Attachment 5 - Buildind D Basement D-025 After Injection.pdf

PDF 785 KB Posted

Attached to
Identifying and Mitigating Water Leaks at US Government Publishing Office
Solicitation number
040ADV-24-Q-0038
Issued by

About this file

This is a series of photographs showing a basement room (D-025) after injection waterproofing treatment, which serves as documentation for GPO solicitation 040ADV-24-Q-0038. The images show white-painted concrete basement walls with exposed piping and utility infrastructure mounted on the walls and ceiling. The walls appear to have been recently treated, as evidenced by patched areas and fresh waterproofing applications visible on the concrete surfaces. Room identification numbers B-A29, B-A30, and B-A31 are visible on the walls.

The images provide visual documentation of the condition of approximately 1,350 square feet of basement walls following waterproofing treatment, showing the scope and scale of the area that received water infiltration mitigation. The photographs capture fluorescent lighting, exposed mechanical/plumbing systems, and the general industrial nature of the basement space. These appear to be "after" photos documenting completed waterproofing work, which relates to the broader solicitation's requirements for identifying and addressing water intrusion issues in this GPO facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .