Attachment 5 BOQ Unpriced.pdf
PDF 433 KB Posted
- Attached to
- Construction services to replace the sewer system and create ADA pedestrian ramp at Arnona - Jerusalem
- Solicitation number
- 191S4023Q9054
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendement A00001.pdf | ||
| SF-1442.pdf | ||
| Sol 191S4023Q9054.pdf | ||
| Letter to Prospective Offerors..pdf | ||
| Attachment 3 Specifications.pdf | ||
| Attachment 2 Scope of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LTD
A/e services to replace the sewer system and create ADA pedestrian ramp at
Arnona
Contract No.1910S40-22-c-0009
Bill of Quantities
(Unpriced)
Final Submission
April, 10th, 2023 Warning :This document is the property of the U.S. Government.
Further reproduction and for distribution is prohibited without the express written permission of :American Embassy .18 AGRON Road –
Jerusalem. Information on this document is not to be altered except with the written approval of this individual whose seal appears hereon.
No.
Description Unit Qty Unit Rate NIS) Total (NIS)
1 The contractor, shall when pricing the rates of this bill take into consideration all cost occur upon him and allow for the cost and expenses of all requirements stipulated in the special specifications, drawings and general specifications of the contract, according to engineer`s requirements.
1.1 Dismantle and removal of the stone stairs where indicated on drawings. The price includes removing the fill below the tiles and throwing all the debris away outside the site in a legal manner to an approved place. all according to drawings and instructions given by the engineer. Sheet A102
Sq.m 8
1.2 Dismantle the existing stone tiles. Job includes removing fill below the tiles as per engineer's requirements. The price includes throwing all the debris away outside the site in a legal manner to an approved place. All according to instructions given by the engineer.
Sheet A102
Sq.m 30
1.3 Demolish the existing slab on grade. The price includes cutting the splab on grade neatly with a special saw and removing all the debris away outside the site in a legal manner to an approved place.
All according to instructions given by the engineer. Sheet A102
Sq.m 30
1.4 Excavation where indicated on drawings for the ramp wall
foundation until reaching the required level. The price includes removing any type of soil or rocks or concrete. All according to instructions given by the engineer. Sheet A102 m3 25
1.5 Dismantle and removal of the water trench where indicated on drawings. The price includes throwing away all the debris outside the site in a legal manner to an approved place. All according to instructions given by the engineer. Sheet A102
Job 1
ADA Pedestrian Ramp
General Services Office - Procurement
Arnona - Jerusalem
Total of Bill # 1
17% VAT
Total of Bill # 1 (Including VAT)
1 - Demolishing and Excavation Works
Description Unit Qty Unit Rate (NIS) Total (NIS)
1 - Demolishing and Excavation Works
2 The contractor shall, when pricing the rates of this bill, take into consideration including and allowing for the costs or expenses of all requirements stipulated in the preambles, drawings and technical specification of the tender.
Rates for concrete work shall include for :
Vibrating and packing around reinforcement and between
Formwork.
Curing and sprinkling.
Work of any cross-sectional area and at any height.
Grading, tamping and toweling.
Steel Reinforcement
Formwork and metal ties
Forming grooves, throats, holes, chases, rebates, chamfers, splayed angles, molding and the like.
Forming mortifies and grouting in.
2.1 Supply & place Plain concrete (Grade B150) . 100 mm thick blinding concrete under foundations over one layer of 500 micron thickness of polyethylene sheet. All according to instructions given by the engineer. Sheet A204
Sq.m 20
2.2 Supply all the materials needed to cast reinforced concrete B300 for the wall foundations. The price includes the steel reinforcement as per the details. All according to the instructions given by the engineer. Sheet A204 m3 6
2.3 Supply all the materials needed to cast reinforced concrete
B200 for slab on grade 10cm thick, steel reinforcement
Ø8/20cm in both directions, price includes a layer of polyethylene sheets 0.5mm thick. The price includes anchoring the steel (with epoxy) with the existing wall for the ramp and with the existing slab on grade for the extension slab. All according drawings and engineer's instructions. Sheet A202
Sq.m 25
2.4 Supply all the materials needed to cast reinforced concrete
B300 for the ramp wall 20 cm thick. The price includes the steel reinforcement as per details. All according drawings and engineer's instructions. Sheet A204
Sq.m 20
2.5 Supply all the materials needed to cast reinforced concrete
B300 for the stair flight. The price includes the steel reinforcement as per details. All according drawings and engineer's instructions.
