Attachment_6_Generator usage log.pdf
PDF 107 KB Posted
- Solicitation number
- N6660426Q0291
About this file
This document is a Contractor Monthly Fuel Usage Log form required by the NUWC Division Newport for tracking generator fuel consumption. The form is designed for contractors operating generators on NUWC projects and must be submitted monthly no later than the 10th day of the following month, or upon project completion, whichever occurs first.
The form requires submission of generator specifications including company name, submitter information, generator location, make and model number, capacity in kilowatts, fuel rate in gallons per hour, and fuel type (gasoline, diesel, or propane). Contractors must document the purpose of each generator and provide monthly fuel usage data either through hour meter readings (meter start and end readings) or total monthly fuel usage in gallons if an hour meter is not available. A 12-month tracking table is provided for recording January through December data by year. According to the notes section, recordkeeping is required under NUWC's Air Emissions Cap Permit issued by the Department of Environmental Management's Office of Air Resources. Non-road engines that remain onsite for longer than 12 months are classified as stationary and require a permit if greater than 50 horsepower. The form explicitly excludes self-propelled mobile non-road engines from tracking requirements. The document is unclassified and identified as form NUWCDIVNPT 5090/8 (NOV-2024).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .