 and 0002 and Option Items 0003 - 0006, 0008 - 0014.

Option 6: Item 0008: Classroom (FA 110)

Unit of Measure: Job.

Payment will be made for costs associated with design and construction of Functional Area 110 –Classroom as an addition to the school building. This effort includes, but is not limited to, building system and materials, exterior construction work, interior construction work, sinage, final clean-up, structural requirements, electrical and communications requirements, and mechanical requirements. This work shall include all applicable demolition and removals work to support the work elements contained in this item. This item excludes all work included in Base Items 0001 and 0002 and Option Items 0003 - 0007, 0009 - 0014.

Option 7: Item 0009: Classroom (FA 111)

Unit of Measure: Job.

Payment will be made for costs associated with design and construction of Functional Area 111 –Classroom as an addition to the school building. This effort includes, but is not limited to, building system and materials, exterior construction work, interior construction work, sinage, final clean-up, structural requirements, electrical and communications requirements, and mechanical requirements. This work shall include all applicable demolition and removals work to support the work elements contained in this item. This item excludes all work included in Base Items 0001 and 0002 and Option Items 0003 - 0008, 0010 - 0014.

Option 8: Item 0010: Classroom (FA 112)

Unit of Measure: Job.

Payment will be made for costs associated with design and construction of Functional Area 112 –Classroom as an addition to the school building. This effort includes, but is not limited to, building system and materials, exterior construction work, interior construction work, sinage, final clean-up, structural requirements, electrical and communications requirements, and mechanical requirements. This work shall include all applicable demolition and removals work to support the work elements contained in this item. This item excludes all work included in Base Items 0001 and 0002 and Option Items 0003 – 0009, 0011 - 0014.

Option 9: Item 0011: Home skills Classroom

Payment will be made for costs associated with design and construction of Functional Area 113 – home skills classroom as an addition to the school building. This effort includes, but is not limited to, building system and materials, exterior construction work, interior construction work, sinage, final clean-up, structural requirements, electrical and communications requirements, and mechanical requirements. This work shall include all applicable demolition and removals work to support the work elements contained in this item. This item excludes all work included in Base Items 0001 and 0002 and Option Items 0003 - 0010, 0012 - 0014.

Option 10: Item 0012: Conference room for 50 people

Payment will be made for costs associated with design and construction of Functional Area 122 – conference room for 50 people as an addition to the school building. This effort includes, but is not limited to, building system and materials, exterior construction work, interior construction work, sinage, final clean-up, structural requirements, electrical and communications requirements, and mechanical requirements. This work shall include all applicable demolition and removals work to support the work elements contained in this item. This item excludes all work included in Base Items 0001 and 0002 and Option Items 0003 - 0011, 0013 - 0014.

Option 11: Item 0013: Dining Hall

Unit of Measure: Job.

Payment will be made for costs associated with design and construction of Functional Area 114 – dining hall as an addition to the school building. This effort includes, but is not limited to, building system and materials, exterior construction work, interior construction work, sinage, final clean-up, structural requirements, electrical and communications requirements, and mechanical requirements. This work shall include all applicable demolition and removals work to support the work elements contained in this item. This item excludes all work included in Base Items 0001 and 0002 and Option Items 0003 - 0012, and 0014.

Option 12: Item 00014: Guard Room

Payment will be made for costs associated with design and construction of Functional Area 117 – guard room as an addition to the school building. This effort includes, but is not limited to, building system and materials, exterior construction work, interior construction work, sinage, final clean-up, structural requirements, electrical and communications requirements, and mechanical requirements. This work shall include all applicable demolition and removals work to support the work elements contained in this item. This item excludes all work included in Base Items 0001 and 0002 and Option Items 0003 - 0013.

-- End of Section --