Sheet A204 m3 0.75
2.6 Supply and well compact base coarse Class "A" (see specification sheet) above the foundations and under the ramp slab on grade and the stair flight. Price to include watering, leveling and compacting of ground (sub -base ) under base coarse to min 95% field density to comply with modified proctor test ( AASHTO Density test T -80) complete as per specifications.
m3 30
2- Concrete and basecoarse works
Total of Bill # 2
17% VAT
Total of Bill # 2 (Including VAT)
1 - Demolishing and Excavation Works
3 The contractor, shall when pricing the rates of this bill take into consideration all cost occur upon him and allow for the cost and expenses of all requirements stipulated in the special specifications, preambles, drawings and general specifications of the contractor, and whatever neccessary to accomplish the work according to engineer`s requirement and specifications.
3.1 Supply and install stone floor tiles similar to existing matching with color, texture, origin and specs, where specified on drawings.
Price includes the mortar below the tiles from sand and cement.
Price also includes the aggregate fill under the tiles. Price includes also the pointing works similar to the existing one. All works are done according to instructions given by the engineer. Sheet A202
Sq.m 30
3.2 Supply and install 3 cm stone similar to existing for wall cladding. The price includes a ϕ6 galvanized steel mesh 10x10 cm bolted to the concrete wall with jumbo bolts with epoxy every 50 cm in both directions with spacers. The price includes fixing the stone to the steel mesh an leaving 5 cm space between the stone and the concrete wall. the price also includes pouring B250 concrete between the concrete wall and the stone. The price includes drilling 4 holes in the stone and fixing the stones to the steel mesh with galvanized steel wires 4mm. The price also includes the pointing works of the stone. All according to drawings and instructions given by the engineer. Sheet A204
Sq.m 15
3.3 Supply and install coping stone, same stone types and rendered similar to existing, 35 cm width, 7cm thickness and rendered on three sides for the wall top. The price includes the pointing works and the mortar under the coping. All according to drawings and instrcutions given by the engineer.
Sheet A202
M.r 17
3.4 Supply and install stone tiling for the stairs. The price includes a 5 cm thick Matabah stone for the step and a 3 cm thick matabah stone for the riser. The stone shall be similar to the existing stone. The price includes the ifll and the mortar unter the tiles and the pointing works. All according to instructions given by the engineer. Measurments are taken by meter run including the step and the riser. Sheet A204
M.r 10
Total of Bill # 3
3- Stone works
17 % VAT
Total of Bill # 3 (Including VAT)
1 - Demolishing and Excavation Works
4 The contractor, shall when pricing the rates of this bill take into consideration all cost occur upon him and allow for the cost and expenses of all requirements stipulated in the special specifications, preambles, drawings and general specifications of the contractor, and whatever neccessary to accomplish the work according to engineer`s requirement and specifications.
4.1 Supply and install cement plaster on walls 13mm thick where specified by the engineer, prepare surfaces and apply in three coats of rough and fine finish with ordinary Portland cement, sand and lime. It shall also include for all stop beads, angle beads. First layer rough cement to sand ratio 1:2. 2nd layer rough cement to sand ratio 1:4. third layer fine cement to sand ratio 1:4. The plaster to be applied from the slab on grade to the coping. All according to instructions given by the engineer.
M.r 17
4.2 Supply and apply colored plaster on the walls where indicated on drawings. The price includes applying one coat of special white primer on the wall and then applying the colored plaster with the color chosen by the engineer. The works shall be done once only and not phases on each or wall surface. All works are done according to instructions given by the engineer. Sheet A202
M.r 17
Total of Bill # 4
17 % VAT
Total of Bill # 4 (Including VAT)
4- Plastering works
1 - Demolishing and Excavation Works
5 The contractor, shall when pricing the rates of this bill take into consideration all cost occur upon him and allow for the cost and expenses of all requirements stipulated in the special specifications, preambles, drawings and general specifications of the contractor, and whatever neccessary to accomplish the work according to engineer`s requirement and specifications.
5.1 Supply and install a galvanized steel balustrade for the ramp where indicated on the drawings. Guardrail to be at 1070mm height. The price includes a 50mm diameter galvanized handrail at
950mm height, 10mmx50mm rectangular section galvanized railings every 100 mm, 50mm diameter galvanized handrail at
750mm height, 6mm thick galvanized steel plate 110mmx150mm with four 100mm bolts anchored into the concrete wall. The price includes all the welding, bolting, drilling. The price also includes painting the handrails with two coats of rough granulated paint from tambour, dulux or equivalent. All according to the drawings and details and the instructions given by the engineer. Sheet A203
M.r 20
5.2 Supply and install wall mounted galvanized steel handrails where indicated on drawings. The price includes 50mm diameter galvanized steel handrail with thickness 4mm at heights 750mm and 950mm looped at the ends as shown in the drawings. The price includes all the mounting accessories such as bolts and anchors.
