Attachment 4 - Submittal Register.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Remove & Replace Bullet Proof Glass Bldg. 906
Solicitation number
FA663326QA009
Issued by

About this file

This is a Submittal Register template establishing the documentation and approval workflow for a bullet-proof glass replacement contract at Building 906. The register outlines all required submittals from the contractor throughout the project lifecycle, organized by specification section and submission category. Preconstruction submittals include contact personnel lists, baseline construction schedules, submittal registers, accident prevention plans, and activity hazard analyses. Product data submittals cover warranty management plans, manufacturer instructions, and bullet-resistant component specifications with required certifications. Shop drawings for installation of bullet-resistant components must be submitted with product data and certificates of compliance. Additional required submittals include test reports, accident reports, inspection reports, hot work permits, as-built drawings, and equipment/materials warranties. Each submittal line item references specific paragraph numbers from the contract specifications and identifies the appropriate specification section and submission designation (SD-01 through SD-11). The template includes columns for contractor action dates, approval authority review and approval dates, remarks, and action codes to track the submittal status and approvals throughout project execution.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
SUSTAIN BULLET-PROOF GLASS, B906CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
01 14 00SD-01 Preconstruction Submittals
List of Contact Personnel1.4.1.1
01 32 16.00 20SD-01 Preconstruction Submittals
Baseline Construction Schedule1.2G
01 33 00SD-01 Preconstruction Submittals
Submittal Register1.7G
01 35 26SD-01 Preconstruction Submittals
Accident Prevention Plan (APP)1.7.1G
SD-06 Test Reports
Accident Reports1.11.2G
LHE Inspection Reports1.11.3
SD-07 Certificates
Activity Hazard Analysis (AHA)1.8G
Certificate of Compliance1.11.4
Hot Work Permit1.12
01 78 00SD-03 Product Data
Warranty Management Plan1.4.1
SD-08 Manufacturer’s Instructions
Instructions1.4.1
SD-11 Closeout Submittals
As-Built Drawings3.1G
As-Built Record of Equipment
and Materials
Warranted Equipment and1.4.1
Materials
08 34 02SD-02 Shop Drawings
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
SUSTAIN BULLET-PROOF GLASS, B906CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
08 34 02Installation3.3G
SD-03 Product Data
Bullet Resistant Components1.4
SD-07 Certificates
Bullet Resistant Components1.4

File details come from the government source that posted it. Updated .