This document is an Architect's Supplemental Instructions (ASI) for the Reconfigure Outpatient Rehab Medicine project at the Olin E. Teague Veterans Center in Temple, Texas. The ASI, issued by Enapay, LLC, revises the project drawings and specifications to remove all project alternates, specifically affecting sheets A-000, A-001, and specification section 01 32 16.15. The revision is dated 03/24/2025 and is part of VA Project #674-21-101, indicating a modification to the original project scope to streamline the contract requirements.
The supplemental instructions detail comprehensive project scheduling requirements, including the contractor's responsibilities for developing and maintaining a Critical Path Method (CPM) plan, submitting monthly computer-produced time/cost schedules, and providing detailed project schedule updates. Key requirements include breaking work into activities/events of no more than 20 work days, submitting schedule changes within specified timeframes, and ensuring all general contractor and subcontractor work activities are included. The document emphasizes the need for precise schedule tracking, cost loading of activities, and coordination with the Contracting Officer's Representative (COTR) throughout the project lifecycle.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARCHITECT’S SUPPLEMENTAL INSTRUCTIONS
PROJECT: ASI NO: 02
Reconfigure Outpatient Rehab Medicine DATE OF ISSUE: 03/24/2025
VA Project #674-21-101
OWNER: ARCHITECT:
Olin E. Teague Veterans Center Enapay, LLC
1901 Veterans Memorial Drive 207 West Main Street
Temple, TX 76504 Mesquite, TX 75149
The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract documents.
Description:
Refer to attached Revision 02 drawings and specifications dated 03/24/2025 that contain Owner changes to remove all project alternates. Revision 02 drawings and specifications include the following sheets: A-000, A-001, and specification section 01 32 16.15.
Requested by: 03/24/2025
Mark D. McComas, PM