Attachment 6 ASI 02 REV 02 REMOVE ALTERNATES.pdf

PDF 8 MB Posted

Attached to
Y1DA--Reconfigure Outpatient Rehab Medicine 674-21-101
Solicitation number
36C25725R0052_2
Issued by

About this file

This document is an Architect's Supplemental Instructions (ASI) for the Reconfigure Outpatient Rehab Medicine project at the Olin E. Teague Veterans Center in Temple, Texas. The ASI, issued by Enapay, LLC, revises the project drawings and specifications to remove all project alternates, specifically affecting sheets A-000, A-001, and specification section 01 32 16.15. The revision is dated 03/24/2025 and is part of VA Project #674-21-101, indicating a modification to the original project scope to streamline the contract requirements.

The supplemental instructions detail comprehensive project scheduling requirements, including the contractor's responsibilities for developing and maintaining a Critical Path Method (CPM) plan, submitting monthly computer-produced time/cost schedules, and providing detailed project schedule updates. Key requirements include breaking work into activities/events of no more than 20 work days, submitting schedule changes within specified timeframes, and ensuring all general contractor and subcontractor work activities are included. The document emphasizes the need for precise schedule tracking, cost loading of activities, and coordination with the Contracting Officer's Representative (COTR) throughout the project lifecycle.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARCHITECT’S SUPPLEMENTAL INSTRUCTIONS

PROJECT: ASI NO: 02

Reconfigure Outpatient Rehab Medicine DATE OF ISSUE: 03/24/2025

VA Project #674-21-101

OWNER: ARCHITECT:

Olin E. Teague Veterans Center Enapay, LLC

1901 Veterans Memorial Drive 207 West Main Street

Temple, TX 76504 Mesquite, TX 75149

The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract documents.

Description:

Refer to attached Revision 02 drawings and specifications dated 03/24/2025 that contain Owner changes to remove all project alternates. Revision 02 drawings and specifications include the following sheets: A-000, A-001, and specification section 01 32 16.15.

Requested by: 03/24/2025

Mark D. McComas, PM

File details come from the government source that posted it. Updated .