Attachment 6 - GSA R8 Object Naming Submittal Template v3.xlsx
XLSX spreadsheet 57 KB Posted
- Solicitation number
- 47PJ0025R0014
About this file
This is a template spreadsheet file for submitting Building Automation System (BAS) object naming conventions to GSA. The template requires contractors/vendors to document existing object names, descriptions, object types, engineering units, and proposed new standardized names that comply with GSA's Data Normalization for Building Automation Systems standard.
The template includes fields for trend logging specifications (5-min intervals, 15-min intervals, or Change of Value), alarm configurations, and remote notifications. GSA reviewers use the template to approve, reject, or request clarification on proposed names. The document emphasizes that contractors must obtain GSA approval for naming conventions prior to implementation, as non-compliance may result in additional costs that will be the contractor's responsibility. While this template appears related to a courthouse project in Sioux Falls, SD, it is a standard GSA form not specific to that project's scope of work.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Object Naming Submittal
| Contractor/Vendor | GSA OFM BAS | |||||||
| Existing Object | Object Description | Object Type | Eng Units | Proposed Object Name | Trend Log (Int/COV) | Alarm | ||
| (Yes/No) | Remote Notification | |||||||
| (Yes/No) | Vendor Comment | GSA Comment | Status |
EXAMPLE Object Naming Submittal
| Contractor/Vendor | GSA OFM BAS | |||||||||
| Existing Object | Object Description | Object Type | Eng Units | Proposed Object Name | Trend Log (Int/COV) | Alarm | ||||
| (Yes/No) | Remote Notification | |||||||||
| (Yes/No) | Vendor Comment | GSA Comment | Status | |||||||
| A01SAT | Discharge temp | AI | ⁰F | CO0516_A01_SATmp | 5-min int | Yes | No | Approved | ||
| A01SSP | Static press | AI | "WC | CO0516_A01_SSP | 5-min int | No | No | CO0516_A01_SA StPrs | Approved as noted | |
| A01SAS | sp | CO0516_A01_SAS | COV | No | No | need more info | Rejected | |||
| BA3EN | econ oa sp | BV | ⁰F | CO0519_A03_EconTmpSp | COV | No | No | CO0519_A03_OAEconTmpSp | Approved as noted | |
| BA3RT2 | room 1004 temp | AI | ⁰F | CO0519_R1004_RmTmp | 5-min int | Yes | Yes | Approved | ||
| A01SPG | static P gain | AV | P gain | CO0516_A01_SA StPrsLpPGain | NA | No | No | Approved | ||
| A01SIG | static I gain | AV | I gain | CO0516_A01_SA StPrsLpIGain | NA | No | No | Approved |
HELP
| Section/Field | Description |
| Contractor/Vendor | This section is to be completed by the contractor/vendor |
| Existing Object | This field should contain the existing name of an object that is to be re-named - this field does not apply to new construction, only to retrofits and upgrades |
| Object Description | This field should contain a description of the object that will allow the GSA reviewer/approver to determine if the Proposed Object Name is compliant with the GSA Data Normalization for Building Automation Systems standard and appropriate for the object |
| Object Type | This field should contain the type of object: AI, AO, AV, BI, BO, BV, MO, MV, Schedule, Calendar, Trend Log, Notification Class, Event Enrollment, File, Command |
| Eng Units | Correct engineering units for the object, scaled correctly |
| Proposed Object Name | This field should contain the GSA Data Normalization for Building Automation Systems standard-compliant object name that the contractor/vendor has determined is appropriate for the object |
| Trend Log | This field should be used to indicate the configuraiton of the trend log for a control point object: 5-min int, 15-min int, COV, etc. All physical control points, effective setpoints, and mode points shall be trended. If the object will not be trended, use NA. |
| Vendor Comment | This field is provided for any comments the contractor/vendor wants to transmit |
| GSA OFM BAS | This section is to be completed by GSA OFM BAS Team |
| GSA Comment | The GSA reviewer/approver will use this field to provide comments/direction to the contractor/vendor |
| Status | This field will contain the current status of the proposed name: Rejected, Clarification |
Refer to GSA Data Normalization for Building Automation Systems for naming and metadata tagging requirements for BAS devices and objects. The latest version of this document can be obtained from GSA by requesting it from the GSA PBS OFM BAS team or from the GSA Project Manager.
Failure to conform to GSA standards and specifications may result in additional costs. The BAS contractor/vendor is liable for these costs; GSA is NOT RESPONSIBLE for projects costs associated with correcting device and/or object naming that does not conform to GSA standards. The contractor/vendor is strongly urged to submit naming and obtain GSA approval prior to implementation.
ESRI_MAPINFO_SHEET
DO NOT EDIT
For Esri use only
File details come from the government source that posted it. Updated .