Attachment 4 - QASP.pdf
PDF 203 KB Posted
- Attached to
- On-Site Radiation Oncology Physician Services
- Solicitation number
- 36C24824Q0237_RFQ
About this file
This Quality Assurance Surveillance Plan outlines the performance standards and evaluation methods for on-site radiation oncology physician services to be provided under Solicitation Number 36C24824Q0237_RFQ. Key details include performance requirements in areas such as provider qualifications and availability, standard operating procedures, patient reports and documentation, and privacy and confidentiality. Performance will be monitored by methods such as direct observation, periodic inspection, and random sampling of documentation. Performance ratings include exceptional, very good, satisfactory, marginal, and unsatisfactory. The Quality Assurance Surveillance Plan must be acknowledged by both the Contracting Officer's Representative and the contractor.
The related federal contract opportunity seeks proposals for on-site board-certified radiation oncology physician services to be provided to eligible beneficiaries at the San Juan VA Medical Center. Services must adhere to accreditation and quality standards set by recognized organizations such as the American College of Radiology and American Society for Radiation Oncology. The opportunity is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
The contractor will be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored?
• How monitoring will take place.
• Who will conduct the monitoring?
• How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract.
The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Jayne Messer Organization or Agency: Network Contracting Office (NCO) 08
b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Julio Cintron-Aponte Organization or Agency: VA San Juan Medical Center (VASJMC)
3. CONTRACTOR REPRESENTATIVES
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.
Primary: Julio Cintron-Aponte________________________________________________
Alternate: __________________________________________________
4. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. 100% surveillance: COR will make quarterly spot-checks as to the staff performance.
b. PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed. Ten (10) randomly selected patient files will be reviewed per year. All inspections and reports will be conducted in compliance with VA Privacy and Information security standards.
c. VALIDATED USER/CUSTOMER COMPLAINTS. Customer complaints will be monitored by the COR and discussed generally at the weekly staff meeting, and specifically if needed with the staff member.
d. RANDOM SAMPLING. Five (5) randomly selected patient files will be reviewed per quarter. All reviews and reports will be conducted in compliance with VA Privacy and Information security standards.)
e. Verification and/or documentation provided by Contractor: All documentation will be verified by the COR.
6. QASP PERFORMANCE Report DATE: ____________
Measure PWS Para.
Performance Requirement Standard
Acceptable Quality Level
Surveillance Method Incentive Disincentive/
Deduct
Qualifications and Availability of Key Personnel
4.7.1 Radiation
Oncology Physicians, shall be board certified and in accordance with national recognized accrediting body standards.
100%; Radiation Oncology Physicians, shall be board certified and in accordance with national recognized accrediting body standards.
100% Periodic Sampling of qualification documentation and medical records submitted in accordance with contractor reporting requirements
Favorable contactor performance evaluation.
Unfavorable contractor performance evaluation
Standard Operating Procedures (SOP) for all radiotherapy techniques
4.7.2 All (100%) of
radiotherapy techniques employed by the Contractor, such as Conventional External Beam, IMRT, IGRT, SBRT, SRS, etc., have written procedures in accordance with radiotherapy practice standards. All (100%) of procedures are followed by Contractor.
100% of procedures are documented and reviewed and updated annually.
90% Random Sampling of procedure documentation and medical records submitted in accordance with facility reporting requirements.
Favorable contractor performance evaluations
Unfavorable contractor performance evaluation
Provider Quality Performance
4.7.6 OPPE
documentation for all (100%) staff providing services under the contract. All staff (100%) meet Standards.
Ongoing Provider Performance Evaluation (OPPE) data pertinent to Radiation Oncology care performed for each provider working under this contract.
The Contractor shall furnish OPPE data on new providers added to the contract at three months, six months and semi-annual thereafter. The OPPE data shall be provided to ___Identify VAMC Staff __________ for Service. OPPE data should include the following elements:
A.
Patient Care Performance B.
Medical/Clinical knowledge C. Practiced Based Learning and Improvement D. Interpersonal and Communication Skills E.
Professionalism F-system Based Practice Frequency:
Biannually
90% meet relevant radiotherap y practice standards
Biannually Favorable contactor performance evaluation.
Unfavorable contractor performance evaluation
Patient Reports and Documentation
4.5.1.10 All notes must be
electronically signed, and all encounters closed within 24 hrs.
Compliance with VA Rules and Regulations
95% Periodic Inspection and Random Sampling
Favorable contractor performance evaluation
Unfavorable contractor performance evaluation
Peer Review Conferences/ Chart Rounds
4.5.1.9
Conduct Weekly Peer Review Conferences/Ch art Rounds as required by the
PWS.
Peer Review Conferences/Ch art Rounds conducted, documented and reported as required.
90% Periodic Inspection & Verification and/or documentation provided by Contractor
Favorable contactor performance evaluation.
Unfavorable contractor evaluation
Maintains licensing, registration, and certifications
2.1. Updated
Licensing, registration and certifications will be provided as they are renewed.
100% Licensing and registration information kept current.
100% Periodic Sampling and Random Sampling
Favorable contactor performance evaluation.
Unfavorable contractor performance evaluation
Mandatory Training
2.6. Contractor
completes all mandatory required training
All Training (100%) completed as required per VAMC policy
100% Contractor to provide documented evidence
Favorable contactor performance evaluation.
Suspension or termination of all physical and/or electronic access privileges and removal from contract until such time as the training is complete
Privacy, Confidentiality and HIPAA
4.4 Contractor is
aware of all laws, regulations, policies, and procedures relating to Privacy, Confidentiality and HIPPA and complies with all standards.
Communicating test results to providers and patients under VHA Directive 1088 policy.
Zero breaches of privacy or confidentiality
100%
Contractor to provide evidence of annual training required by VAMC, reports violations per policy
Favorable contactor evaluation.
Depending on severity of offense, suspension, or termination of all physical and/or electronic access privileges and removal from contract. until such time as the training is complete.
Professionalism & Conduct 2.13
Contractor employees maintain excellent relationships with patients, Radiation Oncology staff members, VA Medical Center staff members, and vendors.
Zero complaints from VA Medical Center staff members related to the contractor’s employee interfering with patient care or the ordinary operation of the facility.
100%
COR
notification of complaints
Favorable contractor performance evaluation.
Removal of contractor’s employee from key personnel list.
7. CPAR RATINGS ASSIGNED TO QASP ITEMS:
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used (Reference: CPARS User Manual https://www.cpars.gov/documents/CPARS-Guidance)
EXCEPTIONAL: Contractor always meets the standard. Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
VERY GOOD:
Contractor almost always meets the standard, always performs over the Acceptable Quality Level. Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.
SATISFACTORY:
Contractor occasionally meets the standard, but more often meets the Acceptable Quality Level. Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.
MARGINAL:
Contractor most often meets the Acceptable Quality Level, occasionally does not meet the Acceptable Quality Level and CDRs have been reported. Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTORY:
Contractor has history of not meeting Acceptable Quality Level. Significant efforts have been made to bring Contractor into performance. Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
https://www.cpars.gov/documents/CPARS-Guidance
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).
8. DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT
REPORT (CPAR).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Report (CR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample CR below.
9. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
COR NAME/TITLE DATE
SIGNED:
CONTRACTOR NAME/TITLE DATE
| QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) |
| Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP. |
File details come from the government source that posted it. Updated .