This document is Attachment 6.3 - Cost Proposal and Scoring Guide for the Tennessee Administrative Office of the Courts (AOC), part of a Request for Proposals (RFP) for a statewide Case Management System (CMS) and eFiling Application. The RFP seeks a comprehensive commercial off-the-shelf (COTS) Software as a Service (SaaS) solution to replace existing disparate case management systems across Tennessee's 95 counties and 32 judicial districts, serving approximately 400 courts with 238 clerks and 319 judges. The solicitation requires detailed cost proposals across multiple implementation stages, including initial build, phased rollout, recurring charges, local integrations, and change orders, with pricing to be submitted for a 10-year contract term. Vendors must provide fixed-fee costs for implementation services, annual software and licensing fees, hosting costs, maintenance expenses, and unit pricing for local integrations categorized as Simple, Moderate, and Complex.

The cost proposal spreadsheet is structured to capture comprehensive pricing details, with separate tabs for implementation services, recurring charges, local integrations, and change orders. Respondents are required to provide firm pricing throughout the agreement's term, with costs to be entered for each year of the contract across various service categories. The evaluation will use a scoring methodology that applies specific factors to each cost component, with the total evaluation cost amount determining the Cost Proposal Score. The document emphasizes that the evaluation factors do not guarantee specific purchase volumes or create entitlement rights, and the state retains discretion in requesting services. A rate card for supplemental services is also included, allowing for optional future services with capped hourly rates for different job classifications.

View the file

Other files

File Type Posted
Appendix_C.pdf PDF
RFP_30227-00725_Amd_3-FINAL_9_11_25.pdf PDF
Attachment_6.3-Cost_Proposal_Scoring_Guide.xlsx XLSX spreadsheet
RFP_30227-00725_Amd_1.pdf PDF
Appendix_F%20-Legacy_CMS_List.xlsx XLSX spreadsheet
RFP_30227-00725_CMS_and_eFiling_Application_FINAL.pdf PDF
Appendix_B-Revised_8-29-2025.xlsx XLSX spreadsheet
Appendix_D_Chart_of_Accounts.pdf PDF
Appendix_A_Use%20Cases.pdf PDF
Appendix_C.pdf PDF
Attachment_6.3-Cost_Proposal_Scoring_Guide.xlsx XLSX spreadsheet
Appendix_F%20-Legacy_CMS_List.xlsx XLSX spreadsheet
RFP_30227-00725_Amd_4.pdf PDF
RFP_30227-00725_Amd_3-FINAL_9_11_25.pdf PDF
Appendix_A_Use%20Cases.pdf PDF
Attachment_6.3-Cost_Proposal_Scoring_Guide.xlsx XLSX spreadsheet
RFP_30227-00725_Amd_5.pdf PDF
RFP_30227-00725_Amd_1.pdf PDF
Appendix_B-Revised_8-29-2025.xlsx XLSX spreadsheet
Appendix_F%20-Legacy_CMS_List.xlsx XLSX spreadsheet
RFP_Attachment_6.6-Revised_8-29-25.xlsx XLSX spreadsheet
Appendix_C.pdf PDF
Appendix_F%20-Legacy_CMS_List.xlsx XLSX spreadsheet
RFP_Attachment_6.6-Revised_8-29-25.xlsx XLSX spreadsheet
Appendix_A_Use%20Cases.pdf PDF
Appendix_E_-_Chart_of_TN_counties_pop_CMS_current.pdf PDF
RFP_30227-00725_Amd_1.pdf PDF
Appendix_A_Use%20Cases.pdf PDF
Attachment_6.3-Cost_Proposal_Scoring_Guide.xlsx XLSX spreadsheet
Appendix_D_Chart_of_Accounts.pdf PDF
Appendix_B-Revised_8-29-2025.xlsx XLSX spreadsheet
Appendix_C.pdf PDF
Appendix_F%20-Legacy_CMS_List.xlsx XLSX spreadsheet
RFP_30227-00725_Amd_2.pdf PDF
Appendix_C.pdf PDF
RFP_Attachment_6.6-Revised_8-29-25.xlsx XLSX spreadsheet
Appendix_F%20-Legacy_CMS_List.xlsx XLSX spreadsheet
RFP_30227-00725_Amd_1.pdf PDF
Attachment_6.3-Cost_Proposal_Scoring_Guide.xlsx XLSX spreadsheet
RFP_30227-00725_Amd_1.pdf PDF
RFP_Attachment_6.6-Revised_8-29-25.xlsx XLSX spreadsheet
Appendix_A_Use%20Cases.pdf PDF
Appendix_D_Chart_of_Accounts.pdf PDF
Appendix_F%20-Legacy_CMS_List.xlsx XLSX spreadsheet
RFP_30227-00725_CMS_and_eFiling_Application_FINAL.pdf PDF
Appendix_A_Use%20Cases.pdf PDF
Appendix_D_Chart_of_Accounts.pdf PDF
Attachment_6.3-Cost_Proposal_Scoring_Guide.xlsx XLSX spreadsheet
RFP_Attachment_6.6-Requirements_Traceability_Matrix.xlsx XLSX spreadsheet
RFP_30227-00725_CMS_and_eFiling_Application_FINAL.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Notice

