This memorandum of understanding outlines a proposed Battle Creek Chinook Salmon and Steelhead Restoration Project between various parties. Key details include that the project aims to restore salmonid habitat in Battle Creek through actions such as installing fish screens and ladders, decommissioning certain dams, and providing increased prescribed instream flows. The total estimated cost is $50.7 million to be funded through various sources including $27.1 million in federal funding, $20.5 million from PG&E, and $3 million from third party donors. The parties agree to coordinate planning, permitting, construction and long-term adaptive management through established teams. Monitoring responsibilities and funding are also delineated.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEMORANDUM OF UNDERSTANDING
by and among
NATIONAL MARINE FISHERIES SERVICE
U.S. BUREAU OF RECLAMATION
U.S. FISH AND WILDLIFE SERVICE
CALIFORNIA DEPARTMENT OF FISH AND GAME and
PACIFIC GAS AND ELECTRIC COMPANY
TO MEMORIALIZE THE AGREEMENT REGARDING THE PROPOSED BATTLE
CREEK CHINOOK SALMON AND STEELHEAD RESTORATION PROJECT,
LOCATED IN THE BATTLE CREEK WATERSHED IN TEHAMA AND SHASTA
COUNTIES, CALIFORNIA.
This Memorandum of Understanding (MOU), by and among the NATIONAL MARINE
FISHERIES SERVICE (NMFS), UNITED STATES BUREAU OF RECLAMATION (USBR),
UNITED STATES FISH AND WILDLIFE SERVICE (USFWS), CALIFORNIA
DEPARTMENT OF FISH AND GAME (CDFG), and PACIFIC GAS AND ELECTRIC COMPANY (PG&E), hereinafter collectively called the “Parties,” defines the Parties’ roles and responsibilities regarding actions that will be undertaken as part of the proposed Battle Creek Chinook Salmon and Steelhead Restoration Project (Restoration Project) and commitments regarding costs for and implementation of the Restoration Project.
TABLE OF CONTENTS
1.0 RECITALS
2.0 DEFINITIONS
3.0 PURPOSES
4.0 PROPOSED BATTLE CREEK CHINOOK SALMON AND STEELHEAD
RESTORATION PROJECT
5.0 CONTINGENCIES AND LIMITATIONS
6.0 ROLES AND RESPONSIBILITIES
7.0 MONITORING AND REPORTING
8.0 PLANNING, PERMITTING, AND CONSTRUCTION ACTIVITIES
9.0 ADAPTIVE MANAGEMENT
10.0 FUNDING
11.0 LEASES OR SALE OF FERC PROJECT NO. 1121
12.0 ENVIRONMENTAL LIABILITIES
13.0 AMENDMENT PROCESS
14.0 DISPUTE RESOLUTION
15.0 TERM
16.0 TERMINATION
17.0 SIGNATURES
1.0 RECITALS
This MOU is entered into with the following understandings:
1.1 Battle Creek is a tributary of the Sacramento River located in Tehama and Shasta Counties. This cold, spring-fed stream has exceptionally high flows during the dry season, making it important habitat for anadromous fish. Battle Creek may be the only remaining stream other than the main stem of the Sacramento River that can successfully sustain breeding populations of steelhead and all four runs of chinook salmon. Battle Creek is also unique and biologically important because it provides habitat opportunities during drought years for winter-run chinook salmon.
1.2 PG&E owns and operates several diversion facilities on the North and
South Forks of Battle Creek, including Coleman Diversion Dam, Inskip Diversion Dam, South Diversion Dam, Wildcat Diversion Dam, Eagle Canyon Diversion Dam, and North Battle Creek Feeder Diversion Dam, and dams on Ripley Creek, Soap Creek and Baldwin Creek, and controls the majority of the flows in the anadromous fish reaches of the Battle Creek watershed.
1.3 In 1997, in response to opportunities to apply for federal and state fish and wildlife resource restoration funds, the Battle Creek Working Group (BCWG), made up of representatives from the state and federal resource agencies and fishery, environmental, local, agricultural, power, and urban stakeholder communities, was formed to accelerate chinook salmon and steelhead restoration in the Battle Creek watershed. The BCWG provided technical advice for a plan developed under a CALFED Category III grant.
1.4 By participating in a cooperative process to restore Battle Creek, which avoids the conventional, adversarial, regulatory process, the Parties expect to realize the following benefits:
A. Restoration of self-sustaining populations of chinook salmon and steelhead and their habitat in the Battle Creek watershed through a voluntary partnership with state and federal agencies, a third party donor(s), and PG&E;
B. Up-front certainty regarding specific restoration components, including Resource Agency prescribed instream flow releases, selected decommissioning of dams at key locations in the watershed, dedication of water diversion rights for instream purposes at decommissioned sites, construction of tailrace connectors, and installation of Fail-Safe Fish Screens and Fish Ladders;
C. Timely implementation and completion of restoration activities;
and
D. Joint development and implementation of a long-term Adaptive
Management Plan with dedicated funding sources to ensure the continued success of restoration efforts under this partnership.
1.5 A negotiating team comprised of management representatives from
CDFG, NMFS, PG&E, USBR, and USFWS, met in the fall of 1998 and in early 1999 to pursue an agreement regarding a proposal for Battle Creek restoration actions. An Agreement in Principle among the Parties was entered into in February, 1999 (see Attachment 1).
