1 HazMat Questionnaire 3 3 5 Days Prior to Start Date

2 HazMat MSDS 3 5 Days Prior to Start Date

Must be filled out if contractor answers YES to the Hazmat

Questionnaire

3 Hazmat Reporting Entry Form 3 3 5 Days Prior to Start Date

Submit Final Quantities

4 Hazmat Reporting Entry Form 3 3 End of

Contract

5 Recycling and Landfill Report 3 3 End of

Contract

Warranty (Manufacturer's)

End of

Contract

1-Year Warranty (Contractor)

End of

Contract

Chiller - Per Drawing Schedule M100

3 3 3 3 3

Within 14 days

NTP/start date

Door/Door Frames - Per Spec Section 08 11 13 08 21 10

3 3 3

Within 14 days

NTP/start date

DATE TO CIVIL

ENGINEERING

FINAL APPROVAL

RETURN

SUSPENSE DATE

REMARKS

CONTRACTOR

RESUBMITTAL

DATE CONTRACTOR

NOTIFIED

APPROVED

DIS-

APPROVED

SUBMITTAL REGISTER

Project Number

MAHG 07-1039

Project Name

Repair HVAC Traning Facility B4331

TO BE COMPLETED BY PROJECT MANAGER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

D A

T A

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

D O

C U

M E

N T

R

E P

O R

T

REQUIRED

SUBMISSION DATE

I T E M

N U M B E R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

S H

O P

D R

A W

IN

G

S

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

S A

M P

LE

S

NO. OF COPIES REQUIRED

C O

LO

R

S E

LE

C

T

IO

N

Last Revision made on 3 August 2020

1512685222A Highlight

DATE TO CIVIL

ENGINEERING

FINAL APPROVAL

RETURN

SUSPENSE DATE

REMARKS

CONTRACTOR

RESUBMITTAL

DATE CONTRACTOR

NOTIFIED

APPROVED

DIS-

APPROVED

SUBMITTAL REGISTER

Project Number

MAHG 07-1039

Project Name

Repair HVAC Traning Facility B4331

TO BE COMPLETED BY PROJECT MANAGER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

D A

T A

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

D O

C U

M E

N T

R

E P

O R

T

REQUIRED

SUBMISSION DATE

I T E M

N U M B E R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

S H

O P

D R

A W

IN

G

S

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

S A

M P

LE

S

NO. OF COPIES REQUIRED

C O

LO

R

S E

LE

C

T

IO

N

Door Hardware - Per Spec Section 08 71 00

3 3

Within 14 days

NTP/start date

Ceiling Tile/Grid - Per Sec Section 09 51 10

1 1 1 1 3 3

Within 14 days

NTP/start date

Waste Piping-Cast Iron - Per Spec Section 22 00 00

3 3

Within 14 days

NTP/start date

Hydronic Piping-Chill Water Per Spec Section 22 00 00

3 3 Within 14 days NTP/start

Hydronic Piping - Hot Water Per Spec Section 22 00 00

3 3 Within 14 days NTP/start

Hydronic Piping/Valves - Per Spec Section 22 00 00 & 23 00 00

3 3

Within 14 days

NTP/start date

Hydronic Piping/Fittings/Gauges - Per Spec Section 22 00 00 & 23 00 00

3 3

Within 14 days

NTP/start date

FINAL APPROVAL

RETURN

SUSPENSE DATE

REMARKS

CONTRACTOR

RESUBMITTAL

DATE CONTRACTOR

NOTIFIED

APPROVED

DIS-

APPROVED

SUBMITTAL REGISTER

Project Number

MAHG 07-1039

Project Name

Repair HVAC Traning Facility B4331

TO BE COMPLETED BY PROJECT MANAGER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