RFP ATTACHMENT 6.3.
COST PROPOSAL & SCORING GUIDE
NOTICE: THIS COST PROPOSAL MUST BE COMPLETED EXACTLY AS REQUIRED
COST PROPOSAL SCHEDULE— The Cost Proposal, detailed below, shall indicate the proposed price for providing goods or services as defined in the Scope of Work of the RFP Attachment 6.7., Pro Forma Contract and for the entire contract period. The Cost Proposal shall remain valid for at least 120 days subsequent to the date of the Cost Proposal opening and thereafter in accordance with any contract resulting from this RFP. All monetary amounts shall be in U.S. currency and limited to two (2) places to the right of the decimal point.
NOTICE:
The Evaluation Factor associated with each compensable unit is for evaluation purposes only. The evaluation factors do NOT and should NOT be construed as any type of volume guarantee or minimum purchase quantity. The evaluation factors shall NOT create rights, interests, or claims of entitlement in the Respondent.
Notwithstanding the cost items herein, pursuant to the second paragraph of the Pro Forma Contract, Section C.1. (refer to RFP Attachment 6.7.), the State is under no obligation to request any goods or services from the Contractor in any specific dollar amounts or to request any goods or services at all from the Contractor during any period of this Contract.
This Cost Proposal worksheet must be converted to pdf and signed, physically or via e-signature, in the space below, by an individual empowered to bind the Respondent to the provisions of this RFP and any contract awarded pursuant to this RFP. If the individual signing this Cost Proposal is not the President or Chief Executive Officer, the Respondent must attach evidence to the Cost Proposal showing the individual’s authority to legally bind the Respondent.
RESPONDENT SIGNATURE:
PRINTED NAME & TITLE:
DATE:
RESPONDENT LEGAL ENTITY NAME:

Instructions

Attachment 6.3 - Cost Proposal and Scoring Guide Details
Workbook Instructions
This MS Excel Workbook contains a set of worksheets which must be completed to build the Respondent's Cost Proposal for the Solution.

tc={2B4A93E5-D037-4556-8FEA-FB4366DDFB3E}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

There are no Cost Term descriptions in the Pro Forma that I could find.

Table of Contents
Worksheet TitleDescription
1. Summary DashboardThis tab provides a calculated summary of total cost.

Respondent will not be able to enter any data on this Tab.

2. Implementation ServicesRespondent must provide the annual fixed-fee costs for each line item of Implementation Services incurred for implementation of the CMS and eFiling Application based on the proposed deployment schedule.
3. Recurring ChargesRespondent must provide the anticipated annual costs associated with software and licensing, hosting, and ongoing maintenance for the CMS and eFiling Application based on the proposed deployment schedule.
4. Local IntegrationsRespondent must provide the total unit price for each court's local integrations (categroized as Simple, Moderate or Complex) with the CMS and eFiling Application.
5. Change OrdersRespondent must provide Change Order hourly rate to be used for Change Order work on the CMS and eFiling Application.
6. Rate Card and Court Implementation ServicesRespondent must provide yearly costs for the prescribed roles found in the rate card for optional supplemental services.

In addition, the Respondent shall provide the total implementation costs for each line of Implementation Services incurred for each category of courts (as defined by the Respondent; e.g. by population size of the county, court type (Chancery, Circuit, etc.), a combination, etc.). The total amount for all courts shall equal the total amount for Implementation Services reflected on Tab 2 reduced by the total amounts for the Initial Build of the CMS and eFiling Application.