1.6 Other actions to restore and enhance fish habitat are being implemented in the Battle Creek watershed that are not directly related to hydroelectric project operations (e.g., Coleman National Fish Hatchery actions and meadow restoration upstream of the natural barrier falls which preclude anadromous passage). These actions are outside the scope of the Restoration Project, but are considered important to the overall success of restoring anadromous fishery resources in the Battle Creek watershed.
1.7 Implementation of the Restoration Project will be consistent with the following restoration directives and programs:
• Central Valley Project Improvement Act (Public Law 102-575 Section 3401 et seq. (CVPIA)) Anadromous Fish Restoration Program;
• State Salmon, Steelhead Trout, and Anadromous Fisheries Program Act (State Senate Bill 2261, 1990) Central Valley Salmon and Steelhead Restoration and Enhancement Plan;
• National Marine Fisheries Service Recovery Plan for Sacramento River Winter-run Chinook Salmon;
• CALFED Ecosystem Restoration Program;
• Upper Sacramento River Fisheries and Riparian Habitat Management Plan (State Senate Bill 1086, 1989);
• Restoring Central Valley Streams – A Plan for Action (1993);
and
• Steelhead Restoration and Management Plan for California (1996).
One specific goal of both the CVPIA and State Senate Bill 2261 is doubling natural production of anadromous fish. Battle Creek has been identified as one of the Sacramento River tributaries where restoration activities have the potential to contribute materially to these goals.
1.8 The Parties are proposing a series of measures, described in this MOU as the Restoration Project, to establish a restoration program for chinook salmon and steelhead habitat in the reaches of Battle Creek below the natural water falls on the forks of Battle Creek that act as absolute barriers to fish passage (see Section 2.19). The Total Project Cost of the Restoration Project is estimated to be $50,709,000. Individual restoration actions under the Restoration Project will be based upon the best scientific and commercial information available. The Parties intend to implement the Restoration Project in the most efficient and cost effective manner consistent with achieving the benefits and goals articulated in Sections 1.4 and 1.7.
1.9 The Parties recognize the unique characteristics of Battle Creek regarding its importance in the restoration of chinook salmon and steelhead in the Sacramento River watershed. The Parties also acknowledge the current availability of public funding for anadromous fish restoration projects in the Central Valley, which funding has not been readily available in the past and may not be in the future. Based on this unique set of circumstances, the Parties recognize that all actions cooperatively pursued under the Restoration Project, including dam removal and public funding, will not set a precedent for future restoration actions in other watersheds.
1.10 USFWS is participating in the Restoration Project pursuant to the CVPIA, the Endangered Species Act (16 U.S.C. Sections 1531-1544, as amended (ESA)), Fish and Wildlife Coordination Act, Federal Power Act and the Fishery Conservation and Management Act (16 U.S.C. Sections 1801- 1882).
1.11 NMFS is participating in the Restoration Project pursuant to the ESA.
1.12 USBR is participating in the Restoration Project pursuant to the CVPIA and the California Bay-Delta Environmental Enhancement Act (P.L. 104- 333).
1.13 CDFG is participating in the Restoration Project based on its responsibilities as trustee agency for the fish and wildlife resources of California (Fish and Game Code Section 711.7(a)) and its jurisdiction over the conservation, protection, and management of fish, wildlife, native plants, and habitat necessary for biologically sustainable populations of those species (Fish and Game Code Section 1802), and other applicable state and federal laws.
1.14 PG&E is participating in the Restoration Project as owner and operator of the Battle Creek Hydroelectric Project (Federal Energy Regulatory Commission (FERC) Project No. 1121).
THEREFORE, the Parties hereby understand and agree as follows:
2.0 DEFINITIONS
The terms “CDFG”, “CVPIA”, “ESA”, “MOU”, “NMFS”, “Parties”, “Restoration Project”, “USBR”, and “USFWS” have the meanings set forth above.
For the purposes of this MOU, the following terms have the meanings set forth below:
2.1 "Adaptive Management" means an approach, as more specifically described in Section 9.0, that allows for changes to the Restoration Project that may be necessary in light of new scientific information regarding the biological effectiveness of the restoration measures.
2.2 "Adaptive Management Fund" means the Fund described in Section 9.2 B.
2.3 “Agencies” means CDFG, NMFS, USBR, and USFWS.
2.4 "Battle Creek Hydroelectric Project, FERC Project No. 1121" or "FERC Project No. 1121" means the hydroelectric development as described in the license issued by FERC on August 13, 1976 and as subsequently amended.
2.5 “CALFED” means the entity formed in 1995 by the cooperative effort among state and federal agencies and California’s environmental, urban, and agricultural communities to address environmental and water management problems associated with an intricate web of waterways created at the junction of the San Francisco Bay and the Sacramento and San Joaquin rivers and the watersheds that feed them and comprise CALFED’s solution area for the Bay-Delta system.
2.6 “CAMP” means the Comprehensive Assessment and Monitoring Program which has been established pursuant to Section 3406(b)(16) of the CVPIA.
2.7 “Consensus” means the unanimous agreement among the Parties.
2.8 "CPUC" means the California Public Utilities Commission.
2.9 "Decommission" means to fully remove all applicable facilities and return a site to an approximation of pre-existing conditions, subject to FERC approval. Decommissioning activities include, but are not limited to, developing a decommissioning plan, performing pre- and post-removal environmental studies, facility removal, environmental mitigation and restoration, erosion control, re-vegetation, environmental monitoring, and reporting.
2.10 “Fail-Safe Fish Ladder” means features inherent in the design of the ladder that ensure the structure will continue to operate to facilitate the safe passage of fish under the same performance criteria as designed under anticipated possible sources of failure.
2.11 “Fail-Safe Fish Screen” means a fish screen that is designed to automatically shut off the water diversion whenever the fish screen fails to meet design or performance criteria until the fish screen is functioning again.
2.12 “FERC” means the Federal Energy Regulatory Commission, the entity charged with implementing the Federal Power Act (16 U.S.C. 791 (a) et seq.) and the licensing of non-federal hydropower projects in jurisdictional waters of the United States.
2.13 “Final FERC Order” means a final order issued by FERC pursuant to an application filed by PG&E to amend the license for FERC Project No.
1121 to implement the applicable measures of this Restoration Project, after exhaustion of any administrative or judicial remedy.
2.14 “PG&E” means the Pacific Gas and Electric Company, and any lessee or successor owner of the Battle Creek Hydroelectric Project (FERC Project No. 1121).
2.15 “Purchased Water Cost” means the identified financial value of the prescribed instream flow releases provided by the Restoration Project in excess of the required flows stated in the license for FERC Project No.
1121 as of March 1, 1999.
2.16 "Ramping Rates" means moderating the rate of change of stream stage decrease in Battle Creek resulting from the operation of FERC Project No.
1121.
2.17 “Resource Agencies” means CDFG, NMFS, and USFWS.
2.18 "Restoration Project" means all measures set forth in the underlying Agreement in Principle (Attachment 1) as further developed in this MOU and having the purpose of restoring chinook salmon and steelhead habitat associated with FERC Project No. 1121, within the Restoration Project Area.
2.19 “Restoration Project Area” means the areas in and around the following
PG&E facilities: Coleman Diversion Dam, Inskip Diversion Dam, South Diversion Dam, Wildcat Diversion Dam, Eagle Canyon Diversion Dam, North Battle Creek Feeder Diversion Dam, and Asbury Pump Diversion Dam; Battle Creek, North Fork Battle Creek and South Fork Battle Creek, up to the natural barriers at 14 miles and 19 miles above the confluence, respectively; and Eagle Canyon Springs, Soap Creek (and Bluff Springs), Baldwin Creek, and Lower Ripley Creek and each of their adjacent water bodies.
2.20 "Total Project Cost" means all costs necessary to implement the
Restoration Project, including but not limited to: planning; permitting;
performing environmental and decommissioning studies; preparing a FERC license amendment application; designing, constructing, operating, maintaining and making periodic replacements for various facility additions (i.e., fish screens, fish ladders, connectors and appurtenant facilities) to FERC Project No. 1121; facility decommissioning, removal, and environmental restoration; facility and biological and environmental monitoring and reporting; Purchased Water Cost; and Adaptive Management planning, monitoring, and implementation costs.
2.21 "Water Acquisition Fund" means the Fund described in Section 9.2 A.
3.0 PURPOSES
The purposes of this MOU are:
3.1 To identify the series of measures comprising the proposed Restoration Project to be addressed in the NEPA/CEQA/ESA and other applicable environmental compliance and permitting processes;
3.2 To identify the roles and responsibilities of each of the Parties;
3.3 To identify contingencies and limitations of the Parties; and
3.4 To identify the scope of proposed FERC license terms and conditions for preparation of a separate license amendment application to be subsequently submitted to FERC to implement the proposed Restoration Project.
4.0 PROPOSED BATTLE CREEK CHINOOK SALMON AND STEELHEAD
RESTORATION PROJECT
The Parties understand and agree that all engineering and design work for facility modifications described in Section 4.1 below, including installation of fish screens and fish ladders, decommissioning dams and associated facilities, and installation of any connections between powerhouses and water conveyance facilities on the South Fork of Battle Creek, shall meet applicable CDFG, FERC, NMFS, PG&E, USBR, and USFWS standards.
The proposed Restoration Project includes the following:
4.1 Facility Modifications
A. Coleman Diversion Dam:
• Install a tailrace connector from Inskip Powerhouse to Coleman Canal and a water bypass facility around Inskip Powerhouse to Coleman Canal. The Inskip Powerhouse bypass facility will be the most economical alternative that still provides the functional equivalent of the existing Inskip Powerhouse bypass system and will deliver that system’s design flow of water to the Coleman Canal.
• Decommission the dam and appurtenant facilities.
B. Inskip Diversion Dam:
• Install a NMFS/CDFG approved Fail-Safe Fish Screen.
• Install a NMFS/CDFG approved Fail-Safe Fish Ladder.
• Install a tailrace connector from South Powerhouse to Inskip Canal concurrent with, or prior to, the Inskip Diversion Dam fish screen.
C. South Diversion Dam:
• Decommission the dam, related water conveyance and appurtenant facilities.
D. Wildcat Diversion Dam:
E. Eagle Canyon Diversion Dam:
• Install a NMFS/CDFG approved Fail-Safe Fish Ladder.
• Decommission spring collection facilities as identified in Table 1 of Attachment 1.
F. North Battle Creek Feeder Diversion Dam:
• Retrofit the existing fish ladder or install a new ladder, either which meet NMFS/CDFG approved design for Fail-Safe operation.
G. Soap Creek:
H. Lower Ripley Creek:
I. Baldwin Creek:
• Provide a means for releasing a maximum instream flow of 5 cfs from Asbury Pump Diversion.
