Attachment 5 Measurement and Payment.pdf

PDF 140 KB Posted

Attached to
Nick Foerstel Septic Federal contract opportunity
Solicitation number
75H70122Q00001
Issued by
Department of Health and Human Services Indian Health Service

View the file

Other files for this federal contract opportunity

Other files attached to Nick Foerstel Septic, newest first.
File Type Posted
B05 Amendment 1.pdf PDF
Attachment 1 Aerials.pdf PDF
Attachment 4 Bid Schedule.xlsx XLSX spreadsheet
Attachment 2 CO approved design.pdf PDF
B01 75H70122Q00001.pdf PDF
Attachment 6 DB Wage WA20210077.pdf PDF
Attachment 3 IHS Technical Provisions.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEASUREMENT AND PAYMENT FOR BID SCHEDULE

LINE ITEMS

MOBILIZATION AND DEMOBILIZATION

Payment for transportation of equipment, material, and personnel to and from the job site location (regardless of trips required), all required permits and fees, taxes, and all other necessary items to complete the work.

4” SOLID SEWER PIPE

Payment for solid sewer pipe as specified on the Design shall be made for the size of pipe listed based on the number of linear feet installed. Payment shall include excavation, backfill and compaction; all pipe and fittings; connection of the solid sewer pipe to an existing sewer service line or home; testing; resurfacing trenched areas to equal or better condition than existing; and all other necessary items for a complete and operational installation.

UNDERGROUND CLEANOUT (DOUBLESWEEP)

Payment for the underground cleanout as specified on the Design shall be made for the number of underground cleanouts installed. Payment shall include excavation, backfilling and compaction, all pipe and fittings, and all other necessary items for a complete and operational installation. No payment shall be made for cleanouts installed above grade as part of the connection to existing house, or as part of drop manholes.

1125 GALLON SEPTIC TANK

Payment for the septic tank shall be made at the contract unit price for the sizes listed based on the number of septic tanks installed. Compensation shall include payment for excavation, backfilling and compaction; sand or gravel where non-uniform native soil or groundwater is present, installing septic tank, baffles, two access risers and lids, effluent filter at the size specified in the design, inspection ports as required, all piping, electrical controls and alarm, valves and fittings in the tank, testing, and all other necessary items for a complete and operational installation.

1000 GALLON PUMP CHAMBER AND MYERS MES100 PUMP (OR EQUIVALENT)

WITH CONTROLS

Payment for pump chambers shall be made at the contract unit price based on the number of pump chambers installed. Compensation shall include payment for excavation, backfilling and compaction; lift station basin, effluent pump, lift station piping, valves and fittings, electrical controls and alarm, connection to the home electric panel, mercury level control switches, and all other necessary items for a complete and operational installation.

3” PVC SEWER FORCE MAIN

Payment for sewer force main pipe connections from the pump chamber to the drainfield manifold shall be made at the contract unit price for the sizes of pipe listed based on the number of linear feet installed. Compensation shall include payment for excavation, backfilling, pipe and fittings, connections, and all other necessary items for a complete and operational installation.

LOW PROFILE GRAVELLESS CHAMBER UNIT DRAINFIELD

Payment for gravelless infiltrator chamber drainfield shall be made at the contract unit price for the size of chamber units listed based on the number of linear feet installed. Compensation shall include payment for excavation, backfilling and compaction, manifold, valve box, chamber units and fittings, connections, perforated distribution pipes, threaded end caps, pressure testing, and all other necessary items for a complete and operational installation.