Note: This Tab will not be evaluated as part of the RFP response.

There are no Cost Term descriptions in the Pro Forma that I could find.

1. Summary Dashboard

Note: This Tab is locked to Respondents.

The Solicitation Coordinator will enter Respondent Legal Entity Name in the box below.

This Tab calculates the total cost proposed by Respondent for CMS and eFiling Application.

RESPONDENT LEGAL ENTITY NAME:
Item Ref.6.3 — COST PROPOSAL & SCORING GUIDE
Cost Item DescriptionProposed Cost
Case Management System: Total Implementation Cost
$0.00
eFiling Application: Total Implementation Cost
$0.00
Case Management System: Software & Licensing
$0.00
eFiling Application: Software & Licensing
$0.00
Case Management System: Hosting
$0.00
eFiling Application: Hosting
$0.00
Case Management System: Maintenance & Operations
$0.00
eFiling Application: Maintenance & Operations
$0.00
Local Integration Services$0.00
Change Orders$0.00
State Only: TOTAL EVALUATION COST AMOUNT (sum of evaluation costs above):
The Solicitation Coordinator will use this sum and the formula below to calculate the Cost Proposal Score. Numbers rounded to two (2) places to the right of the decimal point will be standard for calculations.$0.00

2. Implementation Services

Respondents are to provide the cost for Implementation Services: Initial Build and Phased Rollout for CMS and eFiling Application below.

ONLY insert values in the respective white cells. Values in the green or gray-shaded cells are automatically calculated.

Additionally:

1. Respondents must ensure spreadsheet calculations are correct.

2. Respondents agree to maintain firm pricing throughout the agreement's term.

3. Respondents are required to complete the Step 1 - Implementation Costs - Initial Build section and Step 2 - Phased Rollout section

The costs for all services for which costs are not covered in other tabs of this spreadsheet shall be included in this spreadsheet and incorporated into one of the descriptions below.

Implementation Services - Court Management System
STEP 1 - Initial BuildState Use ONLY
Cost Item DescriptionYear 1Year 2Year 3SumEvaluation FactorEvaluation Cost

(sum x factor)

Project Management$0.00$0.00$0.00$0.001$0.00
Enterprise Analysis and Design$0.00$0.00$0.00$0.001$0.00
Initial Baseline Build (configuration)$0.00$0.00$0.00$0.001$0.00
Initial Baseline Build (statewide integrations and custom development)$0.00$0.00$0.00$0.001$0.00
Test/Demonstration of Initial Build$0.00$0.00$0.00$0.001$0.00
Initial Build Annual Costs$0.00$0.00$0.00
Initial Build Total Cost$0.00
STEP 2 - Phased RolloutState Use ONLY
Cost Item DescriptionYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10SumEvaluation FactorEvaluation Cost

(sum x factor)

Phase Management Plan(s)$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Phase Analysis and Design$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Phase Local Configuration$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Phase Data Migration$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Phase User Acceptance Testing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Phase Training and Knowledge Transfer$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Phase Cutover Readiness and Production Go-Live$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Phase Post Go-Live and Transition Support$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Phased Rollout Annual Cost$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Phased Rollout Total Cost$0.00
TOTAL CMS IMPLEMENTATION COST$0.00
Implementation Services - eFiling Application
STEP 1 - Initial BuildState Use ONLY
Cost Item DescriptionYear 1Year 2Year 3SumEvaluation FactorEvaluation Cost

(sum x factor)

Project Management$0.00$0.00$0.00$0.001$0.00
Enterprise Analysis and Design$0.00$0.00$0.00$0.001$0.00
Initial Baseline Build (configuration)$0.00$0.00$0.00$0.001$0.00
Initial Baseline Build (statewide integrations and custom development)$0.00$0.00$0.00$0.001$0.00
Test/Demonstration of Initial Build$0.00$0.00$0.00$0.001$0.00
Initial Build Annual Cost$0.00$0.00$0.00
Initial Build Total Cost$0.00
STEP 2 - Phased RolloutState Use ONLY
Cost Item DescriptionYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10SumEvaluation FactorEvaluation Cost

(sum x factor)

Phase Management Plan(s)$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Phase Analysis and Design$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Phase Local Configuration$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Phase Data Migration$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Phase User Acceptance Testing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Phase Training and Knowledge Transfer$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Phase Cutover Readiness and Production Go-Live$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Phase Post Go-Live and Transition Support$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Phased Rollout Annual Cost$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Phased Rollout Total Cost$0.00
TOTAL eFiling Application Implementation Cost$0.00

3. Recurring Charges

Respondents are to provide Recurring Costs for the CMS and eFIling Application below.