J. Various Locations:
• Install/modify gauges at appropriate locations required to monitor implementation of the Restoration Project.
While the above list of facilities to be decommissioned shall not be reduced, the Parties may reach Consensus on less than full removal of any specific facility or appurtenant feature in order to reduce overall Restoration Project costs, where objectives of the Restoration Project, including unimpeded fish passage, will be met while at the same time minimizing PG&E liability.
4.2 Prescribed Instream Flow Releases
The Parties agree that another component of the Restoration Project is an increase of prescribed instream flow releases which will benefit fish and wildlife resources. PG&E will provide the prescribed instream flow releases specified in Tables 1 and 2 of Attachment 1 or the natural flow, whichever is less, and the Ramping Rates specified in Attachment 2. For those dams that are being decommissioned, PG&E will transfer the associated water diversion rights to CDFG, as more fully described in Section 6.1 E.
At the discretion of the Resource Agencies, the prescribed instream flow releases will be initiated and maintained commencing January 1, 2001, or upon issuance of the Final FERC Order, whichever occurs later. Should any such prescribed instream flow releases not commence on January 1, 2001, the associated foregone power generation payment specified in Section 10.2 shall be reduced in proportion to the time at which power generation is actually foregone.
4.3 Water Acquisition Fund
This component of the proposed Restoration Project is described in
Section 9.2 A.
4.4 Adaptive Management Plan
This component of the proposed Restoration Project is described in
Section 9.1.
4.5 Adaptive Management Fund
This component of the proposed Restoration Project is described in Section 9.2 B.
5.0 CONTINGENCIES AND LIMITATIONS
This MOU does not commit the Parties to activities beyond the scope of their respective missions, funding and authorities. Except for the federal portion of the Restoration Project funding provided for in Section 10.1, it is recognized that any federal funding needed to carry out any federal agency responsibilities under this MOU shall be subject to the availability of appropriated funds pursuant to the Anti-Deficiency Act (31 U.S.C. Section 1341). A lack of funding to meet the Agencies’ respective responsibilities shall not result in the transfer of such responsibilities or funding obligations to PG&E. In recognition that final designs and detailed cost estimates will be further refined through the process described in Section 8.0, the Parties agree that if sufficient funding is not available to accommodate the final estimates, they will jointly pursue additional funding.
5.1 The Agencies recognize that USBR will be the Agency that will receive the federal funding for the construction component of the Restoration Project. Thus, USBR, and not the Resource Agencies, will be responsible for any construction and decommissioning cost overruns, as provided in Section 10.2.
5.2 This MOU is of no force and effect until signed by all Parties. Any work initiated prior to the approval date is done at each Party’s own risk.
5.3 The Parties understand and agree that the implementation of any and all activities by CDFG, NMFS, USBR, and USFWS, pursuant to this MOU, with the exception of initial consultations and planning activities, are contingent upon compliance with NEPA and CEQA. The Parties anticipate that activities described in this MOU will be identified in any NEPA/CEQA document as an alternative, but also acknowledge that other alternatives will be considered in the NEPA/CEQA process prior to the time that a final decision or an irreversible commitment of resources or funds is made toward any one alternative.
5.4 The Parties understand and agree that certain undertakings of PG&E pursuant to this MOU are subject to approval by FERC and CPUC. In the event that the Final FERC Order amending the license for FERC Project No. 1121 and/or any necessary CPUC approval is materially different from the terms and conditions of the license amendment application, then this MOU may be amended as provided in Section 13.0 or terminated as provided in Section 16.0.
5.5 The Parties understand and agree that no permanent changes to facilities or operations are required pursuant to this MOU prior to issuance of a Final FERC Order, as defined in Section 2.13 above. The Parties also understand and agree that certain preliminary tasks must be performed to support the proposed license amendment application to FERC prior to the Final FERC Order, in order to assist in accomplishing the Restoration Project. Within sixty (60) days of the effective date of this MOU, PG&E and CDFG will begin consultations and develop a process with the State Water Resources Control Board (SWRCB) with respect to the petition specified in Section 6.1 E. CDFG and PG&E will work diligently with the Resource Agencies and SWRCB to finalize the dedication process after issuance of the Final FERC Order.
5.6 Nothing in this MOU, whether or not incorporated into the terms of the license for FERC Project No. 1121, is intended or shall be construed as a precedent or other basis for any argument that the Parties have waived or compromised any rights which may be available under state or federal law. In addition, nothing in this MOU shall establish a precedent regarding hydroelectric jurisdictional issues.
5.7 The Resource Agencies assert that the current and proposed facilities of FERC Project No. 1121, including those outlined in this MOU, are operating, and will continue to operate, in habitat occupied by Sacramento River winter-run chinook salmon, spring-run chinook salmon, Central Valley steelhead and other species listed under the ESA and the California Endangered Species Act. Nothing in this MOU is intended to bind or prejudice the Resource Agencies, or otherwise limit their respective authorities, in the performance of their responsibilities under these Acts and other applicable federal and state laws.
5.8 If there is any dispute regarding provisions of this MOU and the
Agreement in Principle included as Attachment 1, the provisions of this MOU shall govern.
6.0 ROLES AND RESPONSIBILITIES
6.1 PG&E
A. As more fully described below, PG&E has agreed to a number of physical and operational changes and additions to FERC Project No. 1121, as well as the assumption of a number of future costs, which cumulatively are estimated to have a value of approximately $20,550,900 of the Total Project Cost during the term of this MOU. PG&E, however, recognizes that these costs may exceed those estimates and agrees it is responsible for all cost overruns for Restoration Project components which are identified as funded by PG&E in Table 3 of Attachment 1. This amount includes PG&E’s participation in a portion of the biological and environmental monitoring more fully described in Section 7.3. PG&E’s financial participation in this Restoration Project will consist of: (a) providing 90% of the prescribed instream flow releases listed in Attachment 1 without monetary compensation; (b) assumption of 100% of any increased operation and maintenance costs due to facility and operational changes resulting from the Restoration Project; (c) absorption of the loss of foregone power as a consequence of Ramping Rate requirements described in Attachment 2; and (d) assumption of the cost of screen and ladder repairs and replacements due to normal wear and tear, catastrophic damage, and any other damage. In the event of exhaustion of the Water Acquisition Fund and Adaptive Management Fund, PG&E acknowledges and agrees that it will pay for authorized modifications to FERC Project No. 1121 facilities or operations which are determined to be necessary under Adaptive Management or pursuant to applicable state or federal law.
B. PG&E will pay all of its internal costs associated with the FERC license amendment required to implement the Restoration Project.
PG&E will engage in a collaborative license amendment process to develop the license amendment application for submittal to FERC.
PG&E will include in its amendment application pertinent environmental compliance documents prepared by USBR as described in Section 6.2. PG&E will also participate in and provide limited internal technical and fishery expertise, at its expense, to assist with the biological and environmental monitoring efforts described in Section 7.3 and will cooperate/work with the Resource Agencies conducting analyses, reviewing results, and identifying potential Adaptive Management actions for the Restoration Project.
C. The Parties will work in concert to develop a license amendment application for FERC Project No. 1121. PG&E will file an amendment to its license for FERC Project No. 1121 to implement those actions under FERC’s authority, consistent with the pertinent provisions of this MOU, necessary to implement the Restoration Project. Unless otherwise provided in this MOU, PG&E will fund preparation of the license amendment application, including preparation of the application sections which describe the current and proposed facilities and operation, FERC Project No. 1121 economics, and also modify the existing License Exhibit drawings to reflect the proposed changes to FERC Project No. 1121. PG&E will also be responsible for preparing responses to any additional information requests issued by FERC regarding the responsibilities enumerated in this Section.
D. PG&E will provide the prescribed instream flow releases and Ramping Rates identified in Attachments 1 and 2, and any agreed-upon future changes to these prescribed instream flow releases or Ramping Rates resulting from the Adaptive Management Plan described in Section 9.1, until the end of the current FERC license and any subsequent annual licenses. The Parties acknowledge that this commitment to provide the prescribed instream flow releases and Ramping Rates is subject to change by FERC in the license amendment process and at the expiration of the current license term in 2026. PG&E and the Resource Agencies (subject to applicable state and federal laws) agree to support the continuation of such prescribed instream flow releases and Ramping Rates, and any agreed upon future changes, in the next relicensing proceeding for FERC Project No. 1121.
E. PG&E’s water diversion rights associated with all dams to be decommissioned (see Section 4.1) in the Restoration Project Area shall be transferred to CDFG. For example, when the rights for Soap Creek Diversion are transferred, all rights associated with that diversion will be transferred, including but not limited to, PG&E’s Bluff Springs rights, which are subject to an agreement regarding senior water rights for Hazen Ditch, (Bluff Springs - Hazen Ditch Water Users Agreement, dated May 31, 1988).
PG&E shall execute deeds or other mutually agreed upon documents to transfer these water diversion rights. PG&E will execute and deliver such deeds or other mutually agreed upon documents at the time of PG&E’s receipt of those associated portions of the $2,137,100 specified in Section 10.2. CDFG agrees that the water rights transferred by PG&E to CDFG shall not be used by CDFG or any successor in interest, assignee, or designee to increase prescribed instream flow releases above the amounts specified in Attachment 1, or developed pursuant to the Adaptive Management Plan, nor shall they be used adversely against remaining FERC Project No. 1121 upstream or downstream diversions, until such time as the FERC license is abandoned, whereupon the limitation regarding transferred water rights will no longer apply.
PG&E agrees that its riparian rights associated with lands within the Restoration Project Area shall not be used by PG&E or any successor in interest, assignee, or designee to decrease prescribed instream flow releases below the amounts specified in Attachment 1, or developed pursuant to the Adaptive Management Plan.
PG&E agrees that any deed transferring such riparian land or rights shall contain the above restriction in use of the riparian rights.
PG&E and CDFG shall jointly file a petition with the State Water Resources Control Board (SWRCB) pursuant to Water Code Section 1707 to dedicate the water diversion rights associated with all decommissioned dam sites in the Restoration Project Area to instream uses. The Agencies agree to support the petition.
F. The prescribed instream flow releases described in Attachment 1 for all those dams remaining in FERC Project No. 1121 will be included in the FERC license amendment application to be filed by
PG&E.
G. PG&E is responsible for the operation, maintenance, and replacement of all physical modifications to its facilities under this MOU on Battle Creek due to normal wear and tear, catastrophic damage, and any other type of damage, and will ensure that the new fish screen and ladder facilities meet the Fail-Safe criteria.
Installation costs of facilities installed under the Adaptive Management Fund protocols are excepted. PG&E's responsibilities under this section begin once the facility start-up and acceptance testing is successfully completed by USBR and PG&E. At that point PG&E shall accept and take over the facilities.
H. PG&E is responsible for assisting in design data collection activities for all facilities, as determined under the cooperative design processes established through the Project Management Team and Technical Team, as described in Section 8.2.
I. PG&E, as a member of the Project Management Team established under Section 8.2, is jointly responsible along with the other Parties for review of and concurrence in all designs, engineering, specifications, facility modifications, decommissioning procedures, facility removal, and other activities associated with planning, permitting, and construction. PG&E will have lead responsibility for real estate requirements and transactions, including access authorization for Agency personnel to accomplish their responsibilities under this MOU. Real estate actions will be subject to review and carried out in a cooperative process through the Project Management Team and Technical Team as established in Section 8.2. PG&E shall also be responsible along with the other Parties for the development, review, and concurrence of site restoration plans and designs subject to any requirements established through the permitting process. While USBR will be responsible for obtaining permits as described in Section 6.2, such permitting actions will be done in full cooperation with the Parties to ensure input from PG&E related to the content and conditions established in the permitting process. The technical efforts associated with the activities described in this paragraph will be performed on a reimbursable basis from federal funding provided through USBR as described in Section 10.2.
J. While USBR retains lead responsibility for all design, procurement, and construction associated with the Restoration Project, situations may arise in which it would be safer and more efficient for PG&E construction crews to perform the construction or removal of some facilities. PG&E may perform construction work associated with the Restoration Project as coordinated through the framework of the Project Management Team as described in Section 8.2. Such cooperative decisions related to construction responsibilities will be completed by the end of the conceptual design phase. Such construction work will be performed on a reimbursable basis from federal funding provided through USBR as described in Section 10.2.
K. Contracts will be awarded in accordance with applicable state and federal laws. For contracts awarded by USBR, USBR will confer with PG&E regarding the selection of contractors or other entities for any portion of the work to be performed as part of the Restoration Project. For any contract awarded by USBR that is not a conventional sealed bid, a representative from PG&E will be a member of the team reviewing and recommending the award of these contracts to the USBR Contracting Officer. The final decision on contract award will be made by USBR’s Contracting Officer. If USBR decides that it does not intend to follow PG&E recommendations regarding contractor selection, USBR will provide a written statement to PG&E explaining why USBR chose not to follow the PG&E recommendations.
L. PG&E may elect to conduct its own inspection of construction work performed by others as part of the Restoration Project. Any findings or deficiencies identified by PG&E will be immediately reported to the USBR Construction Engineer. USBR will review and respond to PG&E on any findings of deficiencies including how they will be addressed. Any disagreements will be subject to a dispute resolution process developed by USBR and PG&E. Such inspection services will be performed on a reimbursable basis from federal funding provided through USBR as described in Section 10.2.
M. PG&E shall be responsible for all monitoring required by FERC through the FERC license amendment for FERC Project No. 1121.
PG&E will also participate in and provide limited internal technical and fishery expertise, at its expense, to assist with the biological and environmental monitoring efforts described in Section 7.3, which are the responsibility of the Resource Agencies.
PG&E shall be responsible for all of the facility monitoring more particularly described in Section 7.2.
N. PG&E shall assume the role of applicant for hydropower project operation compliance with Section 404 of the Clean Water Act, certification under Section 401 of the Clean Water Act, and other applicable state and federal laws.
O. To the extent permissible under the provisions of its existing easements with private property owners, PG&E will provide access to Agency representatives engaged in the performance of their respective responsibilities under this Restoration Project.
Protocols for Agency exercise of this access permission will be developed and will address: (1) property owner concerns; (2) PG&E notification; (3) liability issues and any other pertinent matters associated with the specific locations; and (4) property owner notification.
6.2 USBR
A. USBR, along with the Resource Agencies, has applied to CALFED for public funding for the Restoration Project and will continue to support that application, consistent with the terms of this MOU.
B. USBR shall assume the role of lead agency for purposes of regulatory compliance for construction activities associated with the Restoration Project, including the National Environmental Policy Act (42 U.S.C. 4321 et seq. (NEPA)), Section 106 of the National Historic Preservation Act, and the Fish and Wildlife Coordination Act (16 U.S.C. 661-666(c)). USBR shall also act as the federal action agency under Section 7 of the ESA for the construction aspects of the Restoration Project in a joint consultation with FERC acting as lead agency for operation of FERC Project No. 1121. In addition, USBR shall assume the role of applicant for purposes of construction compliance of the Restoration Project with Section 404 of the Clean Water Act, certification under Section 401 of the Clean Water Act and other applicable regulatory permitting required by state and federal laws.
C. USBR shall assume the role of lead agency, and in consultation with PG&E, arrange for all final engineering design documents and specifications, construction, start-up and acceptance testing, and implementation of mitigation and monitoring for the construction activities associated with the Restoration Project, as defined in Section 4.1. USBR shall be responsible for the production of the required environmental documents and the detailed decommissioning plan, with all the supporting engineering, biological, and other technical studies, and preparation of the design drawings needed fo r the license amendment. Funding for responses to any subsequent additional information requests issued by FERC regarding the responsibilities enumerated in this Section will be borne by USBR.
D. USBR will participate in the construction monitoring for the
Restoration Project as described in Section 7.1.
6.3 NMFS
A. The Parties acknowledge and agree that NMFS has made no determination, and is giving the Parties no assurances, regarding compliance of the Restoration Project or PG&E’s operation of its FERC Project No. 1121 with the ESA.
B. NMFS agrees to do the following, to the extent NMFS determines that these provisions are consistent with the biological opinion rendered for the proposed Restoration Project and its responsibilities under the ESA to conserve threatened and endangered species and their habitats:
1. Support a petition to the SWRCB for the instream dedication of that amount of water diversion rights transferred by PG&E to CDFG as more fully described in Section 6.1 E;
2. Support the amendment of the license of FERC Project No.
1121, described in Section 6.1 C, that incorporates the facility modifications described in Section 4.1, the prescribed instream flow increases described in Tables 1 and 2 of Attachment 1, the Ramping Rates described in Attachment 2, and further support the position that FERC focus the license amendment on the fishery restoration actions described in this MOU in order to facilitate the process for a FERC decision allowing the Restoration Project to go forward in a timely manner; and
3. In the next relicensing proceeding for FERC Project No.
1121, support the continuation of the prescribed instream flow releases described in Attachment 1 and Ramping Rates described in Attachment 2, and any changes to those prescribed instream flow releases or Ramping Rates resulting from Adaptive Management, subject to applicable law.
C. Regarding the biological and environmental monitoring described in Section 7.3, NMFS agrees to support incorporating Battle Creek monitoring needs into appropriate CVPIA, CALFED, and other monitoring programs.
D. As approving and implementing various activities described in the
MOU will result in a major federal construction activity affecting listed salmonids under NMFS' jurisdiction, NMFS will conduct the requisite Section 7 consultation for species under its authority.
The above measures will require FERC to exercise its federal discretionary authority in approving an amendment of the license for FERC Project No. 1121 prior to implementation. This action, as well as FERC's continuing oversight over FERC Project No.
1121 operations, constitutes a Federal Action for the purposes of Section 7 of the ESA. Therefore, FERC will be designated Lead Federal Agency. The referenced Section 7 consultation will also encompass various planning and construction-related activities to be undertaken by USBR and therefore, will be conducted jointly with FERC and USBR. NMFS will consult with FERC and USBR under Section 7 of the ESA to ensure the proposed changes to the facilities and operation of FERC Project No. 1121 comply with the
ESA.
6.4 USFWS
A. The Parties acknowledge and agree that USFWS has made no
FERC Project No. 1121 with the ESA.
B. USFWS agrees to do the following:
1. Support a petition to the SWRCB for the instream dedication of that amount of water diversion rights transferred by PG&E to CDFG as more fully described in Section 6.1 E;
facility modifications described in Section 4.1, the prescribed instream flow releases described in Tables 1 and 2 of Attachment 1, the Ramping Rates described in Attachment 2, and further support the position that FERC focus the license amendment on the fishery restoration actions described in this MOU in order to facilitate the flow releases described in Attachment 1 and Ramping Rates described in Attachment 2, and any changes to those prescribed instream flow releases or Ramping Rates
C. Regarding the biological and environmental monitoring described in Section 7.3, USFWS agrees to support incorporating Battle Creek monitoring needs into appropriate CVPIA, CALFED, and other monitoring programs.
D. As approving and implementing various activities described in the
MOU will result in a major federal construction activity that may affect species under USFWS jurisdiction, USFWS will conduct the requisite Section 7 consultation for species under its authority.
The above measures will require FERC to exercise its federal discretionary authority in approving an amendment of the license for FERC Project No. 1121 prior to implementation. This action, as well as FERC's continuing oversight over FERC Project No.
1121 operations, constitutes a Federal Action for the purposes of Section 7 of the ESA. Therefore, FERC will be designated Lead Federal Agency. The referenced Section 7 consultation will also encompass various planning and construction related activities to be undertaken by USBR and therefore, will be conducted jointly with FERC and USBR. USFWS will consult with FERC and USBR under Section 7 of the ESA to ensure the proposed changes to the facilities and operation of FERC Project No. 1121 comply with the ESA.
6.5 CDFG
A. The Parties acknowledge and agree that CDFG has made no
FERC Project No. 1121 with applicable state law.
B. The Parties acknowledge and agree that CDFG is not responsible for funding any component of the Restoration Project, including any cost overruns.
C. CDFG agrees to do the following:
1. CDFG and PG&E shall jointly file a petition with the State
Water Resources Control Board (SWRCB) pursuant to Water Code Section 1707 to dedicate the water diversion rights associated with the decommissioned dam sites in the Restoration Project Area to instream uses;
facility modifications described in Section 4.1, the prescribed instream flow releases described in Tables 1 and 2 of Attachment 1, the Ramping Rates described in Attachment 2, and further support the position that FERC focus the license amendment on the fishery restoration actions described in this MOU in order to facilitate the flow releases described in Attachment 1 and Ramping Rates described in Attachment 2, and any changes to those prescribed instream flow releases or Ramping Rates
D. Regarding the biological and environmental monitoring described in Section 7.3, CDFG agrees to support incorporating Battle Creek monitoring needs into appropriate CVPIA, CALFED, and other monitoring programs.
7.0 MONITORING AND REPORTING
7.1 Construction Monitoring, Start-up, and Acceptance Testing
A. USBR agrees to perform all construction monitoring and reporting required as part of construction of the Restoration Project as described in Sections 6.2 and 8.4. Funding for the construction monitoring will be derived only from the federal funding as identified in Section 10.2, and USBR does not agree to spend any additional, federal money to perform such construction monitoring.
Construction monitoring includes those parameters required by the permits developed pursuant to the Clean Water Act, and mitigation actions adopted pursuant to CEQA, NEPA, ESA, and related FERC requirements.
B. USBR agrees to perform all start-up and acceptance testing, and prepare the necessary documents and reports, up to and until PG&E and USBR jointly determine that the constructed facilities' operation meets the design criteria. Completion inspections for each construction contract will be performed by both USBR and PG&E and certifications of approval will be issued jointly by USBR and PG&E. If construction of a particular Restoration
Project feature does not meet with the satisfaction of either party, a checklist of needed work prior to the certification of completion will be prepared and agreed to by both parties. Upon mutual agreement of the parties, a completed portion of the construction contract or a Restoration Project feature may be turned over to PG&E for operation and maintenance.
Start-up and acceptance testing for both screens and ladders will include, but is not limited to, measurements of velocity and flow collected from each component of the structure at several stage heights to evaluate actual hydraulic performance and reliability over the full range of operating conditions as compared to the design specifications.
7.2 Facility Monitoring
PG&E, in consultation with the Agencies, shall prepare a detailed facility monitoring plan to be submitted to FERC as part of the license amendment application. PG&E shall perform and assume the costs for the following facility monitoring:
A. At the various outlet and spillway works for North Battle Creek
Feeder, Eagle Canyon, Inskip, and Asbury Pump (Baldwin Creek) Diversion Dams, operate properly calibrated remote sensing devices that continuously measure and record total flow and the fluctuation of stage immediately below each dam during all operations for the purpose of verification of FERC license compliance. All flow and stage recording methodologies shall be approved by FERC;
B. At the fish ladders at North Battle Creek Feeder, Eagle Canyon, and Inskip Diversion Dams, operate properly calibrated remote sensing devices that continuously monitor water surface elevations at the top and bottom of the ladder to identify debris problems. In addition, continuously operate a calibrated automated fish counter or an underwater video camera to document fish movement through the ladder during the initial three-year period of operation, or as otherwise agreed upon by the Parties; and
C. At the fish screens at North Battle Creek Feeder, Eagle Canyon, and Inskip Diversion Dams, operate properly calibrated remote sensing devices that continuously monitor water surface elevation differences on the inlet and outlet side of screens to identify plugging.
7.3 Biological and Environmental Monitoring
The biological and environmental monitoring described below will address the overall status of anadromous fish populations and related ecosystem health in the Battle Creek watershed which includes the Restoration Project Area. The Parties understand and agree that biological and environmental monitoring in the watershed and Restoration Project Area will be performed by USFWS and/or CDFG, or their designated representatives, using available funding from Central Valley fishery restoration funding sources, including but not limited to, the $1,000,000 federal funding allocation for the Restoration Project described in Section 10.2; and CALFED’s Comprehensive Monitoring Assessment Research Program; and CVPIA's CAMP. The Parties understand and agree that if sufficient funding is not available through the above sources they will jointly pursue other appropriate funding sources.
The Parties will jointly prepare the Agencies’ detailed biological and environmental monitoring component of the Adaptive Management Plan described in Section 9.1 A 2 (b). The biological and environmental monitoring will include, but is not limited to:
A. Estimates of the number and species of upstream migrant salmonids entering upper Battle Creek via the fish ladder at Coleman National Fish Hatchery Barrier Weir, using underwater video or automated fish counters and intermittent use of a fish trapping facility to sample individual fish for species/run identification;
B. Estimates of the relative abundance and distribution and immigration timing of adults in the Battle Creek watershed, using the most efficient and safe method for the particular stream reach, including underwater observation, carcass, redd and/or aerial surveys;
C. Estimates of the relative abundance, distribution, and out-migration timing of juveniles, using downstream migrant trap installations in the Battle Creek watershed;
D. Characterization of the temperature regime in the Battle Creek watershed by continuously measuring and recording water temperatures and meteorological conditions during the appropriate periods; and
E. Examination of fish passage conditions at natural obstacles that change in the stream canyon areas over time, such as clusters of debris and boulders, by observing these areas during other fish survey activities and more detailed analysis at sites that undergo major reconfiguration.
The biological and environmental monitoring described above is beyond the scope of PG&E's facility monitoring described in Section 7.2.
7.4 Other Monitoring
The Parties agree that any monitoring of Restoration Project actions, other than the monitoring described in Sections 7.1 and 7.3 which may be required pursuant to the license for FERC Project No. 1121 will be done by PG&E at its sole cost.
7.5 Reporting and Notice Requirements
PG&E will make available all facility monitoring reports to the Resources Agencies and CALFED upon specific request. The fish use records at the fish ladders shall be made available on a monthly basis to the Resource Agencies during the initial three-year period of operation, or as otherwise agreed upon by the Parties. Upon discovery of any occurrence of operation of a screen, ladder, or water release mechanism outside of the requisite specifications, notification will be made by PG&E to NMFS and CDFG as soon as possible, but no later than the next day of operation.
The notification shall include a description of the deviation, any necessary corrective measures taken or proposed, and an implementation schedule if the situation has not been corrected.
All biological and environmental monitoring results and analyses described in Section 7.3 will be presented by the Resource Agency performing the monitoring in annual reports to the Parties and FERC and will be made available to CALFED and other interested persons upon request.
8.0 PLANNING, PERMITTING, AND CONSTRUCTION ACTIVITIES
8.1 Schedule
The Parties agree to use their best efforts to…