D A

T A

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

D O

C U

M E

N T

R

E P

O R

T

REQUIRED

SUBMISSION DATE

I T E M

N U M B E R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

S H

O P

D R

A W

IN

G

S

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

S A

M P

LE

S

NO. OF COPIES REQUIRED

C O

LO

R

S E

LE

C

T

IO

N

Piping-Hangers - Per Spec Section 22 00 00/23 00 00

3 3

Within 14 days

NTP/start date

Piping - Insulation - Per Spec Section 23 07 00

3 3

Within 14 days

NTP/start date

Boiler - Per Drawing M100 & Spec Section 23 00 00

3 1 3 3 3

Within 14 days

NTP/start date

Expansion Tank - Per Drawing M100 & Spec Section 23 52 00

1 1 3 3 3

Within 14 days

NTP/start date

Hot Water Make Up Water Assy - Per Spec Section 23 00 00

1 3 3

Within 14 days

NTP/start date

Pumps-Base Mount - Per Drawing M100 & Spec Section 23 00 00

3 3

Within 14 days

NTP/start date

Suction Diffuser - Per Spec Section 23 00 00

3 3

Within 14 days

FINAL APPROVAL

RETURN

SUSPENSE DATE

REMARKS

CONTRACTOR

RESUBMITTAL

DATE CONTRACTOR

NOTIFIED

APPROVED

DIS-

APPROVED

SUBMITTAL REGISTER

Project Number

MAHG 07-1039

Project Name

Repair HVAC Traning Facility B4331

TO BE COMPLETED BY PROJECT MANAGER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

D A

T A

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

D O

C U

M E

N T

R

E P

O R

T

REQUIRED

SUBMISSION DATE

I T E M

N U M B E R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

S H

O P

D R

A W

IN

G

S

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

S A

M P

LE

S

NO. OF COPIES REQUIRED

C O

LO

R

S E

LE

C

T

IO

N

Triple Duty Valve - Per Spec Section 23 00 00

Within 14 days

NTP/start date

Air Vents - Per Spec Section 23 00 00

3 3

Within 14 days

NTP/start date

Chemical Pot Feeder - Per Spec Section 23 64 26

1 3 3

Within 14 days

NTP/start date

Ductwork - Per Spec Section 23 00 00

1 3 3

Within 14 days

NTP/start date

Diffusers/ Grilles - Per Spec Section 23 00 00

1 3 3

Within 14 days

NTP/start date

Fire Dampers - Per Spec Section 23 00 00

1 3 1 3

Within 14 days

NTP/start date

Duct Access Doors - Per Spec Section 23 00 00

1 3 1 3

Within 14 days

FINAL APPROVAL

RETURN

SUSPENSE DATE

REMARKS

CONTRACTOR

RESUBMITTAL

DATE CONTRACTOR

NOTIFIED

APPROVED

DIS-

APPROVED

SUBMITTAL REGISTER

Project Number

MAHG 07-1039

Project Name

Repair HVAC Traning Facility B4331

TO BE COMPLETED BY PROJECT MANAGER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

D A

T A

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

D O

C U

M E

N T

R

E P

O R

T

REQUIRED

SUBMISSION DATE

I T E M

N U M B E R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

S H

O P

D R

A W

IN

G

S

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

S A

M P

LE

S

NO. OF COPIES REQUIRED

C O

LO

R

S E

LE

C

T

IO

N

Duct Connectors - Per Spec Section 23 00 00

Within 14 days

NTP/start date

Ductwork Insulation - Per Spec Section 23 00 00

3 3

Within 14 days

NTP/start date

Dampers - Per Spec Section 23 00 00

3 3

Within 14 days

NTP/start date

HVAC Controls - Per Spec Section 23 00 00

1 3 3 3

Within 14 days

NTP/start date

Supply/Return Difusers - Per Spec Section 23 00 00

3 3

Within 14 days

NTP/start date

34 Louvers - Per Spec 23 00 00 3 3 3

Within 14 days

NTP/start date

Variable Frequency Drives - Per Spec Section 23 81 00

1 3 3 3 3

Within 14 days

FINAL APPROVAL

RETURN

SUSPENSE DATE

REMARKS

CONTRACTOR

RESUBMITTAL

DATE CONTRACTOR

NOTIFIED

APPROVED

DIS-

APPROVED

SUBMITTAL REGISTER

Project Number

MAHG 07-1039

Project Name

Repair HVAC Traning Facility B4331

TO BE COMPLETED BY PROJECT MANAGER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