ONLY insert values in the respective white cells. Values in the green or gray-shaded cells are automatically calculated. Additionally:

1. Respondents must ensure spreadsheet calculations are correct.

2. Respondents agree to hold pricing firm throughout the term of the agreement.

tc={DA754154-977A-4ED9-9B1F-E5165DEB1393}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

To ensure we compare apples to apples, should we indicate when the vendor should assume these recurring charges go into affect? For example we can say, assuming Year 1 is once the first phased rollout/early adopter courts go-live and are formally transitioned from hypercare to ongoing support.

Recurring Charges - Case Management System
Proposed CostState Use ONLY
Cost Item DescriptionYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10SumEvaluation FactorEvaluation Cost

(sum x factor)

Software & Licensing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Hosting$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Maintenance & Operations$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Recurring Charges - eFiling Application
Proposed CostState Use ONLY
Cost Item DescriptionYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10SumEvaluation FactorEvaluation Cost
Software & Licensing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Hosting$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Maintenance & Operations$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.00

To ensure we compare apples to apples, should we indicate when the vendor should assume these recurring charges go into affect? For example we can say, assuming Year 1 is once the first phased rollout/early adopter courts go-live and are formally transitioned from hypercare to ongoing support.

4. Local Integrations

Respondents are to provide Local Integration pricing for the CMS and eFiling Application below.

Respondents are to provide Local Integration Unit Pricing for Simple, Moderate, and Complex Local Integrations (defined in Pro Forma Section A.2).

ONLY insert values in the respective white cells. Values in the green or gray-shaded cells are automatically calculated.

Respondents must ensure spreadsheet calculations are correct. Respondents agree to hold pricing firm throughout the term of the agreement.

Proposed Cost
Cost Item DescriptionEvaluation FactorEvaluation Cost
Simple Local Integration Unit Pricing$0.00175$0.00
Moderate Local Integration Unit Pricing$0.0035$0.00
Complex Local Integration Unit Pricing$0.0010$0.00
Total Local Integration Price$0.00

5. Change Orders

Respondents are to provide Change Order pricing for the CMS and eFiling Application below.

ONLY insert values in the respective white cells. Values in the green or gray-shaded cells are automatically calculated. Additionally:

1. Respondents must ensure spreadsheet calculations are correct.

2. Respondents agree to hold pricing firm throughout the term of the agreement.

Change OrdersState Use ONLY
Proposed CostSumEvaluation FactorEvaluation Cost
Change Orders - Hourly Rate$0.00$0.001000$0.00

6. Rate Card and Unit Pricing

1. Respondents are to provide their role rates for optional future services beyond those enumerated on the Implementation Services tab.

1a. Respondents must ensure that the quoted hourly rates remain capped throughout the duration of the agreement; rates provided serve as "maximum rates."

2. For the Court implementation costs, categorize the courts as you determine is most appropriate for pricing and for each category, complete the cost items for implementation of one such court and also list the number of courts in that category in the referenced column. Define the manner in which the courts are categorized. See Example for Category #1.

NOTE: This mandatory tab is not evaluated as part of the RFP response for Attachment 6.3 - Cost Proposal and Scoring Guide.

