Attachment 4 Submittal Register.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- Repair B777 Fitness Club Exterior Panel Joints
- Solicitation number
- FA663325Q0002
About this file
This file is a submittal register attachment (Attachment 4) in Excel format that appears to be a template or form related to a solicitation for repairing exterior panel joints at Building 777 Fitness Club at Minneapolis-St Paul Air Reserve Base.
The associated solicitation (FA663325Q0002) is a total small business set-aside with an estimated value between $25,000-$100,000. The Department of the Air Force is seeking contractors to provide supervision, labor, materials and equipment for fitness center exterior wall joint repairs. The work falls under NAICS code 236220 (Commercial and Institutional Building Construction) with a $45 million size standard. A site visit is scheduled for March 12, 2025 at 12:00 PM CST, with quotes due 30 days after solicitation issuance. Contractors must be registered in SAM.gov with completed representations and certifications under NAICS 236220 to be eligible for award.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| QJKL250004 | Project Title: | ||
| SUSTAIN PANEL JOINTS,B777 | Solicitation / Contract Number: |
[ enter here ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| Number of Copies Required | Remarks | |||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date |
fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
Submittal Numbers fergusog: Enter the Submittal Number
| Date Contractor | ||
| Notified | Contractor Resubmittal |
fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date
(MM/DD/YY)
Approved fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
| 1 | Baseline Construction Schedule | x | |||||
| 2 | Certificates | x | |||||
| 3 | Monthly Updates | x | |||||
| 4 | PreconstructionSchedule: Submittal Register | x | |||||
| 5 | Product Data | ||||||
| 6 | a) Sealants | x | x | x | x | ||
| 7 | b) Primers | x | x | ||||
| 8 | c) Bond Breakers | x | x | x | |||
| 9 | d) Backstops | x | x | x | |||
| 10 | e) Cleaning Solvents | x | x | ||||
| 11 | f) Field Adhesion | x | x | ||||
| 12 | |||||||
| 13 | |||||||
| 14 | |||||||
| 15 | |||||||
| 16 | |||||||
| 17 | |||||||
| 18 | |||||||
| 19 | |||||||
| 20 | |||||||
| 21 | |||||||
| 22 | |||||||
| 23 | |||||||
| 24 | |||||||
| 25 |
&"Verdana,Bold"&12Schedule of Material Submittals &12Print on Legal size paper ( 8 x 14 ).
&P of &N