Attachment 5 - Quality Assurance Surveillance Plan QASP - Canine Explosives Detection Services.pdf
PDF 332 KB Posted
- Attached to
- Canine Explosive Support Services
- Solicitation number
- 2031ZA26R00013
About this file
This is a Quality Assurance Surveillance Plan (QASP) for a canine detection services contract with the Bureau of Engraving and Printing, effective October 27, 2025. The QASP establishes the systematic methods, procedures, and documentation requirements for monitoring contractor performance to ensure compliance with the Performance Work Statement (PWS) titled "Canine Explosives Detection Support." The plan emphasizes a performance-based approach focused on achieving expected outcomes rather than scrutinizing compliance processes, allowing the contractor flexibility in service delivery methods while maintaining critical performance standards. The contractor is responsible for implementing its own quality control program with self-inspection procedures, and the Contracting Officer's Representative (COR) will conduct government surveillance through random monitoring, 100% monthly inspection of generated documentation, and periodic inspections. Acceptable Quality Levels (AQLs) are set at 100% for critical activities and include requirements for trained and certified canine detection teams possessing current detection-specific training certificates, all detection teams performing minimum four-hour weekly proficiency sustainment training, and emergency response support available 24/7 within two hours of notification.
The QASP designates the Contracting Officer as responsible for contract compliance, cost control, and dispute resolution, while the COR handles technical administration and performance surveillance documentation. Performance monitoring utilizes two primary forms: the COR Monthly Status Report (Attachment 2) documenting overall contractor quality, schedule compliance, issues, discrepancies, and customer complaints, and the Customer Complaint Form (Attachment 3) for recording and investigating validated complaints. The plan includes monthly written reports summarizing surveillance results, with the COR retaining copies of all completed quality assurance forms. Attachment 4 references 18 GAO-identified issues important to canine health and welfare, including abuse prevention, emergency medical care, exercise, food and water provision, grooming, veterinary care, housing standards, medication administration, transportation practices, and post-retirement medical care. Failure to meet required performance levels may result in corrective action plans, contract cancellation, or deductions from monthly payments. The COR is responsible for meeting with the contractor as needed to discuss performance data, trends, issues, and corrective action plans, with all decisions regarding service level changes documented and incorporated through contract modification.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
CANINE DETECTION SERVICES
This is a services contract to provide canine services to the Bureau of Engraving and Printing. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Government and the Contractor understand that the services to be provided under this contract by the Contractor are non-personal services and that no employer-employee relationship exists between the Government and the Contractor.
Date: October 27, 2025
TABLE OF CONTENTS
1 INTRODUCTION
1.1 Purpose
1.2 Performance Management Approach
1.3 Performance Management Strategy
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
2.2 The Contracting Officer’s Technical Representative
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
4.2 Customer Feedback
4.3 Acceptable Quality Levels
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
5.2 Monitoring Forms
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.2 Reporting
6.3 Reviews and Resolution………………………………………………………………………….6
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
ATTACHMENT 2: QUALITY ASSURANCE MONITORING FORM
ATTACHMENT 3: CUSTOMER COMPLAINT FORM.……………………………………………….11
ATTACHMENT 4: GAO IDENTIFIED IMPORTANT TO THE HEALTH/WELFARE K9…….…….12
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
1 INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Canine Explosives Detection Support. This plan sets forth the procedures and guidelines the Police Services Branch, Bureau of Engraving and Printing will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
1.1.2 This QASP defines the roles and responsibilities of all parties involved with the Canine Explosives Detection Support contract, which identifies the following: performance objectives, the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
1.2 Performance Management Approach
1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the Bureau of Engraving and Printing to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
1.3.1 The contractor is responsible for the quality of all services provided. The contractor measures that quality through the contractor’s own quality control (QC) program. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for examining the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS.
This QASP enables the government to take advantage of the contractor’s QC program.
1.3.2 The government representative(s) will monitor services provided and review customer feedback reports (as related to BEP personnel) furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Police Services Branch, Bureau of Engraving and Printing, COR and the contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.
2.2 The Contracting Officer’s Representative
The contracting officer’s representative (COR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary.” If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. Failure to meet the required service or performance level will result in a deduction from the monthly amount or cancellation of contract.
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:
Random monitoring, which shall be performed by the COR designated inspector.
100% Inspection – Each month (when services are utilized), the COR, shall review the generated documentation and enter summary results into the Surveillance Activity Checklist.
Periodic Inspection – COR typically performs the periodic inspection on a monthly basis.
4.2 Customer Feedback
The contractor is expected to establish and maintain professional communication between its customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR, as opposed to the contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR. The COR will accept those customer complaints and investigate using the Quality Assurance Monitoring Form – Customer Complaint Form, identified in Attachment 3.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
4.3 Acceptable Quality Levels
The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance is structured to allow the contractor to manage how the services are provided. For certain critical activities such as those involving accessibility to facilities, the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance at the Bureau of Engraving and Printing, Fort Worth, Texas.