Rate Card - Supplemental Services
Year 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10
Job ClassifiationHourly RateHourly RateHourly RateHourly RateHourly RateHourly RateHourly RateHourly RateHourly RateHourly Rate
Project Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Business Analyst$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Architect$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Application Developer$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
QA/Tester$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Database Administrator$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Local Court Implementation Costs
Cost Item DescriptionUnit Cost# of courts in categoryTotal for All Courts
Court Category #1
Court Management Plan(s)$10.00
Court Analysis and Design$10.00
Court Local Configuration$10.00
Court Data Migration$10.00
Court User Acceptance Testing$10.00
Court Training and Knowledge Transfer$10.00
Court Cutover Readiness and Production Go-Live$10.00
Court Post Go-Live and Transition to Support$10.00
Court Initial Production Support and Maintenance$10.00
[Insert other if needed]$0.00
Total Costs$90.00111$9,990.00
Court Category #2
Court Management Plan(s)$0.00
Court Analysis and Design$0.00
Court Local Configuration$0.00
Court Data Migration$0.00
Court User Acceptance Testing$0.00
Court Training and Knowledge Transfer$0.00
Court Cutover Readiness and Production Go-Live$0.00
Court Post Go-Live and Transition to Support$0.00
Court Initial Production Support and Maintenance$0.00
[Insert other if needed]$0.00
Total Costs$0.000$0.00
Court Category #3
Court Management Plan(s)$0.00
Court Analysis and Design$0.00
Court Local Configuration$0.00
Court Data Migration$0.00
Court User Acceptance Testing$0.00
Court Training and Knowledge Transfer$0.00
Court Cutover Readiness and Production Go-Live$0.00
Court Post Go-Live and Transition to Support$0.00
Court Initial Production Support and Maintenance$0.00
[Insert other if needed]$0.00
Total Costs$0.000$0.00
Court Category #4
Court Management Plan(s)$0.00
Court Analysis and Design$0.00
Court Local Configuration$0.00
Court Data Migration$0.00
Court User Acceptance Testing$0.00
Court Training and Knowledge Transfer$0.00
Court Cutover Readiness and Production Go-Live$0.00
Court Post Go-Live and Transition to Support$0.00
Court Initial Production Support and Maintenance$0.00
[Insert other if needed]$0.00
Total Costs$0.000$0.00
Court Category #5
Court Management Plan(s)$0.00
Court Analysis and Design$0.00
Court Local Configuration$0.00
Court Data Migration$0.00
Court User Acceptance Testing$0.00
Court Training and Knowledge Transfer$0.00
Court Cutover Readiness and Production Go-Live$0.00
Court Post Go-Live and Transition to Support$0.00
Court Initial Production Support and Maintenance$0.00
[Insert other if needed]$0.00
Total Costs$0.000$0.00
Court Category #6
Court Management Plan(s)$0.00
Court Analysis and Design$0.00
Court Local Configuration$0.00
Court Data Migration$0.00
Court User Acceptance Testing$0.00
Court Training and Knowledge Transfer$0.00
Court Cutover Readiness and Production Go-Live$0.00
Court Post Go-Live and Transition to Support$0.00
Court Initial Production Support and Maintenance$0.00
[Insert other if needed]$0.00
Total Costs$0.000$0.00
ADD MORE CATEGORIES (IF NEEDED)

Define Category of Courts:

Example: Chancery Courts in counties with population between 100,000 to 500,000.

Court Category #1:

Court Category #2:

Court Category #3:

Court Category #4:

Court Category #5:

Court Category #6:

(add more if needed) delete.Deliverables Charges

Note: This tab is for deliverable pricing only.
Proposed CostState Use ONLY
Cost Item DescriptionSumEvaluation FactorEvaluation Cost
(sum x factor)
1. Program Management Plan$0.001
2. Project Management Plan$0.00
3. Project Deployment Plan$0.00
4. Baseline Project Schedule$0.00
5. Configuration Management Plan$0.00
6. Stakeholder Engagement Plan$0.00
7. Elaborated Requirements Traceability Matrix$0.00
8. Future-state Solution Documentation$0.00
9. Solution Implementation Plan$0.00
10. Local Jurisdiction Configuration Plan$0.00
11. Integration Strategy$0.00
12. Implementation Progress Report$0.00
13. Cutover Plan$0.00
14. Data Conversion/Migration Plan$0.00
15. Test Plan$0.00
16. Test Scripts$0.00
17. System Test Results$0.00
18. Final System Testing Results$0.00
19. UAT Results$0.00
20. Training Plan$0.00
21. Training Curriculum and Materials$0.00
22. Training Completion Report$0.00
23. Readiness Report$0.00
24. Updated work products from the implementation for production$0.00
25. Final as-built configuration documentation$0.00
26. Cutover Completion Report$0.00
27. Updated Cutover Plan and Final Cutover Plan/Schedule$0.00
28. Service Level Performance Dashboard$0.00
29. Project Closeout Report$0.00
30. Monthly Production Support Templates$0.00

image1.png

File details come from the government source that posted it. Updated .