Attachment 6 - AMKUS PM Tasking.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- SP330022Q0053
- Issued by
-
Defense Logistics Agency Distribution
About this file
This document contains a preventative maintenance task list and related federal contract opportunity for fire truck, apparatus, and equipment maintenance services. The maintenance task list outlines semi-annual and annual preventative maintenance tasks for various Amkus hydraulic rescue equipment, including testing hoses and reels for leaks and proper operation, pressure testing and inspecting power units, sharpening or replacing blades, and inspecting rams and hoses. The related federal contract opportunity is soliciting quotes for preventative and remedial maintenance services for government-owned fire trucks, equipment, and apparatus located at the Defense Logistics Agency Distribution facility in Susquehanna, Pennsylvania, on a hybrid firm-fixed-price and time-and-materials contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 SCHEDULE OF SUPPLIES SERVICES RFQ SP3300-22-Q-0053.pdf | ||
| Attachment 7 - Pierce Maint Task List.xlsx | XLSX spreadsheet | |
| Attachment 5 - Ingersol-Rand Cyclone System PM Tasking.xlsx | XLSX spreadsheet | |
| CSS SP330022Q0053.docx | DOCX document | |
| Attachment 2 - Equip List.xlsx | XLSX spreadsheet | |
| Attachment 8 Wage Determination.pdf | ||
| Attachment 3 - DES-SP Fire Dept TruckKME.xlsx | XLSX spreadsheet | |
| Attachment 4 - DES-SP Fire Dept Mako Preventive Equipment Task List.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Preventive Maintenance Task List |
| Equipment: Amkus Ultimate Power Tool System |
Frequency
| Semi-Annual | Annual | |
| ULTIMATE SYSTEM | ||
| Pressure test all hose reels/adjust as needed | X | |
| Test lines for proper time/adjust as needed | X | |
| Inspect entire system for leaks | X | |
| Inspect coolant fans | X | |
| Verify penant control is working properly | X | |
| GAS POWER UNIT | ||
| Pressure test and time pump | X | |
| Remove engine from pump | X | |
| Remove all gaskets from reservior, drain and clean reservoir | X | |
| Drain engine oil and remove spark plug | X | |
| Install new engine oil and new spark plug | X | |
| Inspect drive coupler/replace as needed | X | |
| Apply sealant to reservior gasket, place gaskets on reservoir, fill reservoir with new Amkus oil. | X | |
| Reassemble engine and pump | X | |
| Run power unit to verify proper operation | X | |
| Test pressure and time/adjust as needed | X | |
| Check for fluid leaks | X | |
| ELECTRIC POWER UNIT | ||
| Test generator for proper voltage (240 volts) | X | |
| Pressure test and time pump | X | |
| Remove motor from pump | X | |
| Remove all gaskets from reservior, drain and clean reservoir | X | |
| Inspect drive coupler/replace as needed | X | |
| Apply sealant to gasket and place gasket on reservoir, fill reservoir with new Amkus oil | X | |
| Reassemble motor and pump | X | |
| Run power unit and verify proper operation | X | |
| Test pressure and time/adjust as needed | X | |
| Check for fluid leaks | X | |
| MINI POWER UNIT | ||
| Pressure test and time pump | X | |
| Drain engine oil and Amkus oil | X | |
| Remove and replace spark plug | X | |
| Refill engine oil and Amkus oil with new oil | X | |
| Run power unit and verify proper operation | X | |
| Test pressure and time/adjust as needed | X | |
| Check for fluid leaks | X | |
| SPREADER | ||
| Test tool for 10,500 PSI | X | |
| Remove rack guard, handle, pivot pins and spreader arms | X | |
| Clean and inspect all parts | X | |
| Remove control valve and manifold, inspect parts, replace all o-rings and reassemble | X | |
| Apply grease to rack, pivot pins and spreader arms; reassemble working end of tool | X | |
| Test tool for 10,500 PSI | X | |
| Check for fluid leaks | X | |
| Inspect pigtails and quick connect couplers | X | |
| CUTTERS | ||
| Test tool for 10,500 PSI | X | |
| Remove center bolt, friction plates and cutter blades; make sure end cap is tight | X | |
| Clean and inspect working end of tool and all parts | X | |
| Remove control valve and manifold; inspect parts and replace o-rings | X | |
| Reassemble control valve and manifold | X | |
| Inspect cutter blades/sharpen if necessary. Blades shall be sharpened using flat stone | X | |
| Grease center bolt, friction plates and cutter blades | X | |
| Reassemble working end of the tool | X | |
| Test tool for 10,500 PSI | X | |
| Check for fluid leaks | X | |
| Inspect pigtails and quick connect couplers | X | |
| COMBO TOOLS | ||
| Test tool for 10,500 PSI | X | |
| Remove center bolt, friction plates and combo blades | X | |
| Clean and inspect working end of tool and all parts | X | |
| Remove control valve and manifold; inspect parts and replace o-rings. C15 only the control valve o-rings will be replaced. | X | |
| Reassemble control valve and manifold | X | |
| Inspect cutting edge on combo blades/sharpen cutting edge with flat stone if needed. | X | |
| Grease center bolt, friction plates and combo blades | X | |
| Reassemble working end of the tool | X | |
| Test for 10,500 PSI | X | |
| Check for fluid leaks | X | |
| Inspect pigtails and quick connect couplers | X | |
| RAMS | ||
| Test tool for 10,500 PSI | X | |
| Inspect ram for fluid leaks | X | |
| Inspect pigtails and quick connect couplers | X | |
| Verify the rod end will screw off cylinder rod | X | |
| HOSES: REEL/EXTENSION | ||
| Pressure test | X | |
| Check for leaks | X | |
| Check for damaged hose | X | |
| Check quick connect couplers | X | |
| If applicable, verify reel is operating properly and there are no leaks at the reel | X |
&P
Sheet2
Sheet3
File details come from the government source that posted it. Updated .