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes.
Performance standards are expressed in the PWS and is assessed using the performance monitoring techniques shown in Attachment 1.
5.2 Monitoring Forms
The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms in Attachments 2 and 3 (when necessary). The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results – expected quality levels are being achieved.
5.2.1 The COR will retain a copy of all completed QA surveillance forms.
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.1.1 Government shall use the monitoring methods cited to determine whether the service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels. Failure to meet AQL may result in cancellation of the contract services.
6.2 Reporting
6.2.1 At the end of each month (services/facilities are utilized), the COR will prepare a written report for the Bureau of Engraving and Printing summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards. (*All documentation only required when services/facilities utilized or upon request of the BEP).
6.3 Reviews and Resolution
6.3.1 The Bureau of Engraving and Printing (COR) may require the contractor’s project manager, or a designated alternate, to meet with the COR and other government personnel as deemed necessary to discuss performance evaluation items. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:
Monthly performance assessment data and trend analysis
Issues and concerns of both parties
Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
Recommendations for improved efficiency and/or effectiveness
6.3.2 The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
6.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to service levels should be clearly documented. Changes to service levels, and procedures will be incorporated as a contract modification at the convenience of the Bureau of Engraving and Printing and Canine Explosives Detection Support Services Contractor.
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
To ensure the Government has an effective and systematic method of surveillance for the services in the Performance Work Statement. The Quality Assurance Surveillance Plan (QASP) will be used primarily as a tool to verify that the contractor is performing all services as required by the Performance Work Statement in a timely, accurate and complete fashion. Performance will be measured in accordance with the Government QASP table below.
Performance Objective Standard Performance Threshold Method of Surveillance
The contractor shall provide trained and certified canine detection – specific teams
100%
Canine Detection Teams must possess current detection specific training certificates
Periodic Inspections
(Results will be recorded and sent to the CO)
All Canine Detection Teams shall perform a minimum of four hours per week proficiency statement
Proficiency Sustainment/Maintenance training has been performed and support provided
(Recorded in the QASP with a copy distributed to CO)
The contractor shall provide emergency response support within two (2) hours, or sooner upon notification 24 Hours Per Day/7 Days a week.
*Notification service for receipt of such request must be maintained.
Proficiency Sustainment/Maintenance training has been performed and support provided
(Recorded in the QASP with a copy distributed to CO)
ATTACHMENT 2
COR MONTHLY STATUS REPORT FOR MONTH ENDING
COR Name:
Contract Number:
Delivery/Task Order:
Contract Period of Performance From To
CONTRACTORS QUALITY OF WORK
Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
1. Is the Contractor up –to-date in submitting or performing the following:
a. Monthly Invoices or Cost Vouchers
Yes Comments No
N/A
b. Sub-Contractor Information
Yes Comments No
N/A
c. Required Deliverables
Yes Comments No
N/A
d. Status Reports
Yes Comments No
N/A
2. Has the Contractor conducted duties in a timely manner?
Yes Comments No
N/A
3. Were all the items in the QASP inspected?
Yes Comments No
N/A
4. Is the contract progressing on schedule?
Yes Comments No
N/A
5. Are there any significant issues to report?
Yes Comments No
N/A
6. Are there any discrepancies to report
Yes Comments No
N/A
7. Are there any customer complaints this month and if so how many?
Yes Comments No
N/A
8. Are there any issues for the Contracting Officer to be aware of?
Yes Comments No
9. Date the final goods or services were accepted? (MM/DD/YY)
Comments
10. Monthly COR Certification regarding personal services. If “YES”, describe what occurred, the date of occurrence, witnesses and other pertinent facts in the Corresponding comment field below.
a. A government employee asking the contractor to hire or remove a particular employee:
Yes Comments No
N/A
b. A government employee asking the contractor to reassign or discipline an employee:
Yes Comments No
N/A
c. A government employee asking the contractor to grant or deny leave to a contractor employee:
Yes Comments No
N/A
d. A government employee changing a contractor’s personnel duty hours:
Yes Comments No
e. A government employee asking the contractor to perform work outside the scope of the current contract without an official modification or direction by the Contracting Officer:
Yes Comments No
N/A
f. Contractor personnel appear to be under relatively continuous supervision and control by a Government employee:
Yes Comments No
N/A
g. Contractor personnel performing inherently Governmental work functions (i.e. serving in a decision-making capacity, making budget decisions, supervising, or rating Government employees, etc.) FAR 7.503:
Yes Comments No
COR Signature:
I certify that this report is in accordance with the terms and conditions of this contract in conjunction with the QASP and monthly surveillance schedule.
