This document contains a proposed progress schedule template for the Round Hill Pines Cabin Stabilization Project under solicitation number 12970223Q0086 from the USDA Forest Service Lake Tahoe Basin Management Unit. The schedule template includes blocks to identify the total contract time in days, planned completion percentages at 20%, 40%, 60%, 80%, and 100% completion, and spaces for the contractor to chart planned progress through each work item over the course of the project. The contracting officer's representative is required to review and approve the schedule, monitor actual progress against planned progress, and advise the contracting officer of any delays.
Text of this file
USDA Forest Service R2-FS-6300-7 (Rev 2/81)) MS Word 2000
PROPOSED PROGRESS SCHEDULE
PROJECT
Round Hill Pines Cabin Stabilization Project
UNIT
Lake Tahoe Basin Management Unit
CONTRACT NO.
TBD
CONTRACT TIME
Compute Time Per Square as follows:
Total Time ( ) days = ( ) days per square Item of Work
% Completion Days Contract Time
INSTRUCTIONS
SUBMITTED BY:
REVIEWED AND APPROVED:
CONTRACTOR
1 Complete CONTRACT TIM block above to determine days per square
2 Insert contract days in brackets at 20%, 40%, etc.
3 Show line through each square for work planned. Please do not block in solid.
4. Submit ONE copy to C.O.R.
Contractor Contracting Officer’s Representative
Date C.O.R.
REVIEWED
1 Approve schedule or submit to C.O. with comments
2 Chart actual progress against proposed progress
3 Advise C.O. when progress falls behind By
4 Distribute as follows: Original to C.O. copies to Contractor, C.O.R. Forest
Date Contracting Officer
Date
GPO 830-257
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 5 - Past Performance References.docx | DOCX document | |
| Attachment 3 - Schedule of Items.xlsx | XLSX spreadsheet | |
| Attachment 7 - DBA Wage Determination.pdf | ||
| 12970223Q0086 Round Hill Pines Cabin Stabilization Solicitation.pdf | ||
| Attachment 1 - Round Hill Pines Cabin Stabilization Project Specs.pdf | ||
| Attachment 8 - BiobasedStatementLetter.docx | DOCX document | |
| Attachment 4 - Project Location Map.jpg | JPG image | |
| Attachment 10 - FSSS Round Hill Pines Cabins 2023.docx | DOCX document | |
| Attachment 2 - Round Hill Pines Cabin Project Drawings.pdf | ||
| Attachment 9 - DesignationofReps.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .