This Statement of Work details requirements for renovating the Preventative Maintenance Shop and replacing an aluminum canopy at the VA Medical Center in Miami, Florida (Project #546-22-106). The project must be completed within 180 days after Notice to Proceed.
The scope includes demolishing and replacing a 5,000 square foot hurricane-rated canopy with TPO roofing system, installing a 3,000 lb. capacity equipment lift, new stainless-steel sink, emergency shower/eyewash station, and five flammable storage cabinets. Additional work involves constructing 1,000 sf of equipment screen, installing chain link fencing, drainage systems (including 290 linear feet of PVC piping), electrical work, and lightning protection. Site improvements include pressure washing and painting of the maintenance yard asphalt and Building 40 exterior. The contractor must coordinate with VA staff to minimize disruption to hospital operations and provide all testing, commissioning, documentation, and cleanup upon completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Title: Renovate PM Shop and Replace Aluminum Canopy Roof Sec on
VA Project Number: 546‐22‐106
Project Delivery Method: Construc on
Target comple on: Not to exceed 180 days a er No ce to Proceed (NTP) awarded.
Scope of Work
The Contractor shall provide all labor, materials, equipment, and supervision necessary to renovate the
Preventa ve Maintenance (PM) Shop and replace the exis ng aluminum canopy at the Department of
Veterans Affairs Medical Center in Miami, Florida. All work shall be performed in accordance with the designed specifica ons and drawings provided.
General Requirements
1. Follow all designed specifica ons and drawings for this project.
2. Comply with all applicable local, state, and federal codes and regula ons.
3. Implement and maintain appropriate safety measures throughout the project.
4. Coordinate all work with VA staff to minimize disrup on to ongoing hospital opera ons.
Specific Work Items
Demoli on and Site Prepara on:
Remove exis ng aluminum canopy, integrated gu er, downspouts, and integrated structural elements.
Demolish exis ng equipment li , stainless steel u lity sink, emergency shower and eye wash.
Remove approximately 250 square feet of chain link fence.
Prepare site for new construc on and installa ons.
New Canopy Construc on:
Construct a new hurricane‐rated, freestanding, 5,000 square foot canopy.
Install TPO roofing system on the new canopy.
Provide and install a new gu er and downspout system for the canopy.
Equipment and Fixtures:
Install a new 3,000 lb. capacity equipment li with rail.
Install a new stainless‐steel sink and emergency shower with eye wash sta on.
Provide and install five (5) flammable storage cabinets.
Install surface‐mounted LED light strips for canopy illumina on.
Install three (3) surface‐mounted adjustable fans.
Site Improvements:
Construct approximately 1,000 sf of equipment screen.
Install new chain link fence with gates to replace removed sec ons.
Pressure‐wash exis ng maintenance yard asphalt, Bldg. 40 exterior, and white vinyl fence.
Apply new paint to maintenance yard asphalt and Bldg. 40 exterior.
Drainage:
Sanitary Waste System:
Connect to exis ng sanitary waste piping (2 connec ons).
Install PVC pipe and fi ngs, including trench and backfill for 2" pipe (35 linear feet).
Sawcut slab, patch, and repair (35 linear feet).
Storm Drainage:
Connect to exis ng stormwater main (1 connec on).
Install PVC SDR‐35 pipe and fi ngs, including trench and backfill:
4" pipe (210 linear feet).
6" pipe (80 linear feet).
Sawcut slab, patch, and repair (290 linear feet).
Install area drains (3 units).
Connect to gu ering/downspouts (10 connec ons).
Electrical and Ligh ng:
Provide all necessary electrical work for new equipment and ligh ng.
Install lightning protec on system for the new canopy.
Finishes:
Apply all required finishes as per specifica ons.
Project Close‐out
Perform all required tes ng and commissioning of installed systems.
Provide all necessary documenta on, including as‐built drawings and opera on manuals.
Clean and prepare the area for VA use.
The Contractor shall coordinate closely with the VA engineer project manager COR and adhere to all VA policies and procedures throughout the dura on of the project. All work must be completed in accordance with the project schedule and to the sa sfac on of the VA.