The price includes the galvanized steel hangers every 1200mm. The price also includes painting the handrails with two coats of rough granulated paint. All according to drawings and details and instructions given by the engineer. Sheet A203
M.r 20
5.3 Ditto, but only one tube at 900mm for the stairs Sheet A203 M.r 6
Total of Bill # 5
17 % VAT
Total of Bill # 5 (Including VAT)
5- Steel works
Description Unit Qty Unit Rate (NIS Total (NIS)
1 - Demolishing and Excavation Works
6 The contractor, shall when pricing the rates of this bill take into consideration all cost occur upon him and allow for the cost and expenses of all requirements stipulated in the special specifications, preambles, drawings and general specifications of the contractor, and whatever neccessary to accomplish the work according to engineer`s requirement and specifications.
6.1 Supply and apply a layer of waterproofing Sikalastic 320 NS from
Sika or equivalent for the foundation and the wall. The price includes cleaning the concrete surface very well before applying the layer. All according to the product instructions and instructions given by the engineer. Sheet A202
Sq.m 50
17 % VAT
Total of Bill # 6 (Including VAT)
6- Insulation works
Total of Bill # 6
Section Works Totals/ NIS
1 Demolishing and excavation works
2 Concrete and basecoarse works
3 Stone works
4 Plastering works
5 Steel works
6 Insulation works
TOTAL
17% VAT
Summary
GRAND TOTAL INCLUDING VAT
ADA Pedestrian Ramp
Arnona - Jerusalem
General Services Office-Procurement
1 The contractor, shall when pricing the rates of this bill take into consideration all cost occur upon him and allow for the cost and expenses of all requirements stipulated in the special specifications, drawings and general specifications of the contract, according to engineer`s requirements.
1.1 Dismantle the existing stone tiles. Job includes removing fill below the tiles as per engineer's requirements. The price includes throwing all the debris away outside the site in a legal manner to an approved place. All according to instructions given by the engineer. Sheet A101
Sq.m 65
1.2 Demolish the existing slab on grade. The price includes cutting the slab on grade neatly with an electric saw and removing all the debris away outside the site in a legal manner to an approved place.
All according to instructions given by the engineer. A101
Sq.m 65
1.3 Dismantle and removal of the old manholes of any type that are marked to be removed on the drawings. The price includes the excavation works and the cutting or drilling of any type of soil or rock. The price includes clogging the remaining old pipes with concrete. The price includes throwing away all the debris outside the site in a legal manner to an approved place. All according to instructions given by the engineer. A101
Job 1
Total of Bill # 1 (Including VAT)
Sewer System
Arnona - Jerusalem
General Services Office - Procurement
1 - Demolishing and Excavation Works
Total of Bill # 1
17% VAT
1 - Demolishing and Excavation Works
2 The contractor shall, when pricing the rates of this bill, take into consideration including and allowing for the costs or expenses of all requirements stipulated in the preambles, drawings and technical specification of the tender.
2.1 Supply all the materials needed to cast reinforced concrete
B200 for slab on grade 10cm thick, steel reinforcement
Ø8/20cm in both directions, price includes a layer of polyethylene sheets 0.5mm thick. The price includes anchoring the steel (with epoxy) with the existing slab on grade. All according drawings and engineer's instructions. Sheet A18
Sq.m 65
2- Concrete works
Total of Bill # 2
17% VAT
Total of Bill # 2 (Including VAT)
1 - Demolishing and Excavation Works
3 The contractor, shall when pricing the rates of this bill take into consideration all cost occur upon him and allow for the cost and expenses of all requirements stipulated in the special specifications, preambles, drawings and general specifications of the contractor, and whatever neccessary to accomplish the work according to engineer`s requirement and specifications.
3.1 Supply and install stone floor tiles similar to existing matching with color, texture, origin and specs, where specified on drawings.
Price includes the mortar below the tiles from sand and cement.
Price also includes the aggregate fill under the tiles. Price includes also the pointing works similar to the existing one. All works are done according to instructions given by the engineer.
