Attachment 5 SOW Supplement.pdf
PDF 512 KB Posted
- Attached to
- Trusted and Elastic Military Platforms and Electronic Warfare (EW) System Technologies (TEMPEST) Federal contract opportunity
- Solicitation number
- FA8650-20-S-1958-Call-02
About this file
This document is an attachment to a federal contract solicitation that outlines supplemental statement of work requirements. Key details include that the contractor must comply with disclosure of information and travel requirements, including reimbursing allowable travel costs. The contractor must also notify the contracting officer of any changes to key personnel and meet minimum qualification requirements for positions. The contractor must acknowledge sponsorship by the Air Force Research Laboratory in any released information and follow packaging and marking requirements for deliverables. Base support may be provided at listed installations. The solicitation also includes requirements regarding non-U.S. citizen access, pollution prevention training, and the incorporation of the comprehensive small business subcontracting plan by date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| TEMPEST ARA - ICET CALL 02 Amd 01.pdf | ||
| Attachment 3 DD 254.pdf | ||
| TEMPEST ARA - ICET CALL 02.pdf | ||
| Attachment 1 SOO.pdf | ||
| Attachment 2 CDRLs.pdf | ||
| Attachment 6 Payment Instructions.pdf | ||
| Attachment 4 Model Contract.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment __5___
Statement of Work (SOW)
Supplemental Requirements (AFRL/PZL) 3 Apr 2020
The following paragraphs are also considered be a part of the SOW/PWS requirements and the Contractor is responsible for compliance to the same extent as the rest of the SOW/PWS.
1. Implementation of Disclosure of Information - In order to comply with DFARS 252.204-7000, Disclosure of Information, the following copies of the information to be released are required at least 45 days prior to the scheduled release date:
(a) One copy(ies) Contracting Office
(b) One copy(ies) to: Program Manager
2. Travel –
(a) The Contractor may be required to travel within the contiguous United States and overseas. The Contractor may be required to travel by Government-provided transportation. Travel requirements will be reimbursed by separate voucher and must be approved in advance by the Contracting Officer's Representative (COR). Travel requirements will be identified, proposed, and negotiated on an as required cost-reimbursement basis. Billable travel costs are air fare, ground transportation, and per diem costs - not labor hours. The Contractor shall be responsible for obtaining any passports or visas and making travel arrangements to and from any CONUS location.
(1) Per diem, air fare, and all other allowable travel costs shall be reimbursed in accordance with the Federal Acquisition Regulation. All travel within overseas areas shall be approved in advance by the Contracting Officer's Representative (COR).
(2) The Government may provide travel to and from overseas work sites via Air Mobility Command (AMC) flights if available. AMC travel fees may be Contractor-paid and invoiced to the Government. The Government will be responsible for obtaining travel clearances and issuance of any required special orders.
(b) Use of AMC transportation shall be approved in advance by the Contracting Officer's Representative or the Contracting Officer. Orders authorizing AMC travel will specify the Contractor's Customer Identification Code (CIC). If the Contractor does not have CIC number the orders will state "special account handling: billing for AMC transportation will be forwarded to )." Use of AMC transportation is subject to availability.
(c) The travel CLIN is intended to pay for travel occurring at the direction of the Government performed in conjunction with a specific trip authorized in a task order. Travel by clerical support personnel shall be approved in advance by the Contracting Officer's Representative or Contracting Officer.
3. Key Positions and Minimum Qualifications
(a) Contractor personnel holding the position titles and having the qualifications listed below are considered essential to the work being performed under this contract:
Key Positions: Minimum Qualifications:
(list by job title) (list minimum qualifications in terms of education and/or experience)
(b) The contractor shall notify the contracting officer before the departure of any individual in a key position and identify the proposed substitution. Any proposed personnel substitution that does not meet the minimum qualification requirements described above requires the prior written approval of the contracting officer.
4. Acknowledgement of Sponsorship -
(a) The contractor agrees that in the release of information relating to this contract such release shall include a statement to the effect that the project or effort depicted was or is sponsored by the Air Force Research Laboratory (AFRL and DARPA).
(b) For the purpose of this clause "information" includes but is not limited to material presented in news releases articles manuscripts brochures advertisements still and motion pictures speeches presentations meetings conferences symposia etc.
(c) Nothing in the foregoing shall affect compliance with the requirements of the clause (if applicable) of this contract entitled "Security Requirements".
(d) The contractor further agrees to include this requirement in any subcontracts awarded as a result of this contract.
5. Packaging and Marking –
(a) All hardware deliverable contract items shall be packaged in accordance with established commercial practices.
(b) When special delivery and/or handling instructions are required, all boxes and/or crates must contain the following statement in plain sight and in bold letters: INSTRUCTION TO RECEIVING OFFICE -
DO NOT OPEN; CONTENTS ARE SENSITIVE TO DAMAGE WHEN IMPROPERLY OPENED OR HANDLED.
CONTACT THE RESPONSIBLE TECHNICAL PROJECT OFFICER IMMEDIATELY UPON RECEIPT. CONTACT: XX
6. Program Manager – The Government Program Manager for this effort is
7. Program Focal Points – The individuals listed below are identified as focal points for this contract.
Principal Investigator: ; Technical Contract Manager: ; Alternate: .
8. Purchase of American-Made Equipment and Products - It is the sense of the Congress that an entity that is awarded a funding agreement under the SBIR/STTR program of a Federal agency under Section 9 of the Small Business Act should, when purchasing any equipment or a product with funds provided through the funding agreement, purchase only American made equipment and products, to the extent possible in keeping with the overall purpose of that program.
