Attachment 5 - Technical Worksheet Final.docx
DOCX document 35 KB Posted
- Attached to
- S&RTS Ports of Australia
- Solicitation number
- HTC711-23-R-R005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 5 - Technical Worksheet Final 03062023.docx | DOCX document | |
| Amendment P00003 Ports of Australia Solicitation HTC711-23-R-R005.docx | DOCX document | |
| Attachment 2_Schedule of Rates_Australia 03032023.xlsx | XLSX spreadsheet | |
| HTC71123RR005_0002.pdf | ||
| Questions and Answers_3 March 2023.pdf | ||
| Attachment 2 - Schedule of Rates - Australia FINAL 02212023.xlsx | XLSX spreadsheet | |
| Attachment 1 - PWS - Australia Final 02212023.pdf | ||
| Attachment 5 - Technical Worksheet Final 02212023.docx | DOCX document | |
| HTC711-23-HTC711-23-R-R005 Amendment 1.pdf | ||
| RFP HTC711-23-R-R005 Ports of Australia FINAL.docx | DOCX document | |
| Attachment 3 - Contractor Plan for Continuation of Essential Contractor Services TEMPLATE.docx | DOCX document | |
| Attachment 1 - PWS - Australia Final 12122022.docx | DOCX document | |
| Attachment 2 - Schedule of Rates - Australia.xlsx | XLSX spreadsheet | |
| Attachment 4 - RFP Information and General Compliance Worksheet.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Source Selection Information – See FAR 2.101 and 3.104 (When Filled-in, this Document becomes CUI//SP-SSEL)
Source Selection Information – See FAR 2.101 and 3.104 (When Filled-in, this Document becomes CUI//SP-SSEL)
Attachment 5: Technical Worksheet
Request for Proposal: HTC711-23-R-R005
** Submission Rules & Instructions: **
1. When completing this Technical Worksheet, the Offeror shall answer each question based on Attachment 1, Performance Work Statement (PWS) requirements. The Offeror shall assume the Government has no prior knowledge of the past or present experience the Offeror may have.
2. The Offeror’s entire submission, based on this Technical Worksheet, SHALL NOT exceed 25 pages in length. Technical Worksheets that exceed 25 pages, will have only the first 25 pages evaluated and all other pages will be removed before the Technical Worksheet is evaluated.
3. The offer shall not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the contractor intends to meet the minimum requirements identified in the PWS. Statements paraphrasing the PWS or parts thereof, flowcharts simply listing activities related to the PWS, and phrases such as “standard procedures will be employed” without description of how the Government’s requirements will be met will be considered unacceptable.
4. All requested attachments, port certifications, licensing, permits, documentary evidence (photos), and Material Handling Equipment (MHE) lists shall not count against the page limits.
NOTE** Failure to complete this document in its entirety or attach requested documents may result in an Offeror being ineligible for award.
RATINGS:
| ACCEPTABLE |
| Technical Worksheet clearly meets the minimum requirements of the solicitation |
| UNACCEPTABLE |
| Technical Worksheet does not clearly meet the minimum requirements of the solicitation |
*An “unacceptable” rating on any question below will result in an overall “unacceptable” Technical Worksheet rating.
The Government will evaluate the Offeror’s technical approach to determine if the Offeror submitted a sound approach for accomplishing the PWS task areas identified below:
1. Labor
Please describe your company’s ability to provide qualified and appropriate labor types necessary to meet the Government’s port support needs and required productivity. Include in your response how this labor will be utilized to provide flexible start times, operate multiple work sites, and transition to contingency operations, maintaining work schedules 24/7 as outlined in the following PWS references. (Ref PWS - 3.6, 3.6.2, 4.1.4, 4.12, 4.27.4, 5.5.2, and 6.14) Click here to enter text.
2. Equipment
Please describe your company’s ability to secure, provide, and safely use the following: Material Handling Equipment (MHE), gear capable of moving all classes of cargo (vehicles, containers, aircraft, and breakbulk), and ramps (fixed or portable) with a capacity up to 70 Ton (or 72,574 Kgs). Include in your response how you will provide heavy tow equipment capable of handling inoperable wheel or track vehicles weighing up to 150,000 Lbs (68,038.9 Kgs). Your response shall also address how you will provide maintenance support for the required equipment. (Ref PWS -5.8.6, 5.9, 5.10, 5.31, 5.32-5.36) Click here to enter text.
3. Certifications/Port Access
3a. HAZMAT Certifications. Provide proof of current certification or signed self-certified letter stating at least two proposed personnel are trained and tested in handling Hazardous Material per the requirements of the Code of Federal Regulation (CFR) Title 49, Section 172.702, or Host Nation equivalent. (Ref PWS 3.6.4) Click here to enter text.
3b. Primary Port Access. Provide proof of a valid and current business license or work permit for the prime and/or subcontractors issued by the applicable Host Nation as evidence to legally work at all named primary ports within the PWS. (Ref PWS 4.1.1) Click here to enter text.
3c. Secondary Port Access. Provide signed self-certified letter stating your company’s capability, either directly or via subcontractor, to legally work at all remaining secondary ports located throughout Australia. (Ref PWS 1.2.1.2.1 and 4.1.1) Click here to enter text.