Sq.m 65
Total of Bill # 3
17 % VAT
Total of Bill # 3 (Including VAT)
3- Stone works
1 - Demolishing and Excavation Works
General Provisions of Mechanical Works
Preambles:
The Bills of Quantities shall be read in conjunction with the
Instructions to Bidders, General and Special Conditions of
Contract, Technical Specifications, and Drawings. The documents are to be taken as mutually explanatory and inter-related to one another.
Unless otherwise mentioned, all quantities of works shall be measured “Net” in accordance to the drawings or/as ordered by the engineer, and generally, according to method of payment mentioned in the tender documents.
The Unit Price and the rates inserted in the Bills of Quantities respectively shall be comprehensive and shall include for complying in all respects with the requirements of the Technical
Specifications, drawings and all other related tender documents.
This shall cover all the obligations under the contract and all matters deemed necessary for the proper construction, completion and remedy of defects in the works. No claims for additional payment will be allowed for any error, misunderstanding or failure to aquatint with all necessary information of the work.
The unit prices inserted in the Bill of Quantity shall be of fixed rates. The contractor shall not be entitled for new rates should the quantities be altered during the construction and execution of the works.
In the Bill of Quantities, a unit price or rate shall be inserted against its respective item with quantities only. The value of any item left unpriced shall be deemed to be to be included in the total cost of the BOQ.
All measurements of the executed works called for in the Contract shall be based on the unit price stated in the Bills of Quantities and made according to the specifications. Any work done by the
Contractor, but not called for in the Contract or not requested in writing by the Engineer, shall not be included in the measurement.
The unit rate of the materials and equipment shall be based on the
Specification, all components as required and specified under each item concerned in the Specifications, Technical Data and Notes on
Contract Drawings, and all other Contract documents
The Bills of quantities are classified under headings and sections with the same reference numbers and titles as the specifications.
Each section referred to in the Bills of quantities shall be read in conjunction with the respective section and with all other related sections of specifications.
The Bills of Quantities, Specifications, Schedule of Equipment and
Drawings and all other Contract documents are complementary to each other.
It is the responsibility of the Contractor to check the locations and quantities of the materials and equipment to be executed in accordance with the contract drawings.
Any discrepancy between the Drawings and Specifications and Bill of Quantities shall be brought to the notice of the engineer in writing for his decision as to which is the correct interpretation before the commencement of the work. In General, Drawings shall take preference over those stated in the Specifications.
4- Mechanical works
1 - Demolishing and Excavation WorksIn the case of discrepancy in quantities of works performed by the contractor and those shown on the drawings, and should such discrepancy be acceptable to the employer, then the quantities agreed by the Engineer shall be taken into account in the measurement of quantities.
The Contractor shall be responsible for all the works deemed necessary to complete the scope of work . For this purpose the Bill of Quantities shall be used for guidance only and all works shall be carried out as shown on drawings, and covered in the
Specifications. All materials quantities shall be re measured on site after execution, and payment be made be made in accordance to the executed works.
The contractor should take into consideration that the unit price of all BOQ items shown below shall include all works and tasks mentioned in the below points and are are not intended to be used by the contractor for the ordering of materials.
1. Supply of materials and equipment.
2. Off loading and handling to place of installation.
3. Installation of materials and equipment.
4. All civil and builders work , whether temporary or permanent, as required for the complete installation, including :-
a. Excavation, bedding backfilling, riggings, hoisting, water proofing, cleaning, protection and painting.
b. Concrete plinths, bases and supports.
c. Chasing through walls and slabs, cutting and pinning for passage of all pipes conduits ducts, pipe sleeves, and equipment.
5. Testing & Commissioning: -
a. All testing, balancing, adjusting, commissioning and handling to client complete operational equipment.
b. All testing, balancing, adjusting, commissioning and handling to client complete operational systems.
c. All testing materials.
6. Painting, cleaning, proper protection of all equipment, plants, pipes, ducts, insulations, electrical installations and structures.
7. Disinfections, flushing and water treatment.
8. All labor, materials, tools, instruments, electric power supply fuel and water required for installation, testing, balancing, adjusting, disinfections, flushing, operation and commissioning.
9. Coordination with other trades
10. System identifications, tags, labels, nameplates, and charts.
11. Shop-drawings and record drawings.
12. Spare parts and components for ideal running of all services and equipment.
13. Spare parts information and tools.
14. Operation and maintenance manuals.
15. Samples as required by the Engineer.
16. Inspection, testing and rejection of all materials and workmanship.
17. Maintenance of all items supplied by contractor as per contract conditions .
18. Warranty and manufacturer guarantee for a period as specified, but not less than one year.
19. Coordination with other contractors, and specialty suppliers.
1 - Demolishing and Excavation Works20. Coordination with the structural and civil works and providing all necessary details and information for all related systems, such as vibration control, structural openings plinth and equipment loads, kinetic floating slabs, etc...