9. Base Support - Base support may be provided by the Government to the Contractor in accordance with this SOW/PWS.
(a) The Contractor will require use of base support on a rent-free, non-interference basis to include Government-controlled working space, material, equipment, services (including automatic data processing), or other support (excluding use of the Defense Switched Network (DSN)) which the Government determines can be made available at, or through, any Air Force installation where this contract shall be performed.
(b) Unless otherwise stipulated in the contract schedule, the Contractor will use base support on a no-charge-for-use basis and the value shall be a part of the Government's contract consideration.
(c) The Contractor will immediately report (with a copy to the cognizant CAO) inadequacies, defective base support, or nonavailability of support stipulated by the contract schedule, together with a recommended plan for obtaining the required support. Facilities are not be purchased under this contract by the Contractor. Additionally, the Contractor (or authorized representative) will not purchase, or otherwise furnish any base support requirement provided by the SOW/PWS (or authorize others to do so), without prior written approval of the Contracting Officer regarding the price, terms, and conditions of the proposed purchase, or approval of other arrangements.
(d) Following are installations where base support will be provided: (insert list of installations).
(e) The base support to be furnished under this contract is (insert list of support items). Because of the nature and location(s) of the work performed, the value of such support is undeterminable.
The Contractor is not authorized to incur any costs resulting from nonsupport prior to Contracting Officer direction.
10. Contracting Officer Representative (COR) for SCI Security Administration – The Government
Contracting Officer Representative (COR) for SCI Security Administration on behalf on the Contracting Officer (CO) for this effort is (name and contact information).
11. Implementation of Patent Rights Clause –
(a) “Interim or Final Invention Reports 1) listing the subject invention(s) and stating that all subject inventions have been disclosed, or 2) stating that there are no such inventions, shall be sent to both the Administrative Contracting Officer (insert “at the address located on the face of the contract” or name and address for the ACO) and to _______________________ (insert contact information, name/or position title, email, and phone number for person(s) at the procuring contract office who performs patent administration) within the timeframes specified in the Patent Rights clause of this contract.
(b) Contractors are highly encouraged to use DD Form 882, Report of Invention and Subcontracts, to submit these reports. The DD Form 882 may also be used for the notification of an award of any subcontract(s) for experimental, developmental or research work which contain a “Patent Rights” clause.
(c) All other notifications required by the contract shall also be sent to the addresses in paragraph (a). This provision also constitutes the request for the following information for any subject invention for which the contractor has retained ownership (1) the filing date, (2) serial number and title, (3) a copy of the patent application, and (4) patent number and issue date. Submittal shall be to (insert contact information for person(s) at the procuring contract office who will handle patent administration, e.g., name and/or position, email, phone numbers, etc.).
12. Implementation of Pollution Prevention and Right-To-Know Information- To comply with FAR Clause 52.223-5 "Pollution Prevention and Right-to-Know Information, Alt 1, and Environmental Management System (EMS) requirements, the contractor is required to complete Initial EMS Awareness-Level training for all personnel working on an Air Force installation.
(a) The installation office responsible for providing the EMS training is ____
(b) The training requires ___________ (insert time for training, ie. “less than 30 minutes”)
(c) The EMS Awareness-level training shall be accomplished within _____ days of contract (or modification) award. New contract employees shall be trained within _____ days of starting work on the installation.
(d) The EMS Awareness-level training is available via ________ (ie. website name and address), which provides materials that meet the training requirement.
(e) Upon completion of the training, the contractor shall provide _________ (ie the AF program manager (PM)) a list of the contractor employees' names and the date the training was completed.
13. Information Regarding Non-US Citizens Assigned to this Project –
(a) Contractor employees requiring access to USAF bases, AFRL facilities, and/or access to U.S.
Government Information Technology (IT) networks in connection with the work on this contract must be U.S. citizens. For the purpose of base and network access, possession of a permanent resident card (“Green Card”) does not equate to U.S. citizenship. This requirement does not apply to foreign nationals approved by the U.S. Department of Defense or U.S. State Department under international personnel exchange agreements with foreign governments. It also does not apply to dual citizens who possess US citizenship, to include Naturalized citizens.
Any waivers to this requirement must be granted in writing by the Contracting Officer prior to providing access. Specific format for waiver request will be provided upon request to the Contracting Officer. The above requirements are in addition to any other contract requirements related to obtaining a Common Access Card (CAC).
(b) For purposes of paragraph (a) above, if an IT network/system does not require AFRL to endorse a contractor’s application to said network/system in order to gain access, the organization operating the IT network/system is responsible for controlling access to its system. If an IT network/system requires an U.S. Government sponsor to endorse the application in order for access to the IT network/system; AFRL will only endorse the following types of applications;
consistent with the requirements above:
(1) Contractor employees who are U.S. citizens performing work under this contract.
(2) Contractor employees who are non-U.S. citizens and who have been granted a waiver.
Any additional access restrictions established by the IT network/system owner apply.
14. Fundamental Research -
Pursuant to DFARS 252.204-7000, Disclosure of Information, the exception allowing release in Paragraph (a)(3) is applicable to Statement of Work section(s)/task(s) _________, only as long as the work remains in the public domain, or is considered fundamental research and not sensitive or inappropriate for public release. Any time work progresses to the non-public domain, exceeds the scope of fundamental research, or you have reason to believe the work has become sensitive or inappropriate for release to the public, then this exception no longer applies.
15. Comprehensive Small Business Subcontracting Plan -
The comprehensive small business subcontracting plan dated (insert date) is hereby incorporated by reference.
File details come from the government source that posted it. Updated .