Attachment 6 Environmental Considerations and FAR Clause Checklist.pdf
PDF 126 KB Posted
- Attached to
- Repair Sewer Lateral, Building 106
- Solicitation number
- FA875121B0008
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number:
Project Title:
This requirement was reviewed by RIOCV on The following requirements have been found:
Clause/Provision Question YES NO
52.223-1 and 52.223-2
Will the contract involve use of USDA-designated items?
52.223-3, 52.223-
Will the contract require the delivery of hazardous materials as defined in FAR 23.301?
52.223-5 Are any EPCRA defined items, such as contractor equipment using non-commodity batteries, required as part of this contract?
52.223-4 and 52.223-9
Will the project require delivery or specify use of EPA-designated items containing recovered materials?
52.223-11 Does the project provide items that may contain or be manufactured with ozone-depleting substances?
52.223-12 Does the contract include the maintenance, repair, or disposal of any equipment or appliance using ozone-depleting substances as a refrigerant?
52.223-15 Will energy-consuming products listed in the ENERGY STAR Program or FEMP be delivered/acquired/furnished?
52.223-17 Will the project involve the use of EPA-designated items?
52.223-7 Will Radioactive Materials be required as part of the contract?
AFRL/RI ACM
Free Materials
Does this contract involve building materials for a construction, renovation or modernization project?
Additional Environmental Considerations:
40 CFR Part 1500-1598
Has an AF Form 813, required by the National Environmental Protection Act been filed and approved? (A 332 with Environmental Impact box checked OR Form 4 with Categorical Exclusion applied, are acceptable forms to be used for NEPA analysis)
AFMAN 32-7002
5.4.1.1
Will this contract generate solid, hazardous, universal, or construction & demolition waste?”
AFI 32-9005/
UFC 1-300-08
Does this contract require the installation, removal or modification to any real property? If yes, DD 1354 will be required.
NOTE: While it is RIOC’s responsibility to provide environmental procurement information to RIK, it is RIK’s responsibility for reviewing this document and determining if the checked FAR clauses are correct.
Environmental Planning Function/RIOCV
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Date28_af_date: |
| Text29: |
| Text30: |
| RIOCV Notes: |
File details come from the government source that posted it. Updated .