Attachment 4 Submittal Register.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Repair B777 Fitness Club Exterior Panel Joints
Solicitation number
FA663325Q0002
Issued by

About this file

This file is a submittal register attachment (Attachment 4) in Excel format that appears to be a template or form related to a solicitation for repairing exterior panel joints at Building 777 Fitness Club at Minneapolis-St Paul Air Reserve Base.

The associated solicitation (FA663325Q0002) is a total small business set-aside with an estimated value between $25,000-$100,000. The Department of the Air Force is seeking contractors to provide supervision, labor, materials and equipment for fitness center exterior wall joint repairs. The work falls under NAICS code 236220 (Commercial and Institutional Building Construction) with a $45 million size standard. A site visit is scheduled for March 12, 2025 at 12:00 PM CST, with quotes due 30 days after solicitation issuance. Contractors must be registered in SAM.gov with completed representations and certifications under NAICS 236220 to be eligible for award.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
QJKL250004Project Title:
SUSTAIN PANEL JOINTS,B777Solicitation / Contract Number:

[ enter here ]

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies RequiredRemarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission Date

fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

Submittal Numbers fergusog: Enter the Submittal Number

Date Contractor
NotifiedContractor Resubmittal

fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date

(MM/DD/YY)

Approved fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

1Baseline Construction Schedulex
2Certificatesx
3Monthly Updatesx
4PreconstructionSchedule: Submittal Registerx
5Product Data
6a) Sealantsxxxx
7b) Primersxx
8c) Bond Breakersxxx
9d) Backstopsxxx
10e) Cleaning Solventsxx
11f) Field Adhesionxx
12
13
14
15
16
17
18
19
20
21
22
23
24
25

&"Verdana,Bold"&12Schedule of Material Submittals &12Print on Legal size paper ( 8 x 14 ).