Attachment_5_Cost_Worksheet_Template.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
IFB 10217692 - Phytoplankton Analysis Services
Solicitation number
0000038784
Issued by
California

About this file

This is a Cost Worksheet Template for a state and local contract opportunity with the State of California Department of Water Resources (DWR) for IFB 10217692 - Phytoplankton Analysis Services. The template is designed for proposers to submit comprehensive cost proposals for phytoplankton identification, enumeration, and measurement services required under Water Right Decision 1641 and DWR special studies. The worksheet structure accommodates labor costs for key personnel across multiple classifications (Program Manager, Staff Assistant, Technician, Clerical), subcontractor costs, and allows for task-based cost breakdowns. Proposers must complete two primary sections: a General Cost Summary Worksheet listing all labor and non-labor costs with associated hourly rates and totals, and a Cost By Task Worksheet that allocates costs across specific project tasks and subtasks.

The General Cost Summary section requires proposers to itemize labor costs with options for loaded rates (indirect costs included) or actual rates with separate overhead calculations, along with sections for indirect costs including overhead and fringe benefits for both prime contractors and subcontractors. Direct costs beyond labor must be itemized and described, including travel, equipment and supplies, and other direct costs, with corresponding justifications. The Cost By Task Worksheet mandates that proposers use fully burdened hourly rates for consultant personnel and break down costs by individual tasks and subtasks, with columns for prime contractor, subcontractor, and total consultant costs. All subcontractor percentages must be shown with mathematical breakdowns rounded to two decimal places, and these percentages must align with the Bidder Declaration form and the General Cost Summary Worksheet totals.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS

GENERAL COST SUMMARY WORKSHEET
Proposer shall complete the General Cost Proposal Worksheet to list all associated cost such as labor cost for all key personnel (including subcontractors) who will be working on the project and include their job titles/classifications, hours of service, hourly rate, and total projected cost. Proposer shall list all direct and indirect costs including any miscellaneous costs in the General Cost Proposal Worksheet.
COST BY TASK WORKSHEET
Proposer shall complete the Total Cost By Tasks to breakdown the cost by tasks, subtasks, rate per hour and hours for each key personnel (including subcontractors) who will be working on this project and include their job titles/classification.
No miscellaneous or direct/indirect cost (other than labor) should be listed on the Cost By Task.
Additional Information Subcontractors
Proposer shall show the percentage math breakdown of all subcontractors declared. Please reference the cells used. Percentages shall be rounded to two decimal places. The Bidder Declaration form subcontractor percentage must match what is shown in General Cost Summary worksheet and your math breakdown.

&"-,Bold"INSTRUCTIONS&"-,Regular"

GENERAL COST SUMMARY

CONTRACTOR:CONTRACTOR NAME
GENERAL COST SUMMARY
PROJECT STAFF - LABOR COSTS
LABORHOURSRATETOTAL
rLoaded Rates (indirect costs included in the hourly rate)
rActual Rates (overhead listed below)
rOther (describe):
Job Title/Classification:Program Manager0@$0=$ - 0
Staff Assistant0@$0=$ - 0
Technician0@$0=$ - 0
Clerical0@$0=$ - 0
Sub-Totals:0@$0=$ - 0
SUBCONTRACTOR(S)
LABORHOURSRATETOTAL
rLoaded Rates (indirect costs included in the hourly rate)
rActual Rates (overhead listed below)
rOther (describe):
Job Title/Classification:0@0=$ - 0
OTHER
Other costs (describe)00$ - 0
Sub-Totals:0=$ - 0
INDIRECT COSTS (OVERHEAD AND FRINGE BENEFITS)
VARIABLERATETOTAL
Overhead Rate (general and administrative)0@0=$ - 0
Fringe Benefits0@0=$ - 0
Sub-Contractor Overhead Rate (general and administrative)0@0=$ - 0
SubContractor Fringe Benefits0@0=$ - 0
Sub-Totals:$ - 0
DIRECT COSTS (OTHER THAN LABOR)
Travel Costs0@0=$ - 0
Insert description(s) including number of trips and summary of costs.
Equipment and Supplies (Itemized)0@0=$ - 0
Insert description(s) including reason for product or service to be purchased.
Other Direct Costs (Itemized)0@0=$ - 0
Insert description(s) including item summary, and purpose/use
Sub-Contractor Travel Costs0@0=$ - 0
Insert description(s) including number of trips and summary of costs.
Sub-Contractor Equipment and Supplies (Itemized)0@0=$ - 0
Insert description(s) including reason for product or service to be purchased.
Sub-Contractor Other Direct Costs (Itemized)0@0=$ - 0
Insert description(s) including item summary, and purpose/use
Sub-Totals:$ - 0

TOTAL: $ - 0

GENERAL COST PROPOSAL WORKSHEET

COST BY TASK

CONTRACTOR COST SHEET
CONTRACTOR:CONTRACTOR NAME
NOTE: FOR CONSULTANT HOURLY RATES, USE FULLY BURDENED RATE. SEE GENERAL COST WORKSHEET
PRIME CONTRACTORSUBCONTRACTORSUBCONTRACTORTOTAL COST - ALL CONSULTANTS
NameSTAFF X (NAME)STAFF X (NAME)Total Cost ($$)STAFF X (NAME)STAFF X (NAME)Total Cost ($$)STAFF X (NAME)STAFF X (NAME)Total Cost ($$)
TitleJob Title/ClassificationJob Title/ClassificationJob Title/ClassificationJob Title/ClassificationJob Title/ClassificationJob Title/Classification
Rate Per Hour$0.00 per hour$0.00 per hour$0.00 per hour$0.00 per hour$0.00 per hour$0.00 per hour
HoursHoursHoursHoursHoursHours
FILL IN TASKS BELOW
ADD TASKS/SUBTASKS AS NECESSARY
TASK 1
Task 1.100$0.0000$0.0000$0.00
Task 1.200$0.0000$0.0000$0.00
Task 1.300$0.0000$0.0000$0.00
TOTAL ALL TASK 100$0.0000$0.0000$0.00$ - 0
TASK 2
Task 2.100$0.0000$0.0000$0.00
Task 2.200$0.0000$0.0000$0.00
TOTAL ALL TASK 200$ - 000$ - 000$ - 0$ - 0
TASK 3
Task 3.100$0.0000$0.0000$0.00
Task 3.200$0.0000$0.0000$0.00
Task 3.300$0.0000$0.0000$0.00
TOTAL ALL TASK 300$0.0000$0.0000$0.00$ - 0
TOTAL ALL TASKS
0.000.00$ - 0$ - 00.000.00$ - 0$ - 00.000.00$ - 0$ - 0

COST BY TASK WORKSHEET

File details come from the government source that posted it. Updated .