D A

T A

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

D O

C U

M E

N T

R

E P

O R

T

REQUIRED

SUBMISSION DATE

I T E M

N U M B E R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

S H

O P

D R

A W

IN

G

S

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

S A

M P

LE

S

NO. OF COPIES REQUIRED

C O

LO

R

S E

LE

C

T

IO

N

VAV Boxes - Per Drawings M100 & Spec Section 23 00 00

1 3 3 3 3

Within 14 days

NTP/start date

Within 14 days

NTP/start date

Exhaust Fans - Per Drawing M100 & Spec Section 23 00 00

1 3 3 3 3

Within 14 days

NTP/start date

Cooling Tower Shaft - Per Spec Section 23 00 00

1 3 3

Within 14 days

NTP/start date

Cooling Tower Motor - Per Spec Section 23 00 00

1 3 3

Within 14 days

NTP/start date

Cooling Tower MU Valve - Per Spec Section 23 00 00

Within 14 days

NTP/start date

Cooling Tower VFD - Per Spec Section 23 00 00

1 3 3 3

Within 14 days

FINAL APPROVAL

RETURN

SUSPENSE DATE

REMARKS

CONTRACTOR

RESUBMITTAL

DATE CONTRACTOR

NOTIFIED

APPROVED

DIS-

APPROVED

SUBMITTAL REGISTER

Project Number

MAHG 07-1039

Project Name

Repair HVAC Traning Facility B4331

TO BE COMPLETED BY PROJECT MANAGER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

D A

T A

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

D O

C U

M E

N T

R

E P

O R

T

REQUIRED

SUBMISSION DATE

I T E M

N U M B E R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

S H

O P

D R

A W

IN

G

S

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

S A

M P

LE

S

NO. OF COPIES REQUIRED

C O

LO

R

S E

LE

C

T

IO

N

Lighting Controls - Per Drawings E000- E400

1 3 3 3 3

Within 14 days

NTP/start date

LED Fixtures - Per Drawing E000 - E400

1 3 3 3 3

Within 14 days

NTP/start date

Exit Fixtures - Per Drawing E000 - E400

1 3 3 3

Within 14 days

NTP/start date

Multizone Heat Pump Units W/heat Recovery - Per Drawing M100

1 3 3 3 3 3

Within 14 days

NTP/start date

Conduit & Devices - Per Spec Section 23 03 00 & Drawing E000-E400

3 3

Within 14 days

NTP/start date

Sheetmetal - Per Spec Section 23 00 00

3 1 3 3 Within 14 days NTP/start

As-Builts - Paper & Digital - Per Spec 01000/01150/01780A

Project Completion

FINAL APPROVAL

RETURN

SUSPENSE DATE

REMARKS

CONTRACTOR

RESUBMITTAL

DATE CONTRACTOR

NOTIFIED

APPROVED

DIS-

APPROVED

SUBMITTAL REGISTER

Project Number

MAHG 07-1039

Project Name

Repair HVAC Traning Facility B4331

TO BE COMPLETED BY PROJECT MANAGER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

D A

T A

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

D O

C U

M E

N T

R

E P

O R

T

REQUIRED

SUBMISSION DATE

I T E M

N U M B E R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

S H

O P

D R

A W

IN

G

S

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

S A

M P

LE

S

NO. OF COPIES REQUIRED

C O

LO

R

S E

LE

C

T

IO

N

O&M Manuals - 3 Paper or digital copies - Per Spec Section 01001

3 3 Project Completion

Chiller/Boiler Start-up (1 EA) - Per Spec Section 01001/23 00 00

Project Completion