Attachment 4 - Submittal Register.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Remove & Replace Bullet Proof Glass Bldg. 906
- Solicitation number
- FA663326QA009
About this file
This is a Submittal Register template establishing the documentation and approval workflow for a bullet-proof glass replacement contract at Building 906. The register outlines all required submittals from the contractor throughout the project lifecycle, organized by specification section and submission category. Preconstruction submittals include contact personnel lists, baseline construction schedules, submittal registers, accident prevention plans, and activity hazard analyses. Product data submittals cover warranty management plans, manufacturer instructions, and bullet-resistant component specifications with required certifications. Shop drawings for installation of bullet-resistant components must be submitted with product data and certificates of compliance. Additional required submittals include test reports, accident reports, inspection reports, hot work permits, as-built drawings, and equipment/materials warranties. Each submittal line item references specific paragraph numbers from the contract specifications and identifies the appropriate specification section and submission designation (SD-01 through SD-11). The template includes columns for contractor action dates, approval authority review and approval dates, remarks, and action codes to track the submittal status and approvals throughout project execution.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| SUBMITTAL REGISTER | CONTRACT NO. | |||
| TITLE AND LOCATION | ||||
| SUSTAIN BULLET-PROOF GLASS, B906 | CONTRACTOR | |||
| A C T I V I T Y | ||||
| N O | T R A N S M I T T A L | |||
| N O | S P E C | |||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 14 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| List of Contact Personnel | 1.4.1.1 | |||||||||||||||||
| 01 32 16.00 20 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Baseline Construction Schedule | 1.2 | G | ||||||||||||||||
| 01 33 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Submittal Register | 1.7 | G | ||||||||||||||||
| 01 35 26 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Accident Prevention Plan (APP) | 1.7.1 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Accident Reports | 1.11.2 | G | ||||||||||||||||
| LHE Inspection Reports | 1.11.3 | |||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Activity Hazard Analysis (AHA) | 1.8 | G | ||||||||||||||||
| Certificate of Compliance | 1.11.4 | |||||||||||||||||
| Hot Work Permit | 1.12 | |||||||||||||||||
| 01 78 00 | SD-03 Product Data | |||||||||||||||||
| Warranty Management Plan | 1.4.1 | |||||||||||||||||
| SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Instructions | 1.4.1 | |||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| As-Built Drawings | 3.1 | G | ||||||||||||||||
| As-Built Record of Equipment | ||||||||||||||||||
| and Materials | ||||||||||||||||||
| Warranted Equipment and | 1.4.1 | |||||||||||||||||
| Materials | ||||||||||||||||||
| 08 34 02 | SD-02 Shop Drawings | |||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | ||||||||||||||||||
| SUSTAIN BULLET-PROOF GLASS, B906 | CONTRACTOR | |||||||||||||||||
| A C T I V I T Y | ||||||||||||||||||
| N O | T R A N S M I T T A L | |||||||||||||||||
| N O | S P E C | |||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 08 34 02 | Installation | 3.3 | G | |||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| Bullet Resistant Components | 1.4 | |||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Bullet Resistant Components | 1.4 |
File details come from the government source that posted it. Updated .