Attachment_4_Submittals.pdf
PDF 171 KB Posted
- Attached to
- KS-FLINT HILLS NWR-PIN TAIL MARCH REHAB
- Solicitation number
- 140F0122R0122
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_6_Questions_and_Answers.pdf | ||
| Attachment_2_Specs.pdf | ||
| Attachment_5_WDOL_Davis_Bacon_Wages.pdf | ||
| Attachment_3_Drawings.pdf | ||
| Attachment_1_Bid_Schedule.pdf | ||
| Sol_140F0122R0122.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET 1 OF 1
PROJECT NAME: PIN TAIL MARSH WCS REHAB ENGR. PROJECT NO.: 21-042
LOCATION: FLINT HILLS NWR CONTRACT NO.:
CONTRACTOR:
Spec.
Section
Number
Spec.
Paragraph
No.
Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals, etc.)
Contractor's
Submittal
Number
Date
Submitted
Action
Taken
Date
Resubmitted
Action
Taken Comments
033000 2.2 Steel reinforcement
033000 2.7 Joint filler
033000 2.8 Concrete mix
033000 2.10 Culvert
033000 2.10.E Stop Logs
312000 2.1.B Subbase material
312000 2.1.C Base material
312000 2.1.D Engineered fill
313215 2.2 Riprap
313215 2.2 Riprap bedding
321500.1 2.1 Aggregate
NOTE: The list may not included all required items.
PROJECT SUBMITTAL LIST
A - Approved as Submitted.
B - Approved, Except as Noted. No Resubmission Required.
C - Approved, Except as Noted. Resubmission Required.
D - No Action Taken. See Comments. Resubmission Required.
E - disapproved. See Comments. Resubmission Required.
File details come from the government source that posted it. Updated .