ATTACHMENT 6 PERFORMANCE REQUIREMENT SUMMARY.pdf

PDF 428 KB Posted

Attached to
Refuse and Recycling Collection for USCG Elizabeth City NC
Solicitation number
70Z08422QPEC08000
Issued by

About this file

This solicitation is for refuse and recycling collection and disposal services at the United States Coast Guard base in Elizabeth City, North Carolina. The services include collecting and disposing of refuse materials on an established schedule, maintaining equipment in proper working order, cleaning up any spills, returning containers to their original locations, correcting missed pickups within 24 hours, and performing required container deliveries and disposal. Quotes are due by December 1, 2021 and will be evaluated based on price and technical acceptability. The contract term is one base year starting January 1, 2022 with four one-year option periods extending through December 31, 2026. The solicitation includes the performance work statement specifying all service requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REFUSE AND RECYCLING COLLECTION AND DISPOSAL SERVICES

USCG BASE ELIZABETH CITY, NC

70Z08422QPEC08000

ATTACHMENT 6

PERFORMANCE REQUIREMENT SUMMARY

1. The Government expects the Contractor to perform all services required in the Performance Work

Statement (PWS) at an acceptable level. Whenever the Government learns of substandard performance, either through periodic inspections, direct observation, customer complaints, or any other mechanism, the preferred course of action will be discussions with the Contractor to inform the Contractor of a problem. Discussions should effectively prevent recurrences of substandard performance. However, this

Performance Requirement Summary (PRS) provides an alternative mechanism by which the

Government’s payment to the Contractor may be reduced in the event of substandard performance.

2. Criteria for acceptable and unacceptable levels of performance are as follows: Certain tasks will be considered critical to the Government’s performance of its duty to its personnel as well as for safety, well being and health and welfare. Because of this, the Government has listed certain tasks as critical and must be completed properly every time as scheduled. Coast Guard Base Elizabeth City, NC identified the below listed items as critical contract requirements:

Performance Objectives PWS Paragraph

Collect and dispose of refuse materials in accordance with the established schedule.

5.9, 5.10, ATT 1

Maintain equipment in proper working. Vehicles shall be washed and free of odors.

5.7, 5.8.3

All spillage, which is any refuse dislodged from containers and/or solid waste collecting equipment in the course of collection and disposal, removed. Containers returned to original location in an upright position with lids securely in place.

5.8.3, 5.7

Correct missed pickups within 24 hours. 5.14

Perform Requirements Work container deliveries and disposal as required by the COR.

3.2, 3.3, 5.6

The standards for the above items must not exceed 2 defects per month because of this criticality. All other tasks per the contract may have up to 4 defects and will still be considered acceptable. However, any complaints received thereafter will cause the services to be unacceptable for that month.

3. The Government’s primary quality assurance procedures are based on validated customer complaints and periodic inspections by the Contracting Officer’s Representative (COR). One complaint will be counted for each reported and verified unacceptable performance of service (as listed in the PWS).

Thus, if one person complains that the 6 cubic yard container outside the galley was not emptied during a one week period and that the immediate vicinity of any containers was not cleaned during collection, this would count as two complaints, one for each unsatisfactory performance of service. However, if two different people complain about the same 6 cubic yard container outside the galley not emptied during a one week period; this would only count as one complaint because both complaints stemmed from the same unsatisfactory performance.

4. When the number of defects in the Contractor’s performance exceeds the allowable number of defects, the COR shall initiate a Contract Discrepancy Report (CDR). In response to the CDR the

Contractor will be required to explain, in writing, why performance was unsatisfactory, how performance will be returned to satisfactory levels, and how recurrence of the problem will be prevented. The Contractor’s payment shall be 25% of one days pay. If the Contractor is required to rework services found by the Government to be unsatisfactory, it will be at the contractor’s expense.

5. The Contractor shall be paid for all work performed to the contract standards. Monthly payment may be reduced for unsatisfactory performance, using the following computations:

Example: The Contractor performs required services during the month. The COR receives 4 complaints in a non-critical area. These 4 errors computer as unacceptable. The COR takes the Contract Price (Total invoiced amount for the month) and divides it by the number of days worked that month; then multiplies that number by the deduction rate (25%) which becomes the deduction for that month.

Contract Price: $1,000.00/4 times in the month = $250.00 X 25% = $62.50

6. A defect will not be counted when the service is re-performed within 2 hours after notification by the

COR and receives an acceptable rating by the COR.

7. Deductions shall not be deemed to waive or limit any right of the Government under the clauses entitled “Default” and “Inspection of Services”.

8. If more than 4 deductions are taken per fiscal year, Contractor Performance Evaluations may reflect poor performance ratings.

CONTRACT DISCREPANY REPORT (CDR)

1. Contract No._______________DO#___________2. FY________3. Report # _____

4. TO: (Contractor)________________________________________

5. FROM: (COR) _____________________________________________

6. DATES: Prepared | Oral Notification | Returned by Contractor | Action Complete

7. Discrepancy or Problem [Describe in detail; include references to PWS paragraph or other contract clause or provision; attach continuation sheet if necessary; COR shall cite applicable QC program procedure(s)] ------------------------------------------------------------------------------------------------------------

8. TO: (COR)_____ _____________________________________

9. FROM: (Contractor)________________________________________________

10. Contractor’s response as to cause, corrective action and actions to prevent reoccurrence (attach continuation sheet if necessary):

11. Signature of Contractor’s Representative:

________________________________________________Date____________________

12. Government Evaluation; acceptance, partial acceptance, rejection (attach continuation sheet if necessary):

13. Government Actions: payment deductions, performance evaluation meetings, other actions)

14. Close-out Actions (contractor notified; by whom/date; follow-up actions pending):

File details come from the government source that posted it. Updated .