ATTACHMENT 3:
CUSTOMER COMPLAINT FORM
CUSTOMER COMPLAINT RECORD
DATE OF COMPLAINT
TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
INDIVIDUAL
NATURE OF COMPLAINT___________________________________________________________
CONTRACT REFERENCE
COMPLAINT VALIDATED BY
DATE CONTRACTOR INFORMED
TIME CONTRACTOR INFORMED
ACTION TAKEN BY CONTRACTOR_____________________________________________________
RECEIVED AND VALIDATED FINAL RESULTS
NOTES
ATTACHMENT 4:
GAO IDENTIFIED IMPORTANT TO THE HEALTH/WELFARE OF WORKING DOGS
EIGHTEEN GAO ISSUES IDENTIFIED AS IMPORTANT TO THE HEALTH AND WELFARE OF WORKING DOGS
ISSUE
EXAMPLE OF SUBJECTS ADDRESSED
Abuse and Neglect
How to prevent, identify, report, investigate, and sanction suspected abuse and neglect of working dogs.
Emergency Medical Care
How working dogs are to receive emergency medical care, either by a veterinarian or a trained handler.
Euthanasia
Conditions under which euthanasia is permissible, the decision-making process, and which officials have decision-making authority.
Exercise
Exercise for working dogs appropriate to weight and breed, including specific regimens (possibly developed in consultation with a veterinarian)
Food and Water
How working dogs are provided food and water, including timing of feeding, type and amount of food, and specific regimens (possibly developed in consultation with a veterinarian).
Grooming
Handler’s responsibilities for grooming working dogs; practices to be followed
Health and Welfare Training
The training related to the health and welfare of working dogs that handlers should receive
Housing
How working dogs are to be housed (either at a handler’s home or at a kennel), standards for housing, and contingencies when usual housing is unavailable.
Medical Needs After Retirement
Who has responsibility for addressing the medical needs of working dogs after they retire.
Medical Records
Requirements and practices for keeping and storing working dog medical records.
Medication
How to provide medication for working dogs, including frequency or types of medication and instructions for administering medication and safe storage of medication
Procurement
Requirements for procuring working dogs, including sourcing, providers, preferred breeds, selection criteria, health and temperament testing, and identification of responsible officials.
Rest and Length of On-Duty Time
Requirements for giving working dogs rest and off-duty time, including length of shifts and timing of breaks.
Retirement
Criteria for retiring working dogs and systems for determining who may adopt retired working dogs
Routine Veterinary Care
How frequently to take working dogs for routine veterinary care, issues addressed at periodic visits, and identification of officials responsible for ensuring that routine care takes place.
Routine Welfare Evaluations
Checks for health and well-being carried out by handlers at regular intervals, such as daily; procedures for such checks.
17 Sanitation Sanitation requirements for housing, vehicles, food and water.
Transportation
Characteristics of vehicles used to transport canines, provisions for transporting dogs in heat or cold, frequency of checks on dogs in vehicles, and practices for air travel.
| 1 INTRODUCTION |
| 1.1 Purpose |
| 1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the... |
| 1.1.2 This QASP defines the roles and responsibilities of all parties involved with the Canine Explosives Detection Support contract, which identifies the following: performance objectives, the methodologies used to monitor and evaluate the contractor... |
| 1.2 Performance Management Approach |
| 1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by... |
| 1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach mi... |
| 1.3 Performance Management Strategy |
| 1.3.1 The contractor is responsible for the quality of all services provided. The contractor measures that quality through the contractor’s own quality control (QC) program. The contractor’s QCP will set forth the staffing and procedures for self-insp... |
| 2 ROLES AND RESPONSIBILITIES |
| 2.1 The Contracting Officer |
| 2.2 The Contracting Officer’s Representative |
| 3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS |
| 4 METHODOLOGIES TO MONITOR PERFORMANCE |
| 4.1 Surveillance Techniques |
| 4.2 Customer Feedback |
| 4.3 Acceptable Quality Levels |
| 5 QUALITY ASSURANCE DOCUMENTATION |
| 5.1 The Performance Management Feedback Loop |
| 5.2 Monitoring Forms |
| 5.2.1 The COR will retain a copy of all completed QA surveillance forms. |
| 6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT |
| 6.1 Determining Performance |
| 6.1.1 Government shall use the monitoring methods cited to determine whether the service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what dat... |
| 6.2 Reporting |
| 6.2.1 At the end of each month (services/facilities are utilized), the COR will prepare a written report for the Bureau of Engraving and Printing summarizing the overall results of the quality assurance surveillance of the contractor’s performance. T... |
| 6.3 Reviews and Resolution |
| 6.3.1 The Bureau of Engraving and Printing (COR) may require the contractor’s project manager, or a designated alternate, to meet with the COR and other government personnel as deemed necessary to discuss performance evaluation items. The COR will de... |
| 6.3.2 The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance. |
| 6.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to service levels should be clearly documented. Changes to service levels, and procedures will be incorporated as a contract mo... |
| ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY |
| ATTACHMENT 3: |
| CUSTOMER COMPLAINT FORM |
File details come from the government source that posted it. Updated .