21. Works to be carried out according to the local code and the requirements of Gihon, and Environment authorities, with no additional costs on BOQ items prices or even submitted as
Variation Order costs.
22. The contractor responsibility to submit as built drawings by end of the project, and all needed sections and detail drawings with dimensions as per engineer's instructions.
23. Contractor should provide material submittals to the supervisor engineer for his study and approval prior to supplying material to the site.
In addition to the above, the unit price shall include the following:
The Contractor has to fix the under ground services that may be damaged during his work.
The Contractor should include in his price the costs of sampling and testing as required and according to technical specifications and work requirements.
Price will include costs of removing and/or relocating of all obstacles such as debris, garbage, trees and existing services in addition to the required materials necessary for work completion according to engineer's instructions and specifications.
The Contractor should include in his price the costs of cut and removal of trees , trees roots, backfilling, watering ,compaction in layers with clean sand as specified and according to the Engineer instructions.
Price should include costs of adjusting the levels of existing manholes (in any diameter) to suit the new situation. Replacing covers, frames, rings if defected and all materials and work required to complete the task.
Price should include costs of cutting and removing of the Existing Asphalt pavement layer as well as the existing base coarse or granular fill and transport it wherever directed by the engineer to the related
Municipality.
1 - Demolishing and Excavation Works1 Sewage Pipes
Supply, install and test of HDPE pipes , of external sewage system, conformed with local codes and specifications. The price includes excavation, drilling in any type of soil, rock or asphalt up to the appropriate levels (as shown on drawings and as per site) and placing a layer of sand under the pipes, on their sides and above, with a thickness of 15 cm thick and tamping by Plain Concrete with a thickness fit with the levels, shown in the drawings, conforming to the compaction with the specifications of civil works and cover the pipes with concrete (according to the local authority requirements), taking into consideration with civil works, in addition to coordination with routes locations of electrical installations, water and fire installations (where existing), connection and making tendencies for pipes with all necessary connections, rubber rings, special materials Leak- and pressure-proof for 24 hours before damming and implementation according to plans, specifications and instructions of the supervisor engineer.
1.1 160 mm diameter HDPE sewage pipe. MR 170
1.2 110 mm diameter HDPE sewage pipe. MR 30
2 Sewage Manholes
Supply, install, and test of reinforced precast concrete manholes of
15cm thickness for walls and 20cm for bottom slab, with depths as shown on drawing schedule, with all necessary fittings, excavation, back filling as specified to the required depth. The price includes medium duty cast iron covers of weight bearing load 12.5 Tons (to be written on covers SEWAGE), with steel rim, fine coarse benching and plastering, cast iron steps for manholes of depth more than 1.2 m, including connections to upvc pipes to main existing manholes, all as shown in drawings, and approval of supervisor engineer, and as follows:
2.1 Manhole of 100cm Diameter. No. 1
2.2 Manhole of 150cm Diameter. No. 6
3 Plastering and Benching Works
Benching works of the existing manholes along with the angle of new entry and exit sewage pipes connected to manholes. The works include plastering of the manholes walls, repairing and cracks treatment (where found) using special certified and approved compound. The price includes closing of the existing openings of old (cancelled) pipes connected to manholes with cement compound of approved material, manhole leakage testing and all needed works to complete the job, as per engineer's instructions.
No. 6
4 Gutter Trench
Labor works for construction of new concrete trench , according to location shown in drawing, with approximate dimensions of
1.2X0.5m, including its cast iron gutter of medium duty load. The price includes supplying and installing of galvanized steel frame of
3mm thick. The price shall also incude all materials needed to connect the trench to existing drainage pipes through 8/4" P-trap with strainer on top,all as per site conditions and engineer's instructions.
Job 1
Total of Bill # 4
17 % VAT
Total of Bill # 4 (Including VAT)
1 Demolishing and excavation works
2 Concrete works
3 Stone works
4 Mechanical works
17% VAT
GRAND TOTAL INCLUDING VAT
Sewage system
Arnona - Jerusalem
General Services Office-Procurement
Summary
TOTAL
1 Ramp works
2 Sewer works
17% VAT
GRAND TOTAL INCLUDING VAT
Replace the sewer system and create ADA pedestrian ramp
Arnona - Jerusalem
General Services Office-Procurement
Summary
TOTAL
File details come from the government source that posted it. Updated .